Kneedown
Established Member
They made speculative enquiries regarding the use of, I think, a 47 + Mk. 2 + DBSO rake. There was only 1 available, and seeing as the line is now run by single dogboxes, it would only free up one single unit. Needless to say, the costs outweighed the benefits.
The plan was for two 31 + Mk2 + DBSO rakes, ex Serco i believe. They even did a couple of test runs but it was the timimngs that put paid to the idea. On the mainline even a 31 could leave a 153 for dust, but the station dwell times were longer, as well as the turnaround times at Crewe, and so mucked up the pathing. Thats why the idea never came to fruition. Pity as i was looking forward to driving EE's again!
