Yes,
@Peter Sarf already knows that, it's the starting point of his entire line of reasoning, so there's no need to tell him again.
He is specifically theorising about adapting the ETCS software so that it can run on 7-carriage trains. This would bring the benefit of simplifying lengthening/shortening trains; ending maintenance for the 'legacy' software; allowing 7-carriage trains to use the tunnel; while keeping service to short Paddington High Level platforms.
That could either be:
- a simple task of trimming some lines of code that expect the extra carriages, or
- a complex task involving a full rebuild of the 9-carriage ETCS software.
Nobody here knows which is true, so your claim about what is or isn't "far move cost effective" lacks credibility.