Philip
On Moderation
What do people think the allocations will be for the 55 x class 195 trains supposedly set to work the diesel Northern Connect services? Been thinking about it myself and come up with this:
Blackpool to York: 7 x 195 diagrams
Man Airport to Barrow: 5 x 195/0 or 195/1
Man Airport to Bradford: 4 x 195/0 or 195/1
Man Airport to Liverpool via Warrington: 3 x 195/0 or 195/1
Liverpool to Bradford: 4 x 195/0 or 195/1
Chester to Leeds: 5 x 195/0 or 195/1
Nottingham to Bradford: 6 x 195/0 or 195/1
Sheffield to Lincoln: 4 x 195/0 or 195/1
So that's 38 diagrams so far..do any of them look a bit stretched and have I missed any routes off? Assuming 6 or 7 units will be kept aside for maintenance, this will still leave around 10 units spare. Can we expect the doubling up of a few services or could some non-Connect services have 195s working them?
Also, which routes are more likely to get 3-car units, or doubled up units?
Blackpool to York: 7 x 195 diagrams
Man Airport to Barrow: 5 x 195/0 or 195/1
Man Airport to Bradford: 4 x 195/0 or 195/1
Man Airport to Liverpool via Warrington: 3 x 195/0 or 195/1
Liverpool to Bradford: 4 x 195/0 or 195/1
Chester to Leeds: 5 x 195/0 or 195/1
Nottingham to Bradford: 6 x 195/0 or 195/1
Sheffield to Lincoln: 4 x 195/0 or 195/1
So that's 38 diagrams so far..do any of them look a bit stretched and have I missed any routes off? Assuming 6 or 7 units will be kept aside for maintenance, this will still leave around 10 units spare. Can we expect the doubling up of a few services or could some non-Connect services have 195s working them?
Also, which routes are more likely to get 3-car units, or doubled up units?