DasLunatic
Member
- Joined
- 11 May 2015
- Messages
- 696
Does anybody know what'll happen to Heathrow Connect's 360s after Crossrail takes over the service? Are they set to join their brethren on the GEML?
Last edited:
Most likely to Abellio Greater Anglia as to goto SWT, LM or TPE they'd probably need new cabs
It's not normally suggested that they would go to SWT, as they're not DC capable.
Given the modular nature of Desiros could existing AC only ones be equipped with DC if they ever needed to?
Are they not more likely to go to either Northern or TPE possibly?
No really as for Northern it would be a real microfleet and for TPE they'd want to have new cabs installed with corridor connections.
How many units are required per day for the gatwick express?
I think Heathrow own the 332's used on Express services not Connect. BAA is defunct.Aren't the units owned outright by BAA? May they'll sell them on to Thailand who use the same class... when I was in Bangkok last year the airport express route was not running due to long term rolling stock unavailability...
I think Heathrow own the 332's used on Express services not Connect. BAA is defunct.
Aren't the units owned outright by BAA? May they'll sell them on to Thailand who use the same class... when I was in Bangkok last year the airport express route was not running due to long term rolling stock unavailability...
That would make a lot of sense if the issue in Thailand is a general stock shortage (maybe needing a bigger maintenance pool) - particularly as, in the UK, they will be an awkward sub-fleet going into what will be a buyer's market.
However, if the problem in Thailand is maintenance or component related, they won't want more of the same units, it would just make whatever problem they have bigger.
The air conditioning system on these trains is designed for the Thai climate, and the roof-mounted equipment pods are much larger than those on the UK units.
That would make a lot of sense if the issue in Thailand is a general stock shortage (maybe needing a bigger maintenance pool) - particularly as, in the UK, they will be an awkward sub-fleet going into what will be a buyer's market.
However, if the problem in Thailand is maintenance or component related, they won't want more of the same units, it would just make whatever problem they have bigger.
As built werent at least a couple fitted with gangways?. Seem to vaguely remember that they were a sort of Desiro UK demonstrator at one time.

Can't see fitting a new cab to be prohibitive - after all SWT have just done that on their Juniper units (with ex GatEx bits) to make them look like "fake Desiros"![]()
Not too sure why a new cab is necessary to move them to London Midland or TPE tbh
Indeed. The 350/4s have gangways largely because that had become the de-facto standard for 20m Desiro bodyshells, rather than being specifically requested by TPE.
The most likely home for them is AGA.
Not sure Thailand would be a viable place:
It might not be viable to add all that to an exisiting unit
Indeed. The 350/4s have gangways largely because that had become the de-facto standard for 20m Desiro bodyshells, rather than being specifically requested by TPE. That said, the lack of gangways on the 185s seems now to have been rather short-sighted...
The most likely home for them is AGA.
The Thai aircon equipment looks like it's just bolted to the roof of a standard UK profile unit. Likely the same design could be added as a conversion.Changing the aircon would probably be much easier than changing the cab end.
I must admit I never understood why when building a totally new line you'd restrict yourself to UK loading gauge rather than a wider one with more standard UIC gauge trains.
Though (as the interior is basically the 350/1 interior including the colour scheme) the airport express units probably feel like a home from home!