How many cases of a high speed line running for 150km with intermediate stops also have a line with two end-to-end trains per hour to one side of it and a line with 5tph on the other?
Typically high speed lines are built because there is insufficient capacity on the existing mainline - so with those traffic numbers who knows, but certainly they will have been high traffic almost by definition.
In terms of the Chiltern mainline you can see from
the ORR data that from Leamington Spa that only 20% or a little more of passengers go to London, so if we assume it’s the same from Solihull and Dorridge there are maybe as many as 450k passengers a year going to London from those stations. Maybe as many as 2/3rds of those passengers will travel into Birmingham and out again for a shorter trip time? It’s not going to reduce Chilterns ridership to London by much - especially when no one going anywhere but London can plausibly use HS2 as it stands, and where from Warwick Parkway and further south the trip time with HS2 to London won’t be quicker.
From Birmingham Moor Street to London maybe there are as many 750,000 trips a year which is what Solihull the top pair gets, but on the other hand everyone is travelling on price. Perhaps if HS2 has cheaper fares than Avanti they will switch, or perhaps the speed improvement will be sufficiently strong to be worth it.
All in all the business case isn’t going to be affected much by HS2 as it stands but there will be more impact if there is a stop, but on the other hand there will be more connecting trips so thats the trade off.