• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 387

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

KT530

Member
Joined
12 Jan 2013
Messages
186
I agree that the announcements are endlessly clear to the point of annoying!

I suppose the commuters used to 2 car 165s have yet to learn that trains longer than 6 coaches are possible! 8 is a shock, but 12 must be so unbelievable to them that they don't believe it!

The time taken at Maidenhead is simply the sheer volume of passengers walking through to coach 8 to alight. That many people from 4 coaches can't all stand in coach 8 ready to get off. Simply not enough time in the timetable when 12. Same at Reading, not enough time to detach the rear 4.

Said train (1D93) was short-formed as an 8 the next day (Friday) and worked a lot better, leaving Maidenhead, Twyford and Reading on time, then followed a slightly late running freight train Reading - Didcot.

Current operational restrictions means when 8-car it was also able to do the extra 10 mph between Stockley Jct and Maidenhead compared to when formed of 12, which probably gave it an extra minute or so.
 

gwr4090

Member
Joined
9 Nov 2011
Messages
144
As the GW Class 387 units don't have GW-ATP, are they permitted to exceed 100mph on the main lines ? Are they fitted with ETCS yet ready for when this is eventually installed in place of the current GW-ATP (including to Heathrow) ?
 

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,385
Well I don't know what the limits are now but I rode on the 1942 fast to Maidenhead not long after they started last year and I can definitely say my GPS speedo clocked 110 on more than one occasion.
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,522
110mph max except-

100mph max East of Stockley Bridge Jn
100mph max when operating in 12 car formation

Rules regarding GW-ATP were relaxed to 110mph a few years ago in anticipation of 387 introduction.

Not currently ETCS fitted.
 

wls1

Member
Joined
6 Jan 2017
Messages
312
Location
North Essex
Something to do with the spacing between pantographs or something or the amount of them I believe. IETs have 2 pantos and can do more than 100, same with 8 car 387s.
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,522
why would 3 pantos cause a problem?

It’s to do with the amount of force put on the contact wire.

A 10 car IET has 2 pans in the space a 12 car 387 has 3, while I think high speed 3-pan operation was in the GW electrification specification; the older equipment east of Stockley isn’t up to it - and they’re giving the newer stuff a little time to bed in.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
why would 3 pantos cause a problem?
as the pantograph goes along the wire, it causes a vertical wave behind it. The faster the train (as I understand it) the bigger the wave. So a second pantograph will find it harder to stay in contact due to bouncing, so it needs a higher contact force. But obviously they all have the same contact force, so although you may have solved the issue with the second one, the wave is bigger already from the first one, and now the wire, on older OHLE, is really bouncing, but of course because the wire has a stagger and tracks aren't straight, there's also going to be lateral movement there too. So that third pantograph could be in trouble.

As far as I understand it, the basic remedy is higher tension in the contact wire. Which requires heavier duty equipment.

In Japan some Shinkansen services formed of 2 sets can have 3 or more pantographs up at 170mph I think
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,157
As far as I understand it, the basic remedy is higher tension in the contact wire. Which requires heavier duty equipment.

Which is, I believe, what has lead to complaints in some corners about unsightly "over-engineered" OLE equipment.
 

APUK002

Member
Joined
26 Dec 2016
Messages
315
Is this be same reason for why GN 387’s aren’t allowed to do 110 ,yet 700’s are?
 
Last edited:

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,732
Location
Central Belt
Do great western allow you to use the corridor connections?

GTR great northern don’t - reason from then below.

“I have also been informed that the decision to lock the doors was taken after extensive health and safety reviews that started in the design stage of their construction, and also when they were being assessed for the networks. These doors can be unlocked by either the driver or the onboard staff should the need arise.”

I personally don’t believe what they are saying. If Great Western and GTR southern do I will be very interested to understand why it only impacts these trains when the run on the EcML. ( no issues on Thameslink.
 

spark001uk

Established Member
Joined
20 Aug 2010
Messages
2,385
Do great western allow you to use the corridor connections?

GTR great northern don’t - reason from then below.

“I have also been informed that the decision to lock the doors was taken after extensive health and safety reviews that started in the design stage of their construction, and also when they were being assessed for the networks. These doors can be unlocked by either the driver or the onboard staff should the need arise.”

I personally don’t believe what they are saying. If Great Western and GTR southern do I will be very interested to understand why it only impacts these trains when the run on the EcML. ( no issues on Thameslink.
They do yes, one example I can think of is the 12 car workings that stop at places like maidenhead where only the front 8 open, and there's always a stream of pax walking through from the back 4.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,715
Location
West of Andover
I think there is an inbound 12coach working a stopping service from Reading in the evening (goes out as semi-fast) where the rear unit is locked out of use until Paddington.

(16:48 Reading - Paddington)
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,732
Location
Central Belt
They do yes, one example I can think of is the 12 car workings that stop at places like maidenhead where only the front 8 open, and there's always a stream of pax walking through from the back 4.

I suspect GTR great northern are not being entirely honest, and inconveniencing passengers as a result. Especially at SDO stations and before the train splits so passengers that used to walk through the train now need to get off and walk on the platform.
 

APUK002

Member
Joined
26 Dec 2016
Messages
315
Do great western allow you to use the corridor connections?

GTR great northern don’t - reason from then below.

“I have also been informed that the decision to lock the doors was taken after extensive health and safety reviews that started in the design stage of their construction, and also when they were being assessed for the networks. These doors can be unlocked by either the driver or the onboard staff should the need arise.”

I personally don’t believe what they are saying. If Great Western and GTR southern do I will be very interested to understand why it only impacts these trains when the run on the EcML. ( no issues on Thameslink.
Exactly what I think,perhaps they could help out(southern e.g)?
 

Saj8

Member
Joined
2 Jan 2018
Messages
60
Do the 387’s have stop markers,like the 700’s do?

Yes, they do.

All platforms where 387s operate have new PSMs (Platform Stop Markers.) Some are co located with the old turbo markers, (particulartly the S boards where the passenger entrance to the platform is at the far end) but most are at new locations on the platform.

They are similar to the IET boards, and consist of a square plate with a black and yellow hash border. They have solid blue circle with a 4, 8, 12 or S inside. On platforms where SDO is in operation there is a rectangular plate underneath the main square board which states, "EMU SDO x".

So for example at a 7 car platform there will be a 4 car board just over half way along, and then an 8 car board with an EMU SDO 7 plate underneath it at the far end.

New poster, but long time lurker. Hello all!
 

APUK002

Member
Joined
26 Dec 2016
Messages
315
Yes, they do.

All platforms where 387s operate have new PSMs (Platform Stop Markers.) Some are co located with the old turbo markers, (particulartly the S boards where the passenger entrance to the platform is at the far end) but most are at new locations on the platform.

They are similar to the IET boards, and consist of a square plate with a black and yellow hash border. They have solid blue circle with a 4, 8, 12 or S inside. On platforms where SDO is in operation there is a rectangular plate underneath the main square board which states, "EMU SDO x".

So for example at a 7 car platform there will be a 4 car board just over half way along, and then an 8 car board with an EMU SDO 7 plate underneath it at the far end.

New poster, but long time lurker. Hello all!
Do you have photos of them?
 

Saj8

Member
Joined
2 Jan 2018
Messages
60
Do you have photos of them?
I'm afraid not. I just have a graphic of one as it appeared in one of the operational documents.

2vngfie.jpg
 
Status
Not open for further replies.

Top