Not a lot to report - they're plodding on with the formation of the new chord - it's all excavators and dumpers at work just now. A major hiccough seems to be a culvert which is having to be extended about half-way up the new ramp. But a new foot-bridge has appeared since my last snoop, although different in form it is certainly out of the same box as the Tubbs Lane bridge. This one carries the formerly severed footpath heading north-east from Gavray drive over the new chord - that's close to the Chiltern Main-line overbridge.
After many weeks (months even) of not very much to see, laying the foundations so to speak, the formation of the chord is now clearly visible rising up from ground level to meet the Chiltern mainline.
I've managed to upload some photos to show the progress - most taken from Gavray drive looking east. The first 4 show the view from north (left) with the chord rising to the south.
In the last week or so I've seen lorries on top of the embankment at the level with of the Chiltern line. The culvert over the Langford Brook (which seemed to take so much time to complete) now carries the embankment above. The formation would appear to be substantially complete - or at least enough to allow lorries to reach the top.
As mentioned the new footbridge is now in place on footpath FP129/3 at Gavray Drive. This footpath is still closed - the closure notice extends to 31 October 2014 implying it should be open fairly soon though. (The path has been closed for over a year - the closure notice date having been extended at least twice previously). The new bridge can be seen in the first of the photos (taken last Friday 10/10/14) The bridge is a similar design to others around the country, including the one at Tubbs Lane. It arrived in sections on 22/23 September.
At Charbridge Lane (Bicester perimeter road) site access has been constructed beside bridge 23A on the Chiltern Line. The next 2 photos were taken here this afternoon (when the weather was more overcast so not particularly clear) showing the view looking north with the new embankment diverging from Bicester South Junction. Lastly one more photo taken today from close to the new footbridge looking south.
Incidentally, there don't appear to be any trains to/from MOD Bicester this week as there is 7 day working in the vicinity with a possession in place - see
notice.