Chiltern Oxford Link completed

Status
Not open for further replies.

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,021
I think Gatwick have announced their intention to pester the industry to run trains from Oxford-Gatwick. They won't be running them themselves, and I don't suppose they will help to pay for them. If they do happen, it will be via reading as an extension of the existing North downs service.

It then leads to the slightly off topic of does this then make it even more likely that the gaps in the electrification on the North Downs Line will be electrified? As it would remove the need for a lot of under wire running.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tsr

Established Member
Joined
15 Nov 2011
Messages
7,400
Location
Between the parallel lines
It then leads to the slightly off topic of does this then make it even more likely that the gaps in the electrification on the North Downs Line will be electrified? As it would remove the need for a lot of under wire running.

Bald Rick will probably have better knowledge of this than I do, but I'd imagine any current ideas might not mandate electrification if they only involve an extension of services from Reading to Oxford (and not beyond), bearing in mind that stretch of line is not electrified yet, and does not constitute the core of either current or short-term future traffic on the NDL, in any case.
 

davetheguard

Established Member
Joined
10 Apr 2013
Messages
1,938
Thames Trains used to run trains from Oxford to Gatwick via Reading (via the North Downs Line with a reversal at Redhill) during the 90's. Surely that way again makes more logical sense.

Yes, they did: very early in the morning & very late at night. There was even a through Turbo to Three Bridges once a day. I think they wanted to run a regular hourly service Oxford - Reading - Gatwick Airport. But the paths weren't available across the Western Main Line to Spur Junction on the Southern, so it didn't happen.

But with Reading station rebuilt and the dive-under from the north side of the formation to the Southern now re-instated, perhaps it would now be possible?
 
Joined
18 Apr 2009
Messages
193
Location
South East
But with Reading station rebuilt and the dive-under from the north side of the formation to the Southern now re-instated, perhaps it would now be possible?

I could imagine trains from Gatwick getting as far as Didcot (since the GWML is four tracked between RDG and DID), but surely a continuation to Oxford would involve too much risk of importing delays from Redhill and Guildford into GW territory.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,021
I could imagine trains from Gatwick getting as far as Didcot (since the GWML is four tracked between RDG and DID), but surely a continuation to Oxford would involve too much risk of importing delays from Redhill and Guildford into GW territory.

It depends on how much dwell time they add in at Reading, if it stops at Reading for (say) 5 minutes it still is an improvement on having to change trains but allows for a short delay elsewhere and still be able to leave Reading on time or within a few minutes.
--- old post above --- --- new post below ---
Bald Rick will probably have better knowledge of this than I do, but I'd imagine any current ideas might not mandate electrification if they only involve an extension of services from Reading to Oxford (and not beyond), bearing in mind that stretch of line is not electrified yet, and does not constitute the core of either current or short-term future traffic on the NDL, in any case.

I am aware that it is not planned to be electrified in CP5, it was more a case of if you are running diesel services on already electrified sections (Oxford to Wokingham and Ash to Guildford and Redhill to Gatwick) would that improve the likelihood of electrification by any significant amount.

Presumably it would depend on how frequent such a service was. Once or twice a day and it will have little or no impact, twice and hour and the case would be very strong.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,607
With two different types of electrification on the route, staying diesel makes the most sense for the time being. Plus they could run longer trains with some of the Turbos to be released.

I'd rather they run a much faster, regular service which was established:
Oxford - Didcot - Reading - Wokingham - Guildford - Redhill - Gatwick

and add an additional frequency to cover dropped calls at Farnborough, North Camp, Dorking etc with the spare Turbos. The line has a lot more potential I think.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,589
Location
Nottingham
Electrifying the remaining bits of Reading-Gatwick would allow 319s to be used (in current dual-voltage configuration, excuse the pun). Along with the GW branch lines this could make up a worthwhile fleet size of 319s to be based in the Reading area, even though the main line services probably need something faster.
 

midlandred

Member
Joined
20 Feb 2007
Messages
263
Location
Oxfordshire
I have put together a gallery of photos taken this morning along the line from Langford Lane crossing to Mill Lane crossing - these photos will be transferred after a couple of weeks into their relative galleries!

