Class 175s to GWR

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,583
Location
Llanharan
Looks like today's run went the smoothest so far, almost no delay at all to and from. Hopefully we'll get that 2nd unit running sooner or later!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

XFeed

Member
Joined
25 Nov 2025
Messages
277
Location
Chester
The only reason it was changed back to 175001 this afternoon, was due to having a few faults that needed to be seen to. Also 175001 was playing up this morning so was sent back to Laira to be rectified, which is just as well it was as 003 needed sorting.
So today no more Guards fully signed off due to 2 Car formation on the training run.
With the niggling in service faults 001 and 003 appeared to have suffered recently, which seem reasonably minor as the units are available again for service pretty quickly albeit requiring depot attention, I wonder why GWR are not utilising experienced 175 Tech riders to travel with the units to annalise and rectify any minor issues that the units develop or train crew 175 unfamiliarity brings which would then keep them in service ?

With a Technician on board assisting the train crew, giving them confidence, with any issues that they are experiencing or answering any questions that they may have when they experience problems or just not sure of a particular procedure on the unit as at the end of the day 175s are a new fleet to all GWR staff.

Over the years I have found train crew very appreciative of any technical support on board as at the end of the day they are striving to provide the best service possible.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,749
With the niggling in service faults 001 and 003 appeared to have suffered recently, which seem reasonably minor as the units are available again for service pretty quickly albeit requiring depot attention, I wonder why GWR are not utilising experienced 175 Tech riders to travel with the units to annalise and rectify any minor issues that the units develop or train crew 175 unfamiliarity brings which would then keep them in service ?

With a Technician on board assisting the train crew, giving them confidence, with any issues that they are experiencing or answering any questions that they may have when they experience problems or just not sure of a particular procedure on the unit as at the end of the day 175s are a new fleet to all GWR staff.

Over the years I have found train crew very appreciative of any technical support on board as at the end of the day they are striving to provide the best service possible.
Where are GWR going to get experienced 175 tech riders from? They are new to all GWR staff and those experienced 175 tech riders aren’t exactly local to Plymouth!
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,243
Location
Paignton
Looks like today's run went the smoothest so far, almost no delay at all to and from. Hopefully we'll get that 2nd unit running sooner or later!
and the third and fourth refurbished units. Maybe the four unrefurbished units will go to Long Rock if they do a good job on 175010.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,058
Location
West Wiltshire
Where are GWR going to get experienced 175 tech riders from? They are new to all GWR staff and those experienced 175 tech riders aren’t exactly local to Plymouth!
Is it GWRs responsibility to employ them. They signed a £ multi million contract for tech support with Alstom. So surely Alstom should have either trained up some locals, or relocated some staff short term.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,749
Is it GWRs responsibility to employ them. They signed a £ multi million contract for tech support with Alstom. So surely Alstom should have either trained up some locals, or relocated some staff short term.
There is a big difference between training and experience.
 

ThatBloke

On Moderation
Joined
29 Nov 2025
Messages
73
Location
SNE
Is it GWRs responsibility to employ them. They signed a £ multi million contract for tech support with Alstom. So surely Alstom should have either trained up some locals, or relocated some staff short term.
My understanding of the support that GWR have procured from Alstom is that it is very limited in its scope.
A full technical support package was offered initially and declined by GWR.
 

XFeed

Member
Joined
25 Nov 2025
Messages
277
Location
Chester
Where are GWR going to get experienced 175 tech riders from? They are new to all GWR staff and those experienced 175 tech riders aren’t exactly local to Plymouth!

My comment about "experienced" 175 Tech riders was probably not the best way to explain the point I was trying to make, this being having a local GWR maintenance technician on board units during the initial role out of the fleet, those that have now gained some experience and gaining more and more as the weeks go by with 175s during the short period of time that they have been at GWR and can rectify minor faults in service to prevent a unit having to be returned to the depot for attention.

== Doublepost prevention - post automatically merged: ==

There is a big difference between training and experience.

I totally agree.
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,583
Location
Llanharan
Not looking to be a great day today, 2C26's diagram is allocated to a 150 as of right now with 175001 and 009 returning to Plymouth early on it's training run earlier. 5V84 to Laira doesn't seem to be running either!
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,058
Location
West Wiltshire

5V84 Wolverton - Laira attempt 2 this Friday, 3 car unit(s?) on the way, hopefully.
Not looking good,
auto activated exactly one hour before departure,
but no actual times, and should have set off nearly hour ago
 
Joined
4 Sep 2016
Messages
11
Location
London
Not looking to be a great day today, 2C26's diagram is allocated to a 150 as of right now with 175001 and 009 returning to Plymouth early on it's training run earlier. 5V84 to Laira doesn't seem to be running either!
Indeed, 175001’s windscreen cracked on departure from St. Germans whilst working 5Z13.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,418
Location
Taunton or Kent

Jacob Porrett

Established Member
Joined
28 Jan 2022
Messages
1,933
Location
Telford
These 175s seen like more problems than they are actually worth using/running for.

Probably cheaper to make something new at this rate rather then trying to fix the 175s.
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,583
Location
Llanharan
These 175s seen like more problems than they are actually worth using/running for.

Probably cheaper to make something new at this rate rather then trying to fix the 175s.
Considering the units have been in storage for around 2 years they're bound to be a bit funny when suddenly being utilised again. 001 only started really being used about two months ago when it first moved under its own power from Wolverton to Laira. I'd give it time to see if it's really being more of a hassle to GWR. They weren't this bad with TfW, if I remember correctly anyway.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,422
Location
Lichfield
Considering the units have been in storage for around 2 years they're bound to be a bit funny when suddenly being utilised again. 001 only started really being used about two months ago when it first moved under its own power from Wolverton to Laira. I'd give it time to see if it's really being more of a hassle to GWR. They weren't this bad with TfW, if I remember correctly anyway.

