Bletchleyite
Veteran Member
In this week's Rail magazine (and also alluded to in this month's Modern Railways) is a proposal by Chris Gibb for an HS2 service pattern involving HS2 stock at 186mph and Pendolinos at 155mph using the line as a mixed traffic route far more like what you might see in Switzerland or Italy. This allows 11 trains per hour to run on HS2 (so the full WCML IC service as at present) without loss of capacity. The Pendolinos would be fully refurbished and get new traction packages, pantographs and I think wheelsets (going from memory). Note I've not quoted the article because I only have it in paper form (I don't subscribe to the digital services of either magazine) and it would take too long to retype the whole thing!
Anyone who does have access to RAIL's digital services can read the article here:
www.railmagazine.com
This makes a lot of sense to me - indeed it's almost what I was calling for as what HS2 should be - a proper German/Swiss style fill-in Neubaustrecke in preference to something more self contained.
What do others think? The only obvious problem it seems to cause to me is the platform-edge doors at Old Oak.
Anyone who does have access to RAIL's digital services can read the article here:
Gibb plans HS2 alternative with 155mph Pendolinos
Former Virgin West Coast manager Chris Gibb is putting forward a radical alternative to the cancelled HS2 route between Birmingham and Manchester, writes Peter Plisner
The idea would be that Liverpools would use single HS2 units, as would a Manchester-Birmingham service. Euston-Birmingham would use 400m pairs of units. Euston-Manchester and Euston-Scotland would use 11 car Pendolinos. North Wales would remain classic line using 805s. Nothing was said about other residual classic services. Euston would get two (if I recall correctly) 400m platforms and Manchester could perhaps gain some later to allow those to go to 400m pairs.Former Virgin West Coast manager Chris Gibb is putting forward a radical alternative to the cancelled HS2 route between Birmingham and Manchester, writes Peter Plisner.
Gibb envisages maximum use of existing assets, including a major refurbishment of the Class 390 Pendolino fleet with a 155mph upgrade.
Gibb was chief operating officer at Virgin West Coast. He has pulled his plan together with the help of his many contacts...
This makes a lot of sense to me - indeed it's almost what I was calling for as what HS2 should be - a proper German/Swiss style fill-in Neubaustrecke in preference to something more self contained.
What do others think? The only obvious problem it seems to cause to me is the platform-edge doors at Old Oak.
Last edited by a moderator: