The route from Princes Risborough to Thame exists completely as it is used as a public footpath called the Phoenix Trail, the oil terminal does not obstruct the line but a level crossing there would need to be rebuilt, the line also exists at the Oxford end as it is used as a freight line by the BMW Mini works, the expensive bit is the crossing of the M40 motorway which has cut the old line in two, there are neighbouring fields to miss out the service station which has taken some of the lines route so that isnt so much an issue.
The cost of re establishing this link was estimated at £250 Million in 2002 prices, clearly Project Evergreen 3 is going to be nowhere near this amount. I do see the Thame/Oxford link being rebuilt but the Bicester chord is a good interim option, plus the East-West link, Aylesburys connection to Milton Keynes and Watford and a Chiltern Metro Service are higher in the priority order.
As i said just above, unless you buldoze a substantial amount of Wheatley, Littleworth and Horspath, its impossible. It has all been built on by housing, and very expensive housing at that. Chiltern are aware of this and arent taking it forward. You would need a very large bridge to cross the M40, then another new one to bridge the existing A40. It just isnt feasible.