Class 701 'Aventra' trains for South Western Railway: progress updates

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

TEW

Established Member
Joined
16 May 2008
Messages
6,228
Is this as in a second diagram or as an afternoon "fill in" on the existing diagram?
The current diagram will change to run Windsor all day. Then Shepperton will be an additional diagram. I'm not sure if these two changes are planned on the same date.
 

TEW

Established Member
Joined
16 May 2008
Messages
6,228
The plan for the 701 diagram next week, but don't shoot the messenger if it doesn't happen;
2U09 0633 Waterloo to Windsor
2U16 0751 Windsor to Waterloo
2U19 0903 Waterloo to Windsor
2U26 1021 Windsor to Waterloo
2U29 1133 Waterloo to Windsor
2U36 1251 Windsor to Waterloo
2U39 1403 Waterloo to Windsor
2U46 1521 Windsor to Waterloo
2U49 1633 Waterloo to Windsor
2U56 1751 Windsor to Waterloo
2U59 1903 Waterloo to Windsor
2U66 2021 Windsor to Waterloo
2U69 2133 Waterloo to Windsor
2U76 2251 Windsor to Waterloo
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,228
The plan for the 701 diagram next week, but don't shoot the messenger if it doesn't happen;
2U09 0633 Waterloo to Windsor
2U16 0751 Windsor to Waterloo
2U19 0903 Waterloo to Windsor
2U26 1021 Windsor to Waterloo
2U29 1133 Waterloo to Windsor
2U36 1251 Windsor to Waterloo
2U39 1403 Waterloo to Windsor
2U46 1521 Windsor to Waterloo
2U49 1633 Waterloo to Windsor
2U56 1751 Windsor to Waterloo
2U59 1903 Waterloo to Windsor
2U66 2021 Windsor to Waterloo
2U69 2133 Waterloo to Windsor
2U76 2251 Windsor to Waterloo
Thanks for the info.
 

swr444

Member
Joined
26 Aug 2008
Messages
1,019
Location
London
The plan for the 701 diagram next week, but don't shoot the messenger if it doesn't happen;
2U09 0633 Waterloo to Windsor
2U16 0751 Windsor to Waterloo
2U19 0903 Waterloo to Windsor
2U26 1021 Windsor to Waterloo
2U29 1133 Waterloo to Windsor
2U36 1251 Windsor to Waterloo
2U39 1403 Waterloo to Windsor
2U46 1521 Windsor to Waterloo
2U49 1633 Waterloo to Windsor
2U56 1751 Windsor to Waterloo
2U59 1903 Waterloo to Windsor
2U66 2021 Windsor to Waterloo
2U69 2133 Waterloo to Windsor
2U76 2251 Windsor to Waterloo
short term planning crew diagrams next week have these all down as duties now so pretty much confirmed
 

pompeyfan

Established Member
Joined
24 Jan 2012
Messages
4,445
It’s good to see there is finally progress with the project, what with the all day diagram and the strong hint they’ll start appearing on Sheppy services. Still a very long way to go and I expect some hiccups to come.
 

SWT_USER

Member
Joined
29 Aug 2010
Messages
1,183
Location
Ashford Middx
Good news, and if the diagram posted is right then it will be my train home! :D

My one moan would be that they are avoiding the busiest period of both peak travel directions with this diagram - and SWR should be concentrating the few remaining 10 carriage trains on the busiest services. 10 carriages would benefit more people on the 06:56 or 07:26 from Windsor - although presumably not as operationally convenient for SWR.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,448
Good news, and if the diagram posted is right then it will be my train home! :D

My one moan would be that they are avoiding the busiest period of both peak travel directions with this diagram - and SWR should be concentrating the few remaining 10 carriage trains on the busiest services. 10 carriages would benefit more people on the 06:56 or 07:26 from Windsor - although presumably not as operationally convenient for SWR.
Seems like a fairly gentle ramp up after so many previous failures. Makes sense to me.
 

TEW

Established Member
Joined
16 May 2008
Messages
6,228
At least a full diagram actually releases stock for strengthening elsewhere.
The change to the current diagram from next week doesn't release any additional stock. It might not feel like it but with the current diagram despite only being three services it is covering an entire diagram. That's why it switched from the 3 AM Windsor round trips.
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,254
Location
UK
My one moan would be that they are avoiding the busiest period of both peak travel directions with this diagram
That is the nature of diagrams and 'new' stock to service. In the early days of passenger running, new stock (ie 701) will more than likely be required to start from/finish at the relevant maintenance depot (Wombleland in this case I suspect?) and the very nature of such diagrams often means that they miss one (or both) core peak hours in the main flow direction. To start swapping/switching such diagrams (and related crew diagrams) in the peak periods for what might only be a few weeks - to match busiest services from day one - will put undue risk in to the plan. The more units come 'on line' over the coming weeks, the faster the roll out will happen, allowing a greater number of services to regain 10 car format over coming months, but to mix and match diagrams during this very early stage of the roll out, could cause more problems than it solves.
I had this very discussion with one or two senior people in relation to the 458/5 rollout plans over a decade ago (in relation to one train in particular), but after explaining a number of pertinent facts relating to the diagram in question, they came to understand that the train concerned, although % wise was top of the most overcrowded of the Windsor side services due to gain 458/5, it had to wait its spot in the overall plan, if that plan was to roll out as smoothly as wished. As it was this was about half way through said plan, and was partly reliant on additional stabling space coming on line.
 