Cheers
 

RobLawrence

Member
Joined
13 Oct 2012
Messages
47
Some pics from the Bicester Chord and its environs taken today and yesterday: Thursday 12 and Friday 13 June. Nothing like the spectacular brilliance of @midlandred's work, but they show some interesting activity and the pace of change nonetheless.


picture.php


picture.php


picture.php


picture.php
 
Last edited:

L&Y Robert

Member
Joined
22 Apr 2012
Messages
585
Location
Banbury 3m South
Had a look at Tubbs Lane BRIDGE this afternoon (Wed.18th), now fully open and in use (very busy pedestrian route, I noted). But it has been be-smearched already with grafitti on the nice new paint.
Did they forget to make provision for lighting? There is lighting of course, but the installation looks very much like an after-thought, the entire installation - light fittings and cables - is fixed to the balustrades by means of cable ties! Surely this is just temporary, until proper lights can be installed?
 

aylesbury2

Member
Joined
17 Feb 2014
Messages
120
The bridge/walkway has just been featured on tonight's BBC Oxford News. It's definitely been reported on a significant number of times weekly.

w2iznp.jpg


5baz5.jpg
 

davetheguard

Established Member
Joined
10 Apr 2013
Messages
1,938
Is it just me, or does the reaction by the Bicester nursery seem way over the top?

Network Rail seem to be offering options in an attempt to mitigate the problem, and the nursery are making to be threats to sue.....

Yes, the bridge is overscale and ugly, but has to be to meet the DDA legislation. Yes, people walking past might be able to look down through a fence and be able to see a playground from several meters away. Scarcely the end of the world is it?
 

ironstone11

Member
Joined
3 Jan 2013
Messages
217
Is it just me, or does the reaction by the Bicester nursery seem way over the top?

Yes, over the top, that was my feeling having heard the comments from the owners of the nursery.

In any case the nursery will probably be closed when the local trouble-makers are around.
 

aylesbury2

Member
Joined
17 Feb 2014
Messages
120
Yes, over the top, that was my feeling having heard the comments from the owners of the nursery.

In any case the nursery will probably be closed when the local trouble-makers are around.

I don't think it'll even be any sort of problem. Many visitors of Bicester are affluent tourists or visitors heading for Bicester Village.

Bicester is a very nice town and isn't exactly the crime hotspot of the UK!
 

petersi

Member
Joined
24 Apr 2012
Messages
453
I wander if its attempt for network rail to pay to expand the Business

The nursery preferred option

"The meeting was told the nursery’s favoured option was to build an extension on the other side of the building and change the overlooked area into a car park."

If privacy is so important why have they not put up a fence to stop passers by looking at classrooms nearest pavement (streetview)
 
Last edited:

FenMan

Established Member
Joined
13 Oct 2011
Messages
1,538
With two different types of electrification on the route, staying diesel makes the most sense for the time being. Plus they could run longer trains with some of the Turbos to be released.

I'd rather they run a much faster, regular service which was established:
Oxford - Didcot - Reading - Wokingham - Guildford - Redhill - Gatwick

and add an additional frequency to cover dropped calls at Farnborough, North Camp, Dorking etc with the spare Turbos. The line has a lot more potential I think.

Sorry to continue the digression from the main thread ....

The push by Gatwick Airport for direct services to Oxford is a cheeky attempt to grab holidaymaker traffic away from Birmingham and Southampton Airports, both of which are just over an hour from Oxford by rail.

Even if capacity was available for additional trains to Gatwick via the North Downs - which there isn't at the Redhill end - the journey time would still be 1h 40m at best.

I doubt that users of Blackwater, North Camp and Dorking would take kindly to a service reduction to accommodate possible airport traffic from a small city more than 80 miles from Gatwick.
 

ironstone11

Member
Joined
3 Jan 2013
Messages
217
Sorry to continue the digression from the main thread ....

The push by Gatwick Airport for direct services to Oxford is a cheeky attempt .

This is definitely the wrong thread for this discussion.

This thread relates to Oxford - Bicester - Marylebone and East-West rail.

It would be better to start a new thread if you wish to duscuss Oxford - Reading - Gatwick.
 

aylesbury2

Member
Joined
17 Feb 2014
Messages
120
This is definitely the wrong thread for this discussion.

This thread relates to Oxford - Bicester - Marylebone and East-West rail.

