It would take time to electrify the line. In the meantime, non-stop from Harrow to Amersham can be done sooner, even if it’s peak only or linked to fast Met line trains in off peak?
I wonder what steps towards that is possible with the current track and trains, as there are time delays in using loops. What little they achieve now involves skipping many stops (links to MYB-HWY and MYB-WRU about now).
Real-time train running information for 2W50 1719 departure from London Marylebone to High Wycombe on 11/08/2025. From Realtime Trains, an independent source of train running info for Great Britain.
www.realtimetrains.co.uk
Real-time train running information for 2R51 1723 departure from London Marylebone to West Ruislip on 11/08/2025. From Realtime Trains, an independent source of train running info for Great Britain.
www.realtimetrains.co.uk
The connectivity needs to be with Islip, Bicester, Haddenham, not Marylebone.