172102 Was out on Friday of last week, 8/4/11 it worked 5Z72 0840 Derby to Marylebone and return 5Z74 1403 Marylebone to Derby. Here are photos of the unit at Small Heath Up goods loop and in platform 1 at Marylebone.
165034 needs a wash!
172102 Was out on Friday of last week, 8/4/11 it worked 5Z72 0840 Derby to Marylebone and return 5Z74 1403 Marylebone to Derby. Here are photos of the unit at Small Heath Up goods loop and in platform 1 at Marylebone.
172102 Was out on Friday of last week, 8/4/11 it worked 5Z72 0840 Derby to Marylebone and return 5Z74 1403 Marylebone to Derby. Here are photos of the unit at Small Heath Up goods loop and in platform 1 at Marylebone.
View attachment 4990
View attachment 4991
In terms of fareness, if another say, 20 172s are to be built then the first prioritty should be Northern?
In terms of fareness, if another say, 20 172s are to be built then the first prioritty should be Northern?
Also throw into the mix that Southern are supposedly getting some more turbostars in the not hugely distant future...
I know people in the Northern area complain about getting cascades, but being level headed, it would be better to send them to LM- freeing LM's 150/153 fleet to Northern, to reinforce services already run with 150/153/155/156 and/or reduce the number of Pacers in service- and then have a serious look at a new, franchise-wide, DMU fleet for Northern.
Was there much moaning from the south back in the eighties when "the north" got a massive shiny fleet of Sprinters and pacers whilst the NSE continued with mainly slammers?
Replacement of the Pacer and Sprinter fleets can only be done one step at a time due to the vast total number of trains, but it would help if all those steps in the process of fleet replacement were strategically linked into each other to avoid, as you rightly point out, micro fleets. Electrify the Cardiff Valleys (with either displaced 315s or new 378 type three car units), and move Networker Turbos onto the Cardiff to Pompey runs by displacing them through the GWML Oxford electrification (freeing up 150s to take over Pacer duties), and the Pacer replacement issue quickly becomes largely confined to Northern. Its going to be a slow, laborious process, but it can be done.(* - also affects FGW and ATW, of course, with their Sprinters/ Pacers - I appreciate we aren't the only ones in this position)
Given the problems at Neville Hill with the tiny fleet of 321s
For what? Increased frequency on existing lines? (Oxted/ Marshlink)
It’s good to know that new, perfectly servicable diesel trains are being put to such good use by our friends in the South, when in the likes of Manchester, Liverpool and Leeds Northern are sweating their assets off attempting to get as much use as possible out of two carriage Pacers and Sprinters that are woefully inadequate to meet demand.the stock just sits around most of the day.
Why? what's the point, can't they just electrify the lineAlso throw into the mix that Southern are supposedly getting some more turbostars in the not hugely distant future...
Im commenting in both this thread and that one at the moment! With the delivery of the 172s so closely tied to the cascade of the 150s, they seem to have both rolled into the same thing.This thread might be a bit more relavent: http://www.railforums.co.uk/showthread.php?t=39510&page=2
I know full well that electrification is an expensive process to go about, but a brand new Turbostar isnt cheap either: How much more would it cost to electrify the Oxted lines and use the existing 377 fleet more intensively to provide the service (A few more 377s would probably be required, but not as many as there are 171s) than to build more 171s for the route?
--- old post above --- --- new post below ---
Its good to know that new, perfectly servicable diesel trains are being put to such good use by our friends in the South, when in the likes of Manchester, Liverpool and Leeds Northern are sweating their assets off attempting to get as much use as possible out of two carriage Pacers and Sprinters that are woefully inadequate to meet demand.Ah well, the difficult mistress that is peak demand cannot be overlooked, and the extra capacity is needed at the busiest times.
Which is why I included the final sentence to the effect that catering for peak demand is a necessary evil but unfortunately can leave trains sitting idle for a period of the day. Its just that seeing most of the stock just sits around all day in writing seems so stark! It was meant slightly tongue in cheek; Additionally I dont know what the situation is at Newton Heath, but there never seem to be that many spare units sitting around at Neville Hill during the middle of the day as a proportion of the entire fleet allocation.Plenty of DMUs sit on Newton Heath and Neville Hill between the peaks, whats the difference to Selhurst??
Plenty of DMUs sit on Newton Heath and Neville Hill between the peaks, whats the difference to Selhurst??
do someone know about the date for the 172 to come into Service becuse i do not know
Youre not making much sense. London Midland currently have 172331 and 172332 at Tyseley, both of which are, AFAIK, seatless.yes lm ones they have buy 3 172's from london overground 1 of the 172 has got no seats in but one has no seats in it