Sorry but you can hardly blame Northern for the train being a 25 year old Rust bucket now can you?
The constant digs at Northern **** me off.
The repairs to 150135 are absolutely nothing to do with the way Northern have run the unit.
I know when the 144023 centre vehicle will be back in traffic, but no doubt the information will be used to beat Northern with so what's the point?
144023 is apparently back in service, but operating as a 2-car set.
Geeves:1721409 said:Im sure Northern would be more than happy to get 135 back from Scotland, they like to take their precious time with the repairs!
All it means is that they sweat the assets a little more instead leading to even more demics!
The repairs to 150135 are absolutely nothing to do with the way Northern have run the unit.
Not sure if it is coincidence or not, but 144023 was parked at Newton Heath on Saturday
Was it re-united with the centre car that tried to cook itself though? The driving cars have been running as a 2-car for months, out of its home depot of Neville Hill.
Now reformed as a 3 car
YUS!