• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 321 to Scotland?

Status
Not open for further replies.

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,630
Location
Hampshire
There is a press briefing on the ScotRail forum / website at the moment which contains the following for the ScotRail franchise.

- HSTs will indeed receive power doors
- 158 fleet will be refurbished
- 156 fleet refreshed and continue to be used on Stranraer and Carlisle/Dumfries services
- the 7 321s heading to Scotland at the end of next year will be used on Glasgow suburban services
- Hourly high speed service between Inverness and Perth (and on to either Glasgow or Edinburgh) by 2019

So they will be changed to work in Glasgow as 4 Car EMUs, Possibly modified to 320 standard.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,873
Location
UK
It'll have to be LM, and mainly from WM services eg:all 350s removed and maybe 323s on the abbey line.
I mean cant do anything that'll negitively affect the south east.

I thought the Abbey Line was actually operated by Northern, as it seems to be the one line where it's okay to run ageing rolling stock down here!
 

Pugwash

Member
Joined
17 Nov 2011
Messages
336
On the "where will they come from?"

AGA have 94, with as far as I know no slack in the fleet. Reducing the length of trains on the Great Eastern would be unacceptable. They don't have any new stock being introduced on those services any time soon.

Great Northern have 13. In a few years time they'll be replaced by 700s and 377s. But not in the time frame proposed.

Northern have 3, so we can discount those.

LM have 7, as discussed.

On similar units, there's 6 317/7 sitting around in storage- though for any long term use elsewhere they'd really need completely stripped out and refitted.

If anything AGA could do with more of them to create make all 12 car trains in the peak, some of the services are 8 carriage, demand on this line is only going one way and that is up.

AGA also need some slack to allow for refurbishment of the current fleet. Sending these 321's to Scotland seems short sighted.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,873
Location
UK
What about the services run by 321s on the 'mainline' on a morning and evening and during the day on Tring services?

Do those trains still have route planners from the early 2000s in them? The 321 on the Abbey line does seem to be a rather special case.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
321s are modern compared to the Northern DMUs, or even compared to what stock LM use on Bedford to Bletchley.

I'm not sure he was being entirely serious... even ignoring the Chiltern bubble car services and Island line, the South has the oldest units, with 313s operating on the inner great northern and on the south coast (older than Mersey Rail's 507/508 fleet), 455s at Southern and SWT and 317s at Great Northern and AGA all being as old or older than Class 150 and Class 142.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
I'm not sure he was being entirely serious... even ignoring the Chiltern bubble car services and Island line, the South has the oldest units, with 313s operating on the inner great northern and on the south coast (older than Mersey Rail's 507/508 fleet), 455s at Southern and SWT and 317s at Great Northern and AGA all being as old or older than Class 150 and Class 142.

If you count Island Line as a subsidiary of SWT then Merseyrail have the oldest fleet, with London Overground having the youngest fleet. I wonder what difference it would make if Isle of Man railways were counted as North West railways opposed to non-British.

Given Merseyrail are expected to get new trains in the new few years, while SWT, Govia Thameslink, East Coast and First Great Western will all get brand new trains it looks like as things stand at the end of CP5 Northern and ATW will be vying for the title of oldest fleet.
 
Last edited by a moderator:

Tibbs

Member
Joined
22 Aug 2012
Messages
894
Location
London
What about the services run by 321s on the 'mainline' on a morning and evening and during the day on Tring services?

Ugh, what awful train seats! They're wierdly canted back with a base so low it puts even my knees up near my ears and I have really stumpy legs.

Not to mention the knee knocking 3x3 seating and ridiculous 'table'.

I do feel sorry for the commuters for whom 321s represent the 'good train'. I always chose to wait for the next service out of Euston than get on one.

Please, send them away from us! :)
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
If you count Island Line as a subsidiary of SWT then Merseyrail have the oldest fleet, with London Overground having the youngest fleet. I wonder what difference it would make if Isle of Man railways were counted as North West railways opposed to non-British.

Given Merseyrail are expected to get new trains in the new few years, while SWT, Govia Thameslink, East Coast and First Great Western will all get brand new trains it looks like as things stand at the end of CP5 Northern and ATW will be vying for the title of oldest fleet.

But these things are cyclical. In the late 80s/early 90s Regional Railways had an (on average) much newer fleet than NSE thanks to the huge numbers of Sprinters, Super Sprinters and Pacers!
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
But these things are cyclical. In the late 80s/early 90s Regional Railways had an (on average) much newer fleet than NSE thanks to the huge numbers of Sprinters, Super Sprinters and Pacers!

