• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Christmas Day Operations

Status
Not open for further replies.

Mothball

Member
Joined
26 Nov 2018
Messages
179
Hello all and Merry Christmas!

Now its well known that the rail network pretty much shuts down for the day but reading on this forum I see there is a shuttle running between the Heathrow stations, im not from that area so don't know of that is a yearly thing but it got me thinking, is there anywhere else on the network running today? I've no doubt there will be a few engineering trains somewhere making the most of the shutdown but I presume they made there way to the area in the previous days with nothing having to run any sort of distance today.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DB

Guest
Joined
18 Nov 2009
Messages
5,036
Are any operators running tomorrow?

Last year Northern ran a very minimal service on a few lines only (the first time they'd run at all on boxing day), but back to nothing again this year.
 

High Dyke

Established Member
Joined
1 Jan 2013
Messages
5,002
Location
Yellabelly Country
Don't forget many signal boxes / signalling centres may also be open for engineering work, that also may or may not require train movements.
 

jack31439

Member
Joined
29 Apr 2016
Messages
78
Location
South London
Gatwick Express/ Southern running a Victoria to Gatwick service tomorrow calling at CLJ and ECR, so I'm in work unfortunately.
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,581
Are any operators running tomorrow?

Last year Northern ran a very minimal service on a few lines only (the first time they'd run at all on boxing day), but back to nothing again this year.
TfL Rail is running every 30 minutes between Heathrow and paddington.
 

Flange Squeal

Established Member
Joined
17 Jul 2012
Messages
1,853
Are any operators running tomorrow?

Greater Anglia
  • Tottenham Hale to Stansted Airport (half-hourly)

Heathrow Express:
  • London Paddington to Heathrow Terminal 5 (half-hourly)

London Overground
  • Dalston Junction to West Croydon (every 15 mins)
  • Gospel Oak to Clapham Junction (every 15 mins)

ScotRail
  • Balloch to Larkhall (hourly)
  • Balloch to Mortherwell (hourly)
  • Glasgow Central to Ayr (half-hourly)
  • Glasgow Central to Ardrossan (five journeys)
  • Glasgow Central to East Kilbride (half-hourly)
  • Glasgow Central to Largs (hourly)
  • Glasgow Central to Gourock (hourly)
  • Glasgow Central to Kilmarnock (hourly)
  • Glasgow Central to Lanark (hourly)
  • Glasgow Central to Neilston (half-hourly)
  • Glasgow Central to Newton (half-hourly)
  • Glasgow Central to Paisley Canal (hourly)
  • Glasgow Central to Shotts (two-hourly)
  • Glasgow Central to Wemyss Bay (hourly)
  • Glasgow Queen Street to Anniesland (hourly)
  • Glasgow Queen Street to Cumbernauld (hourly)
  • Helensburgh to Bathgate (half-hourly)
  • Kilmarnock to Girvan (two-hourly)
  • Milngavie to Motherwell (half-hourly)
  • Partick to Springburn (hourly)

Southern
  • London Victoria to East Croydon via Crystal Palace (half-hourly)
  • London Victoria to Sutton via West Croydon (half-hourly)
  • London Victoria to Three Bridges (half-hourly, alternate trains continue to Brighton hourly)

TfL Rail
  • London Paddington and Heathrow Terminal 5 (half-hourly)
 

AMD

Member
Joined
6 Dec 2017
Messages
771
Last year Northern ran a very minimal service on a few lines only (the first time they'd run at all on boxing day), but back to nothing again this year.
Transport for the North signed off the decision to not run anything Boxing Day this year, with the Covid effect driving the decision. There will be services again next year, and more than was attempted in 2019.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,893
Location
Fenny Stratford
There are many thousands of people out there right now working on the track. They often seem to be overlooked.
 

Tallguy

Member
Joined
3 Mar 2011
Messages
404
There are many thousands of people out there right now working on the track. They often seem to be overlooked.
Hope they are getting triple rate. I for one don’t really do Xmas so would happily work on Xmas day at a suitable premium rate if my job warranted it. Some years ago I passed interviews and assessments to join LUL (which I eventually declined the job) but one of the things that came up in the informal group sessions was Xmas day working, which did appeal to me.
 

LAX54

Established Member
Joined
15 Jan 2008
Messages
3,906
Think we had 7 into Colchester today :) (almost an hourly service at one point through Ipswich)

== Doublepost prevention - post automatically merged: ==

Don't forget many signal boxes / signalling centres may also be open for engineering work, that also may or may not require train movements.

Most PSBs /IECCs/ROCs, if not all, are open 365 days a year. (think I can count on one hand how many Christmas / Boxing Days days I have had off since 1972!)
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
Transport for the North signed off the decision to not run anything Boxing Day this year, with the Covid effect driving the decision. There will be services again next year, and more than was attempted in 2019.
I'm surprised they didn't do something similar in the south east. I mean who will need to travel between Brighton and London tomorrow? If they do, their need to travel can't surely be any greater than someone on a train line without a service, aka South Western Railway or even Northern.

== Doublepost prevention - post automatically merged: ==

Think we had 7 into Colchester today :) (almost an hourly service at one point through Ipswich)

== Doublepost prevention - post automatically merged: ==



Most PSBs /IECCs/ROCs, if not all, are open 365 days a year. (think I can count on one hand how many Christmas / Boxing Days days I have had off since 1972!)
Do they remind open on lines where no trains are running today? Iz there anything they can do if trains aren't running? Learning, admin, maintenance for example?
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,607
Location
South Staffordshire
Think we had 7 into Colchester today :) (almost an hourly service at one point through Ipswich)

== Doublepost prevention - post automatically merged: ==



Most PSBs /IECCs/ROCs, if not all, are open 365 days a year. (think I can count on one hand how many Christmas / Boxing Days days I have had off since 1972!)
Also worth remembering that some loco and traincrew depots were manned over Christmas to keep the locos serviceable. There were footplate staff rostered to Frost Precautions duties which involved starting the locos up and running them for a couple of hours then shutting them down to keep them warm and preventing ice damage.

