When are the c2c 387s expected to be in service?
they will go down well I think given the tables a first for C2C
When are the c2c 387s expected to be in service?
Through trains from the Thames Valley branches were definitely due to cease in May 2017, it was explicitly stated in the GW direct award stakeholder brief.
One puzzling statement is that the stakeholder brief also says that on commencement of Crossrail to Heathrow in May 2018, (i.e. the 4 tph replacing Connect) then the Paddington to Hayes service will cease. But it won't be a Paddington to Hayes service by then, it will be at very least a Paddington to Maidenhead, probably Reading or further. I guess what it might mean is that it will no longer call at most stations between Hayes and Paddington, and will be modified into more of a semi fast service at that time.
Wish GWR would use 365's there's still no home for the ones coming off GTRWhen it is stating the Paddington to Hayes services, surely it is stating about the Heathrow Connect service which is scheduled as Paddington - hayes service even though it goes on to Heathrow.
I cannot find any recent route map update other than http://www.avocetline.org.uk/wp-content/uploads/2015/10/October-2015-GWR-Franchise-Update-MK3.pdf which states the following within it:
By May 2017 we plan to have fully deployed our fleet
of EMUs in the Thames Valley (Class 387 and 365),
albeit branch line electrification will still be in hand
Through trains to London from Thames Valley
branches will cease (Greenford, Henley and Marlow/
Bourne End), and there will be a reduction in
Bedwyn/Kintbury/Hungerford through services
EMUs will replace peak service HSTs on the
Paddington-Oxford route
Changes to Frome-Paddington, Paddington to Bristol
via Newbury and Paddington to Frome services
It does not state that the stopping services from say Reading to London Paddington will cease when Crossrail starts.
The only possible comments that I can see about Thames Valley services is the following:
Through services to and from London will cease, with
connections into/out of fast peak trains between
Maidenhead and Paddington.
May 2018
At this point the Heathrow Connect and additional
Hayes & Harlington services will cease and be
operated by Crossrail. The GWR EMUs will be redployed to add strengthening capacity.
Given the above, there will still be fast services from Reading stopping at say Slough to London Paddington with other stops, it is just that all the GWR trains that stop currently at Maidenhead will change to be Crossrail services as there are 4tph Crossrail services that will start from Maidenhead with 2tph Crossrail services starting from Reading.
Wish GWR would use 365's there's still no home for the ones coming off GTR![]()
When it is stating the Paddington to Hayes services, surely it is stating about the Heathrow Connect service which is scheduled as Paddington - Hayes service even though it goes on to Heathrow.
[....]
May 2018
• At this point the Heathrow Connect AND additional
Hayes & Harlington services will cease and be
operated by Crossrail. The GWR EMUs will be redployed to add strengthening capacity.
That stakeholder brief is now so out of date as to be fairly useless. I will be having words tomorrow with the relevant people as its getting embarrassing.
Give up on this. The reasons for using a unified fleet of 387s are obvious and have been given a number of times before.
I have to agree with you on this as the class 387's can be adapted just like the class 379's to be IPEMU trains with batteries fitted to operate off any electrical power.
You really are obsessed with these IPEMUs aren't you! Any electrostar should be able to be modified for batteries (although every installation will be bespoke). But there is no need for the GW franchise to use IPEMUs beyond their already ordered IEPs and 802s
You really are obsessed with these IPEMUs aren't you!
This is why the Railways should be put back in public ownership then we wouldn't have these problems regarding redundant rolling stock!
This is why the Railways should be put back in public ownership then we wouldn't have these problems regarding redundant rolling stock!
When it is stating the Paddington to Hayes services, surely it is stating about the Heathrow Connect service which is scheduled as Paddington - hayes service even though it goes on to Heathrow.
I cannot find any recent route map update other than http://www.avocetline.org.uk/wp-content/uploads/2015/10/October-2015-GWR-Franchise-Update-MK3.pdf which states the following within it:
By May 2017 we plan to have fully deployed our fleet
of EMUs in the Thames Valley (Class 387 and 365),
albeit branch line electrification will still be in hand
Through trains to London from Thames Valley
branches will cease (Greenford, Henley and Marlow/
Bourne End), and there will be a reduction in
Bedwyn/Kintbury/Hungerford through services
EMUs will replace peak service HSTs on the
Paddington-Oxford route
Changes to Frome-Paddington, Paddington to Bristol
via Newbury and Paddington to Frome services
It does not state that the stopping services from say Reading to London Paddington will cease when Crossrail starts.
The only possible comments that I can see about Thames Valley services is the following:
Through services to and from London will cease, with
connections into/out of fast peak trains between
Maidenhead and Paddington.
May 2018
At this point the Heathrow Connect and additional
Hayes & Harlington services will cease and be
operated by Crossrail. The GWR EMUs will be redployed to add strengthening capacity.
Given the above, there will still be fast services from Reading stopping at say Slough to London Paddington with other stops, it is just that all the GWR trains that stop currently at Maidenhead will change to be Crossrail services as there are 4tph Crossrail services that will start from Maidenhead with 2tph Crossrail services starting from Reading.
Will this affect any services and connections from Marlow to London?
Yes, there will be no direct services from Marlow to London as mentioned in the details that I provided. Theer will also be no direct trains to London from Henley-On-Thames and Greenford from May 2017.
There isn't a direct Marlow to London service now... Marlow customers' 1 change to London in the peaks shifts from being one change at Bourne End to one change at Maidenhead. There is a thread regarding this in infrastructure sub-forum.
Funny enough I was just on that earlier, 1642 PAD-BNE. Then there's a shuttle on the other platform to Marlow.
Thames link are using a triplet of gx units to London Bridge today how confusing
I haven't been in those as yet, I'm guessing they're just like a normal 387 inside?
Southern cannot use the 387s as most of the drivers don't sign them so it's a clever way to increase capacity with the stock available. Remember TL drivers can use the stock to call all stations DOO, Southern/GatEx drivers cannot.
Nothing to do with a shortage of stock. Victoria is blocked so Thameslink is using 2x 12 car 387/2 to run the London Bridge service to help capacity keep up with demand.
This makes Thameslink a mainly 12 car railways with some 8 car workings. Southern cannot use the 387s as most of the drivers don't sign them so it's a clever way to increase capacity with the stock available. Remember TL drivers can use the stock to call all stations DOO, Southern/GatEx drivers cannot.
I was hoping that the 4 GWR class 387's would be doing services to Hayes and Harlington today, but it seems that they have been stored for the day within North Pole depot. Iam presuming that they only operate Monday to Friday on services?
If they are at North Pole Depot, are they visible from the outside?
Yes, there are visible from the GWML line as you pass North Pole depot on a train.
I was hoping that the 4 GWR class 387's would be doing services to Hayes and Harlington today, but it seems that they have been stored for the day within North Pole depot. Iam presuming that they only operate Monday to Friday on services?
Monday to Friday peak only - they're the only Padd - Hayes services anyway so should stick out like a sore thumb.