I'm not really sure why you made a 'the South has the oldest units' claim. jonmorris0844 made a valid point - LM run a fleet of mainly modern trains but it sounded like he forgot about the older 150s running between Bedford and Bletchley.

According to Network Rail the shelf life of an EMU is 35-40 years, while for a DMU it is 25-30 years so 313s built in 1976 aren't necessarily in need of replacement any more than the 142s or 150s. I think the majority of slam door EMUs got withdrawn before they were 40 years old, with the 421s being an exception. However, 421s on the Lymmington branch in 2010 was nothing compared to 47 year old 101s on Manchester-Marple in 2003, before they got replaced by 19 year old Pacers.

Anyway back to Scotland getting 321s.
 
Last edited by a moderator:

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,360
Location
Hertfordshire / Teesdale
I'm not really sure why you made a 'the South has the oldest units' claim. jonmorris0844 made a valid point - LM run a fleet of mainly modern trains but it sounded like he forgot about the older 150s running between Bedford and Bletchley.

According to Network Rail the shelf life of an EMU is 35-40 years, while for a DMU it is 25-30 years so 313s built in 1976 aren't necessarily in need of replacement any more than the 142s or 150s. I think the majority of slam door EMUs got withdrawn before they were 40 years old, with the 421s being an exception. However, 421s on the Lymmington branch in 2010 was nothing compared to 47 year old 101s on Manchester-Marple in 2003, before they got replaced by 19 year old Pacers.

Anyway back to Scotland getting 321s.

I would imagine it has to be some of the Great Northern 321s. Looking ahead, as things stand they would probably be the first to be displaced. Currently there are 3 AM peak services booked to be formed of 2x317 which require selective door opening. I can't see this being fitted to the 365s or 321s, unless Meldreth, Shepreth and Foxton platforms get lengthened in that time.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Is it selective door opening for Foxton, Shepreth and Meldreth?

I thought the units were just locked out of Use starting from Cambridge and only came into service by being unlocked at Royston.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
That's what I thought as well, don't think the 317s have any form of SDO.
 

Kristofferson

Member
Joined
23 Nov 2012
Messages
1,132
I do feel sorry for the commuters for whom 321s represent the 'good train'. I always chose to wait for the next service out of Euston than get on one.
I'm the opposite - I wait for the 321 in the morning, instead of cramming onto the "sealed sardine can" Desiro that turns up before. The fresh air is much better than the ineffective aircon. Also, I prefer the 321 sound... :D
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,360
Location
Hertfordshire / Teesdale
Is it selective door opening for Foxton, Shepreth and Meldreth?

I thought the units were just locked out of Use starting from Cambridge and only came into service by being unlocked at Royston.

My understanding is they have a very basic form of SDO that allows the rear unit to be effectively locked out of use by operation of some kind of switch in one of the cabs, without having to walk through the train and 'lock' each set of doors individually. Certainly if any other type of train operates these three services, (e.g. 2x365) the train will non-stop the three stations in question.

I presume this 'mod' was introduced as these morning services used to be booked to join at Royston, which used to cause chronic unreliability right in the middle of the am peak.
 

Silverlinky

Member
Joined
3 Feb 2012
Messages
876
So how do you know that it's going to be Directly Operated when no-one at my place seems to know that for sure??


Finally found it on the go-ahead website as part of their interim management statement.....

"The franchise will continue on its original contract terms for the remainder of the year, and will begin a seven-month extension on the same terms in September 2015. We look forward to working with the DfT regarding a potential direct award contract from March 2016 to June 2017"
 

3141

Established Member
Joined
1 Apr 2012
Messages
2,114
Location
Whitchurch, Hampshire
Finally found it on the go-ahead website as part of their interim management statement.....

"The franchise will continue on its original contract terms for the remainder of the year, and will begin a seven-month extension on the same terms in September 2015. We look forward to working with the DfT regarding a potential direct award contract from March 2016 to June 2017"

Directly operated - a company is run by Directly Operated Railways, a DfT company set up to run things when a franchisee withdraws or gets terminated.

Direct Award - a franchise is extended beyond its last scheduled date by means of a contract awarded directly by the DfT to the franchisee, and not put out to tender.
 

Tibbs

Member
Joined
22 Aug 2012
Messages
894
Location
London
I'm the opposite - I wait for the 321 in the morning, instead of cramming onto the "sealed sardine can" Desiro that turns up before. The fresh air is much better than the ineffective aircon. Also, I prefer the 321 sound... :D

You must have a great chiropractor to be able to sit in those seats every day! :lol:
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,856
Location
Beeston (Notts)
UPDATE: Captain Deltic's Rolling Stock roundup in this month's Modern Railways shows the 7 LM 321s WILL be moving to Scotland, for services around Glasgow.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,185
Location
"Marston Vale mafia"
UPDATE: Captain Deltic's Rolling Stock roundup in this month's Modern Railways shows the 7 LM 321s WILL be moving to Scotland, for services around Glasgow.