In the 1960s era Bescot BOP and TMD there were frost warning devices bolted to an exterior wall with an audible warning and pairs of indicator lamps for first stage and second stage frost warnings. The TCI had to press a button to acknowledge the warning.

Also reminding that since privatisation there has been ballast train activity over the festive period. One ofthe memorable ones for me was a huge relaying and reballasting project between Bushbury Jn and Stafford around 2000. Not sure how many trains were involved but they were pretty long ones some with pairs of 37s.

Finally to restart on Boxing night BR used to run route proving locos over certain routes to make sure all the signalling worked correctly.
 

LAX54

Established Member
Joined
15 Jan 2008
Messages
3,906
I'm surprised they didn't do something similar in the south east. I mean who will need to travel between Brighton and London tomorrow? If they do, their need to travel can't surely be any greater than someone on a train line without a service, aka South Western Railway or even Northern.

== Doublepost prevention - post automatically merged: ==


Do they remind open on lines where no trains are running today? Iz there anything they can do if trains aren't running? Learning, admin, maintenance for example?
If there is no Engieering Work / S&T work etc, and the route is not needed for Engineering Trains, then the box will close after last service on Christmas Eve / Day and open at the start of the shift where the first train is booked to run.#In a PSB / IECC there will be a reduced staffing level, and those booked on will cover all the panels / workstations as required during the day (& night !) A PSB with say 11 on duty normally, will possibly have 4 in, covering panels as needed, depending on the work being carried out.
 

TheEdge

Established Member
Joined
29 Nov 2012
Messages
4,498
Location
Norwich
If there is no Engieering Work / S&T work etc, and the route is not needed for Engineering Trains, then the box will close after last service on Christmas Eve / Day and open at the start of the shift where the first train is booked to run.

How does that work for UWCs? If the East Suffolk is closed and Saxmundham is closed do the UWCs get a recorded message saying its safe to cross or do they divert to an open box or a ROC?
 

LAX54

Established Member
Joined
15 Jan 2008
Messages
3,906
How does that work for UWCs? If the East Suffolk is closed and Saxmundham is closed do the UWCs get a recorded message saying its safe to cross or do they divert to an open box or a ROC?
Not sure what they did this year, but in the past, the MOM or LCM used to visit all the xings with phones and placed stickers / notices on the phones to advise line was closed at the times on the notice.
 

Tom Quinne

On Moderation
Joined
8 Jul 2017
Messages
2,225
I'm surprised they didn't do something similar in the south east. I mean who will need to travel between Brighton and London tomorrow? If they do, their need to travel can't surely be any greater than someone on a train line without a service, aka South Western Railway or even Northern.

== Doublepost prevention - post automatically merged: ==


Do they remind open on lines where no trains are running today? Iz there anything they can do if trains aren't running? Learning, admin, maintenance for example?

My location is open 365/24, on Xmas day we have one signaller from each link overseeing the workstations in each of their links. There’s no trains running, aside from a handful of possession related trains so it’s just answering the phone to PICOPS / ES / S&T staff doing work out there.

Smaller locations usually close after any possessions have been granted, with the box remaining closed until day turn Boxing Day or even 27th depending on what service is running.
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,195
Is it time for my Speke Junction Christmas story?

If not, please don't read on.

The Yard Supervisor was worried that the local scallys would help themselves to the detonators on locos over the Christmas break with explosive consequences.

So he removed them all and locked them in a hut.

Which the scallys burned down over Christmas.

Come the 27th plenty of locos; no detonators.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
Probably running because Gatwick Airport is on that line
I doubt anyone is flying in or out of Gatwick Airport much. Certainly no Great Western Railway service to thr airport.

Wouldn't Northern run to airports boxing day 2019?
 

High Dyke

Established Member
Joined
1 Jan 2013
Messages
5,002
Location
Yellabelly Country
How does that work for UWCs? If the East Suffolk is closed and Saxmundham is closed do the UWCs get a recorded message saying its safe to cross or do they divert to an open box or a ROC?
From my own experience, those locations that are closed have an absence switch for AHB level crossings and the phone concentrator, where UWC calls would be routed. If that particular line is closed then it is just like a normal closed route situation for the crossings.

In some cases a crossing may have the alternative number of the respective Operations Control for users to ring. We have this at a couple of stations, where I cover.
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,581
It may be the case that Gatwick airport has an agreement with the DfT for a minimum service provision on boxing Day.

Or that GTR are contractually obliged by the DfT to run a service boxing day.

The fact that the agreement is temporarily is not needed because of a covid related fall in demand. Doesn't mean they cannot honour it.
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,990
It may be the case that Gatwick airport has an agreement with the DfT for a minimum service provision on boxing Day.

Or that GTR are contractually obliged by the DfT to run a service boxing day.

The fact that the agreement is temporarily is not needed because of a covid related fall in demand. Doesn't mean they cannot honour it.
Running them (at the DfT or airport's expense) probably helps keep the rails shiny and free of leaves and ice too.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
Running them (at the DfT or airport's expense) probably helps keep the rails shiny and free of leaves and ice too.
I'd expect more ice in the North where Northern decided not to run services this boxing day. I assume the running of side services was in their franchise agreement.
 
Status
Not open for further replies.

Top