I'm guessing no one has been able to get a quick picture of it on the runs it's been doing?
I've just noticed they don't have a "pantograph well". Is that also true on the original 458's?
Almost makes me wish I was still at Strawberry Hill, I won't be learning them at Fratton!
Spotted a 458 being hauled though Wimbledon earlier on what must have been this working: http://www.realtimetrains.co.uk/train/O44430/2013/12/05/advanced
So, would that be the first of the 458/0s off for conversion? Sorry, didn't catch the unit number.
Identified elsewhere as 458002
8001/2 are supposed to be the first ones to be converted so I wonder if 8001 has already gone, unnoticed.

I'd say it's pretty much a certainty the 456s will enter service first, crew training has apparently started either now or will be starting imminently.
The two new services which are being introduced as a result of the introduction of the 456s are in the timetable from May 2014:
http://www.opentraintimes.com/schedule/W13621/2014-05-21
http://www.opentraintimes.com/schedule/W13622/2014-05-21
I don't think that the 458/5s have had many faults in the operational sense, just a few minor teething trouble incidents. The conversion however is a different matter because of all the corrosion. It is not a case of "not fit for purpose" but more "contract is running massively delayed"
Indeed, but it's not really a surprise that they have been delayed. To have any 458/5s in service by May would be a start.So they are, but the two extra Reading line trains in each peak which are supposed to be introduced in May do not appear. However, Open Train Times isn't completely accurate as the Ascot to Guildford services are shown as having First class, but as I understand it these will be the first services to get the 456s.
Indeed, but it's not really a surprise that they have been delayed. To have any 458/5s in service by May would be a start.
It's assumed that that will be the case, but they could well just been incorrectly entered in the system and they won't convey First Class.
So they are, but the two extra Reading line trains in each peak which are supposed to be introduced in May do not appear. However, Open Train Times isn't completely accurate as the Ascot to Guildford services are shown as having First class, but as I understand it these will be the first services to get the 456s.
--- old post above --- --- new post below ---
It must be more significant than minor problems. Back in October SWT were saying the first pair would be in service in November. Something is clearly not right, or alternatively, SWT aren't really that bothered about getting them into service.
SWT are probably holding off until the next pair are delivered. My guess is that they want another pair to start testing before they release the first into service.
Yes, that would be the pair that was due in December but never appeared. There's also the platform monitors andd stop boards yet to fully install, and there's no sign of that happening yet. Strangely, some stations have the 10 car boards covered up, while others don't. Seems a bit illogical.
The only time 10-car 444s and 458/5s would call at the same platform is when mainline services are diverted via Staines. Then 10-car 444s would call at the Windsor line platforms at Clapham Junction, which previously would only have accommodated up to 8-carriages.
The only time 10-car 444s and 458/5s would call at the same platform is when mainline services are diverted via Staines. Then 10-car 444s would call at the Windsor line platforms at Clapham Junction, which previously would only have accommodated up to 8-carriages.