SWT_USER

Member
Joined
29 Aug 2010
Messages
1,183
Location
Ashford Middx
That is the nature of diagrams and 'new' stock to service. In the early days of passenger running, new stock (ie 701) will more than likely be required to start from/finish at the relevant maintenance depot (Wombleland in this case I suspect?) and the very nature of such diagrams often means that they miss one (or both) core peak hours in the main flow direction. To start swapping/switching such diagrams (and related crew diagrams) in the peak periods for what might only be a few weeks - to match busiest services from day one - will put undue risk in to the plan. The more units come 'on line' over the coming weeks, the faster the roll out will happen, allowing a greater number of services to regain 10 car format over coming months, but to mix and match diagrams during this very early stage of the roll out, could cause more problems than it solves.
I had this very discussion with one or two senior people in relation to the 458/5 rollout plans over a decade ago (in relation to one train in particular), but after explaining a number of pertinent facts relating to the diagram in question, they came to understand that the train concerned, although % wise was top of the most overcrowded of the Windsor side services due to gain 458/5, it had to wait its spot in the overall plan, if that plan was to roll out as smoothly as wished. As it was this was about half way through said plan, and was partly reliant on additional stabling space coming on line.
Thanks. I do get the reasons for it, and hopefully things will ramp up more quickly now anyway. Out of interest is that the only Windsor diagram that starts and ends at Wimbledon Park? Or could they have chosen another (not that it would necessarily have made any difference to my point).
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,254
Location
UK
Out of interest is that the only Windsor diagram that starts and ends at Wimbledon Park?
Can't comment, as I'm long out of the industry, but that is how previous new stock roll outs have commenced. Was just basing my comments on the diagram posted above, and assuming it is a Wimbledon start/finish? My thinking that one wouldn't want the first few diagrams of new stock starting and ending at outlying locations where there is no access to maintenance facilities. That is asking for failure. After the first few are up and running with regular reliability then I suspect over night stabling elsewhere will start to happen, albeit this has to happen so that unit numbers are 'balanced' each night at each location, which in itself, can also lead to some diagrams working trains that are perhaps not the most critical in loading terms. If I were a betting man, Clapham Yard may well also take a major roll initially, due in part to its proximity to Wimbledon, whereby any failures can be tripped between the two without too much headache. But I speak from past events, so I may be wide of the mark?
 

DMckduck

Member
Joined
26 Jul 2020
Messages
488
Wonder if we could move toward a stage where the number of units fit for passenger service is holding the rollout back.

Does anyone know how many are currently considering the small sample size in the soft launch?
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,910
Location
London
Wonder if we could move toward a stage where the number of units fit for passenger service is holding the rollout back.

Does anyone know how many are currently considering the small sample size in the soft launch?
Pretty sure it was around 5 - 6 units passenger ready(tested) and then in addition to those a few specfically for driver training use.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,889
Wonder if we could move toward a stage where the number of units fit for passenger service is holding the rollout back.

Does anyone know how many are currently considering the small sample size in the soft launch?
So that begs the question of what progress is being made with unit commissioning.

It would be so very, very SWR to start having trained crews available but then find there’s no trains for them to work because commissioning hadn’t been done.
 

swr444

Member
Joined
26 Aug 2008
Messages
1,019
Location
London
Wonder if we could move toward a stage where the number of units fit for passenger service is holding the rollout back.

Does anyone know how many are currently considering the small sample size in the soft launch?
According to ASLEF, only 3 are deemed useable in passenger service currently
 

swr444

Member
Joined
26 Aug 2008
Messages
1,019
Location
London
From an ASLEF perspective what is stopping the units used for driver training from entering passenger service?

I can't imagine they could care less about the passenger areas.
I’m not sure if it’s an ASLEF thing unfortunately
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,910
Location
London
No. But it is fewer than six!

See post ~9,000
Totals, first and most recent outings
701043 (58) January 16th, July 24th
701037 (45) January 9th, July 23rd
701039 (35) January 10th, August 16th
701036 (13) March 7th, August 22nd
701028 (3) February 6th, February 9th


Last update list i could find of units used in the soft launch diagram
 

SWT_USER

Member
Joined
29 Aug 2010
Messages
1,183
Location
Ashford Middx
I’m not sure if it’s an ASLEF thing unfortunately
I misunderstood your post as meaning ASLEF had only agreed 3 were fit for passenger service.

Pretty poor so few are ready but given the fiasco it's been so far I guess we shouldn't be surprised. Given how long some of the units have been in storage I hope there's not any major work required or problems with damp/ mould.
 