trains2064
Member
- Joined
- 23 Jul 2010
- Messages
- 188
Have just seen 172 332 come through my local station today around 4 ish. I have to say they look and sound the part. I know some say they are noisy but I don't think so.
IIRC it's a 20min job to connect the units
This is how it should be done
[youtube]ESbdlRiSaC8[/youtube]
Nothing to do with Bombardier. Connex (South Central and South Eastern) insisted on having a different connector to the rest of Bonbardiers products for the 375s and 377s. When Southern took over and ordered the 170s they had to be different to the other 170s by having a connector that worked with the 375 and 377s so they were re-classified as 1771s.
There is nothing like standards but sadly, in many cases, there is nothing like standards.

390s use Dellners not Scharfenberg's![]()
It is not necessarily as clear cut as that. 'Dellner' and 'Voith Turbo Scharfenberg' (and other firms) both manufacture 'Scharfenberg pattern' mainline couplers. Herr Scharfenberg first designed his coupler and then licensed it, and it became a European standard.
I checked the two company's websites a while back and they are mechanically compatible - it's the electrical and pneumatic connections that cause the problems.
According to RSSB's info sheet M007 the Dellner 12 as used in Pendolino, Voyagers, Desiros is a 'Scharfenberg pattern' coupler.
So it's fair to say that when referring to couplers you need more than just the manufacturer's name - for instance the big lump on a 458 is completely different, but is also still a 'Scharfenberg' AAR...
Some detailed info here:
http://www.rssb.co.uk/SiteCollectionDocuments/rv_coupling_system_data/mechanical/M007.pdf
172332 has made it to Leamington Spa today.
I spoke to someone from London Midland today, he said the plan was for the Class 172's to enter service "around the time the new timetables come into place"
Chiltern are maintaining that the 172s will come into service from the May 2011 timetable (ref Twitter)
I know 172101 is out and about - but have the remaining three units been built yet? Seems to be running a bit close, if not
I spoke to someone from London Midland today, he said the plan was for the Class 172's to enter service "around the time the new timetables come into place"
the lack of seats
And if there are no hand/grab rails inside, I hope the driver doesn't brake too sharpish.![]()
It'll be just like standing on a Pacer - completly unsafe!
It has apparently gone to Reading for coupling compatibility tests with a 166, not that they are likely to work together in the forseeable future, but you never know.
Or May 2012![]()
It has apparently gone to Reading for coupling compatibility tests with a 166, not that they are likely to work together in the forseeable future, but you never know.