Class 172 Production Progress

Status
Not open for further replies.

Captain Chaos

Member
Joined
31 Jan 2011
Messages
840
Hi,

Just by chance I saw a Chiltern Rail 172 speed past my office window on Friday afternoon - not the kind of thing I'd have expected since it's just to the west of Maidenhead on the main lines out of Paddington !

So putting 2 and 2 together this would have been 172101 heading west through Maidenhead shortly after 15:15. Seemed to be going fairly fast compared to the normal 165/166 units.

Ah, I must have just missed it passing through Reading then. Didn't get there till 15:45 and jumped on the 15:48 to Newbury. So it must have just gone into the depot as I went past it.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

RPM

Established Member
Joined
24 Sep 2009
Messages
1,531
Location
Buckinghamshire
But they will work together with Chiltern's 165s, which are the same as 166s. It may be that Chiltern couldn't find the space and / or a spare 166 to do the tests, whereas FGW at Reading might have been able to accommodate this.

Could this be a rare example of very welcome cooperation between TOCs??

It has already done compatibilty tests with Chilten 165s. The 166 test was obviously an additional test required by the manufacturer.
--- old post above --- --- new post below ---
172102 is due to arrive in a week or two for milage accumulation tests. Apparently it will be fully fitted with seats unlike 172101.
 

DVT82305

Member
Joined
3 Dec 2009
Messages
60
Does anyone know how long it will stay at Reading for because I will be going though there on the 16th of this mouth?
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Does anyone know when the first of the 150s will leave London Midland? I've heard EMT have based their May 2011 timetables on receiving the 4x156s from Northern but Northern are themselves having to sublease 2 units at present to provide the usual timetabled service.

Of course FGW could return the 142s that they would have had to return when they got the LO 150s had East Coast not halted plans for the EC 180 services.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,615
Location
Hampshire
All the Chiltern and LM 172's are to delivered by "June" so says Rail!!!!!

:lol:

Now Bombardier, Which june would that be?

June 2009?

June 2010?

June 2011?

June 2012?

June 2013?

June +++++++?

:lol:

I Think Either Rail have gaigned some rather duff info there, or someone in Bombardiers just said June again...

Theres an episode of Futurama - which rather sums up Bombardier in one prase...

Time Keeps On Slippin' Where ironicly, time does keep on slipping! Perhaps Bombardier seems to be watching that episode abit too much...!
 
Last edited:

387star

On Moderation
Joined
16 Nov 2009
Messages
6,665
Seems everyone is banging on about the May timetable change expecting all these rolling stock cascades to be neatly in place by then
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
The 172s work, it's the LM crews which don't so not sure how that's the fault of Bombardier??

They've been out on mileage accumulation with FOC drivers.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
The 172s work, it's the LM crews which don't so not sure how that's the fault of Bombardier??

They've been out on mileage accumulation with FOC drivers.

The fact that they are late is the fault of bombardier ;)
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,615
Location
Hampshire
I neither said which June or allocated blame, just posted in disbelief hence the !!!!!! at the end.

Sorry Northern and FGW folks, heven knows when you will get your cascades.:cry:

No problems, i wasn’t aiming any of it at you - just the usual comment for the ever slipping, ever delirium Bombardier...who, for a train ordered back in summer 2007...Yes, Summer 2007! still haven't finished testing, and still hasn't finished constructing the fleet is pretty dam poor!

As for the the cascades start, and we & northern finally receive our 150s, well, let's just say - First Great Western better start looking for new units, because by the time we & northern will receive any ex LM 150s...they’d be needing replacement at this rate! :roll: :lol:
 

DjU

Member
Joined
12 Jul 2009
Messages
254
Location
Essex
No problems, i wasn’t aiming any of it at you - just the usual comment for the ever slipping, ever delirium Bombardier...who, for a train ordered back in summer 2007...Yes, Summer 2007! still haven't finished testing, and still hasn't finished constructing the fleet is pretty dam poor!

Wasn't aware December was in the Summer
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,240
If Rail had simply put 2012 after June, the article would be quite believable.

It is very likely that Chiltern's four units will be ready by May 2011, and then they'll have a year to finish LM's deliveries.

It's a shame Chiltern don't actually need them until September, as their new timetable is delayed. Suppose it might allow them to speed up the GSM(R) fitting programme for their existing units though...
 

hick

Member
Joined
10 Aug 2009
Messages
97
They are needed in May for capacity reasons and will be doing a peak run as a 6 car. Even the September TT (as of last draft) has no 172 timings in it.
 

Old Hill Bank

Member
Joined
6 Mar 2010
Messages
971
Location
Kidderminster
The 172s work, it's the LM crews which don't so not sure how that's the fault of Bombardier??

They've been out on mileage accumulation with FOC drivers.

It seems several are built but planned driver training is not good enough because they have better brakes than the 150's, what next boys and girls!!!!!:roll:
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
chiltern railways class 172102 has been out on test today on the chiltern mainline i have been told.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,799
Location
Epsom
I did see a Chiltern 172 at tamworth this morning; I was on the 08.40 Euston - Manchester via crewe and just as we went through Tamworth a white and blue 172 was heading south on the high level line.

Presumably that was 172 102, then?
 

Simon Poole

Member
Joined
21 Apr 2010
Messages
549
Location
Brereton, Rugeley, Staffordshire
I did see a Chiltern 172 at tamworth this morning; I was on the 08.40 Euston - Manchester via crewe and just as we went through Tamworth a white and blue 172 was heading south on the high level line.

Presumably that was 172 102, then?

I was on the 0907 (Tamworth Departure) XC service to Nottingham when i saw an Chiltern Class 172 pass while on my way to Duffield!
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,594
Location
Croydon
Had a ride on a 172/0 Gospel Oak to Blackhorse Road. They seem quieter than older DMUs hopefully that is not because they are still new. In the cab it says max speed 100mph btw. But I was struck with how slow the route is. Its like one long TSR !. Perhaps only 15mph !. As the train was full to standing and so slow I wonder why pairs of pacers would not be a better use of resources even though I do hate them.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,664
Had a ride on a 172/0 Gospel Oak to Blackhorse Road. They seem quieter than older DMUs hopefully that is not because they are still new. In the cab it says max speed 100mph btw. But I was struck with how slow the route is. Its like one long TSR !. Perhaps only 15mph !. As the train was full to standing and so slow I wonder why pairs of pacers would not be a better use of resources even though I do hate them.

I think boris has mentioned platform extension and 3 car 172's ie a new centre car
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,594
Location
Croydon
I think boris has mentioned platform extension and 3 car 172's ie a new centre car

Gospel Oak is long enough for 4-5 coaches. Blackhorse Road is longer than 3 coaches but maybe not enough for 4 coaches - long enough for 2 pacers though !. No idea about other stations but I seem to recall Upper Holloway is pretty long. Lets hope for Centre cars.
 

saltley 1394

Member
Joined
26 Feb 2008
Messages
43
Location
Birmingham
chiltern railways class 172102 has been out on test today on the chiltern mainline i have been told.

172102 Was out on Friday of last week, 8/4/11 it worked 5Z72 0840 Derby to Marylebone and return 5Z74 1403 Marylebone to Derby. Here are photos of the unit at Small Heath Up goods loop and in platform 1 at Marylebone.