Did the owning group start them up and keep them regularly maintained while in storage for 2 years?
 

ThatBloke

On Moderation
Joined
29 Nov 2025
Messages
73
Location
SNE
......They weren't this bad with TfW, if I remember correctly anyway.
Happy to be corrected.....
But I don't recall the 175s under TfW's stewardship, when supported by Alstom or latterly by CAF, doing anything notable at the annual Golden Spanner awards for fleet reliability.
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,583
Location
Llanharan
Happy to be corrected.....
But I don't recall the 175s under TfW's stewardship, when supported by Alstom or latterly by CAF, doing anything notable at the annual Golden Spanner awards for fleet reliability.
I'm also happy to be corrected, I can't remember if all too well myself! You might as well be right.
 

ThatBloke

On Moderation
Joined
29 Nov 2025
Messages
73
Location
SNE
I'm also happy to be corrected, I can't remember if all too well myself! You might as well be right.
As the 175 fleet is recommissioned. My hope is that GWR do take on the learning from the issues in early 2023 with the three fires and execute the maintenance requirements fully and correctly.
The 175s have the potential to be ideally suited to service in the South West.
Whilst there are certainly flaws in their design, the knowledge from their prior operation and that from its sister fleet, the 180s, needs to be consolidated and built on by all the stakeholders.
 

FrodshamJnct

Established Member
Joined
14 Apr 2019
Messages
4,422
Location
Cheshire
Happy to be corrected.....
But I don't recall the 175s under TfW's stewardship, when supported by Alstom or latterly by CAF, doing anything notable at the annual Golden Spanner awards for fleet reliability.

Significant difference when CAF took Chester depot…
 

XFeed

Member
Joined
25 Nov 2025
Messages
277
Location
Chester
Indeed, 175001’s windscreen cracked on departure from St. Germans whilst working 5Z13.

With 001`s windscreen cracking during which I assume were training runs while attached to 009 I wonder why the decision wasn`t made to then "bury" 001`s affected cab within the pair and then being able to continue with its training schedule ? Unless it was not practical to do so at any point.

This would then give the depot time to call out PSV glass or whoever replaces their windscreens then to be present when the unit returns after training and thus giving the windscreen the required time to cure and ready for the following days service.

== Doublepost prevention - post automatically merged: ==

Happy to be corrected.....
But I don't recall the 175s under TfW's stewardship, when supported by Alstom or latterly by CAF, doing anything notable at the annual Golden Spanner awards for fleet reliability.

Unsure if any Golden Spanner awards were gained but I do recall for the majority of service days 24/27 units were available for service barring last minute failures prior to service, this figure also included "allowables" which could include tree/animal/debris strikes repairs or fatality testing and repairs.
Fleet reliability did suffer once Alstom lost control.
 
Last edited:

The exile

Established Member
Joined
31 Mar 2010
Messages
9,335
Location
Somerset
These 175s seen like more problems than they are actually worth using/running for.

Probably cheaper to make something new at this rate rather then trying to fix the 175s.
I'm sure if GWR could have popped down to Trains R Us and bought twenty-five brand new units "off the shelf" they would have been delighted to do so. Today's problem - a cracked windscreen - is not really in the "these units are unreliable" category. Although this is speculation, I would imagine that quite a lot of the more minor issues are down to relative unfamiliarity with the units - whether that's inadvertently causing a problem or erring on the side of excessive caution when something goes slightly awry (obviously less likely in these hi-tech days - but the equivalent of the trainer or the manual saying, " if this warning buzzer sounds, it needs fitters' attention" because that's what the manufacturer says; whereas an experienced person in the field might know that a gentle tap in exactly the right place with your lunch box will fix the problem enough to see out the day 90% of the time - it only needs the fitters the other 10% of the time.
 

XFeed

Member
Joined
25 Nov 2025
Messages
277
Location
Chester
I'm sure if GWR could have popped down to Trains R Us and bought twenty-five brand new units "off the shelf" they would have been delighted to do so. Today's problem - a cracked windscreen - is not really in the "these units are unreliable" category. Although this is speculation, I would imagine that quite a lot of the more minor issues are down to relative unfamiliarity with the units - whether that's inadvertently causing a problem or erring on the side of excessive caution when something goes slightly awry (obviously less likely in these hi-tech days - but the equivalent of the trainer or the manual saying, " if this warning buzzer sounds, it needs fitters' attention" because that's what the manufacturer says; whereas an experienced person in the field might know that a gentle tap in exactly the right place with your lunch box will fix the problem enough to see out the day 90% of the time - it only needs the fitters the other 10% of the time.

Well made points

== Doublepost prevention - post automatically merged: ==

Did the owning group start them up and keep them regularly maintained while in storage for 2 years?

Prior to the units being withdrawn from service and in readiness for storage Alstom produced a pretty comprehensive VMI document "Cold Storage" detailing all checks and procedures required on a pre determined basis while in storage.

Whether this was carried out to the letter on the units I don`t know or who would have been responsible for the procedures while stored ?
 
Last edited:

3RDGEN

Member
Joined
6 Mar 2023
Messages
590
Location
Hull
Happy to be corrected.....
But I don't recall the 175s under TfW's stewardship, when supported by Alstom or latterly by CAF, doing anything notable at the annual Golden Spanner awards for fleet reliability.
There was a contractual reliability figure with ATW/Angel & TfW which in general Alstom met, if your contracted to deliver X thousand miles per failure your project manager doesn't waste the companies money chasing Golden Spanners. The units have designed in/legacy issues which would require significant money to rectify so they will never deliver 185 levels of reliability but once GWR get more experience on them they should match or better the 158's which will be adequate as a stop gap fleet.
 