What does LM get in exchange? Or does that mean no additional stock, which would mean adding the extra peak train per hour (fast LBZ-Bletchley-MKC-Northampton at xx49 I believe) becomes infeasible?

Neil
 

158722

Member
Joined
8 Nov 2009
Messages
831
What does LM get in exchange? Or does that mean no additional stock, which would mean adding the extra peak train per hour (fast LBZ-Bletchley-MKC-Northampton at xx49 I believe) becomes infeasible?

Neil

At a guess, Northern get a few extra 319s to replace a similar number of 323s, which in turn go to LM to replace the soon to be 5 class 350 diagrams on Wolves-Walsall diagrams.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,399
UPDATE: Captain Deltic's Rolling Stock roundup in this month's Modern Railways shows the 7 LM 321s WILL be moving to Scotland, for services around Glasgow.

Hey, perhaps they can be used to release the Scotrail 314s which being three car trains are ideal for Northern in the North West according to some on here!

Northern like old trains....;)
 
Last edited:

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
At a guess, Northern get a few extra 319s to replace a similar number of 323s, which in turn go to LM to replace the soon to be 5 class 350 diagrams on Wolves-Walsall diagrams.

DfT would have to fund crew training of Piccadilly crews on 319s it there's any chance of Northern releasing 323s. Northern's Direct Award only budgeted for some Victoria and Lime Street crews to be trained on 319s and they don't sign the electrified routes out of Piccadilly.
 

158722

Member
Joined
8 Nov 2009
Messages
831
Add into the equation the EMU requirement when Chase Line gets wired.

I've made the comment several times that its seems logical that all of Northern's 323s could be transferred to LM - to displace the 321s, to cover extra turns required to cover extensions of the wires to Bromsgrove, Chase line and eventually (Leamington?)-Coventry-Nuneaton and provide a little extra capacity. Northern's fleet are just about the right number to cover all these options.

The usual reply to this has been about the ability of the 319s to keep to 323 timings, especially to Hadfield and on the Stoke run, but hey, lets see...
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,185
Location
"Marston Vale mafia"
At a guess, Northern get a few extra 319s to replace a similar number of 323s, which in turn go to LM to replace the soon to be 5 class 350 diagrams on Wolves-Walsall diagrams.

That'd work, and would mean the whole LM south WCML service would use coupling compatible units, which I imagine would make diagramming much easier.

Neil
--- old post above --- --- new post below ---
The usual reply to this has been about the ability of the 319s to keep to 323 timings, especially to Hadfield and on the Stoke run, but hey, lets see...

How tight are the Hadfield turnarounds? Could they just slacken the timetable?

Neil
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
How tight are the Hadfield turnarounds? Could they just slacken the timetable?

No turnaround at Glossop as they do a Manchester-Glossop-Hadfield-Glossop-Manchester circular route, similar to the Merseyrail Wirral line services.

Around 5 minutes turnaround at Piccadilly.

Slackening the timetable would need an additional unit, which would increase leasing costs and consequently increase the subsidy.
 

158722

Member
Joined
8 Nov 2009
Messages
831
How tight are the Hadfield turnarounds? Could they just slacken the timetable?

Neil

Very tight 4-5 mins at Piccadilly and 3mins (generally) at both Hadfield and Glossop, to maintain what looks to be 3 diagrams to cover the 30min frequency off-peak turns during most of the day, with a 4th unit out in both peaks where frequency is more or less 20mins.

Even if the 319s were allowed an extra 2mins in each direction, this would make the current diagrams unworkable, hence an extra unit would be required. So, yes, it could be done with 319s, but would require an extra unit.

EDIT: That said, I see services are booked 31 mins from Piccadilly to Glossop or Hadfield, but either 36/37 mins on the return back into PIccadilly. A couple of 'charter' minutes could be removed perhaps to compensate for the slower 319s? Anyone care to comment on how much more time a 319 would require compared with a 323?
 
Last edited:

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
3mins (generally) at both Hadfield and Glossop

Don't forget there's the train has to reverse at both Glossop and Hadfield. 3 minutes dwell time is usually what Northern provide on any route if a reversal is required. For example, Wakefield Westgate to Huddersfield services are stopped for 3 minutes at Wakefield Kirkgate.
 
Status
Not open for further replies.

Top