It would be better to start a new thread if you wish to duscuss Oxford - Reading - Gatwick.
I'd quite like to know a bit more about the link, a new thread would be a great idea imo!
 

RobLawrence

Member
Joined
13 Oct 2012
Messages
47
The Colas / Network Rail ballast train has been in the vicinity of the Bicester chord this week. Locomotive 70809, only in the UK three weeks, was immediately visible from the London Road Crossing in Bicester on Wednesday approx 1830.

picture.php
 

tsr

Established Member
Joined
15 Nov 2011
Messages
7,400
Location
Between the parallel lines
Even if capacity was available for additional trains to Gatwick via the North Downs - which there isn't at the Redhill end - the journey time would still be 1h 40m at best.

At the risk of continuing off-topic, I should briefly add that Redhill should be getting a new platform in the next few years, which is at least partially set to be used by reversing North Downs Line trains. Whether that is any good when combined with the same limited capacity at the junction South of the station is another matter.
 

L&Y Robert

Member
Joined
22 Apr 2012
Messages
585
Location
Banbury 3m South
I was over there at Bicester again yesterday, having a snoop round. Not a lot to report - they're plodding on with the formation of the new chord - it's all excavators and dumpers at work just now. A major hiccough seems to be a culvert which is having to be extended about half-way up the new ramp. But a new foot-bridge has appeared since my last snoop, although different in form it is certainly out of the same box as the Tubbs Lane bridge. This one carries the formerly severed footpath heading north-east from Gavray drive over the new chord - that's close to the Chiltern Main-line overbridge. It isn't open yet, though (25/09/2014).
 

Andyjs247

Member
Joined
1 Jan 2011
Messages
734
Location
North Oxfordshire
Not a lot to report - they're plodding on with the formation of the new chord - it's all excavators and dumpers at work just now. A major hiccough seems to be a culvert which is having to be extended about half-way up the new ramp. But a new foot-bridge has appeared since my last snoop, although different in form it is certainly out of the same box as the Tubbs Lane bridge. This one carries the formerly severed footpath heading north-east from Gavray drive over the new chord - that's close to the Chiltern Main-line overbridge.

After many weeks (months even) of not very much to see, laying the foundations so to speak, the formation of the chord is now clearly visible rising up from ground level to meet the Chiltern mainline.

I've managed to upload some photos to show the progress - most taken from Gavray drive looking east. The first 4 show the view from north (left) with the chord rising to the south.

In the last week or so I've seen lorries on top of the embankment at the level with of the Chiltern line. The culvert over the Langford Brook (which seemed to take so much time to complete) now carries the embankment above. The formation would appear to be substantially complete - or at least enough to allow lorries to reach the top.

As mentioned the new footbridge is now in place on footpath FP129/3 at Gavray Drive. This footpath is still closed - the closure notice extends to 31 October 2014 implying it should be open fairly soon though. (The path has been closed for over a year - the closure notice date having been extended at least twice previously). The new bridge can be seen in the first of the photos (taken last Friday 10/10/14) The bridge is a similar design to others around the country, including the one at Tubbs Lane. It arrived in sections on 22/23 September.

At Charbridge Lane (Bicester perimeter road) site access has been constructed beside bridge 23A on the Chiltern Line. The next 2 photos were taken here this afternoon (when the weather was more overcast so not particularly clear) showing the view looking north with the new embankment diverging from Bicester South Junction. Lastly one more photo taken today from close to the new footbridge looking south.

Incidentally, there don't appear to be any trains to/from MOD Bicester this week as there is 7 day working in the vicinity with a possession in place - see notice.
 

Attachments

  • Bic_0101.jpg
    Bic_0101.jpg
    145.4 KB · Views: 125
  • Bic_0102.jpg
    Bic_0102.jpg
    143 KB · Views: 109
  • Bic_0103.jpg
    Bic_0103.jpg
    171.8 KB · Views: 106
  • Bic_0104.jpg
    Bic_0104.jpg
    141.7 KB · Views: 109
  • Char_111.jpg
    Char_111.jpg
    130.8 KB · Views: 123
  • Char_112.jpg
    Char_112.jpg
    125.5 KB · Views: 121
  • Bic_0106.jpg
    Bic_0106.jpg
    107.2 KB · Views: 123
Last edited: