Where will electrification of the Chiltern Mainline start and progress from?

  • Marylebone northwards

    Votes: 47 41.2%
  • Oxford to Bicester with East-West Rail and then south towards Marylebone

    Votes: 23 20.2%
  • Oxford to Banbury then North for Cross Country and Freight

    Votes: 15 13.2%
  • Coventry to Leamington and southward

    Votes: 1 0.9%
  • Birmingham to Leamington for commuter services and then southwards

    Votes: 19 16.7%
  • Other (please comment and explain)

    Votes: 9 7.9%

  • Total voters
    114
Status
Not open for further replies.

BantamMenace

Member
Joined
2 Dec 2013
Messages
573
There aren't many people who don't think this will happen at some stage in the next 20 years but where will electrification start and progress from?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jyte

Member
Joined
27 Oct 2016
Messages
671
Location
in me shed
I'm voting for Crosscountry north of Banbury because: EWR has been re-scoped and will now not be an electric railway.

If the electric spine gets itself back together then there will only be a comparatively small amount of work needed to get electric traction through to Moor Street and Snow Hill, and then they can work on wiring the mostly self contained half south of Banbury.

Honestly I don't think Chiltern will be electrified until much later, which is a shame because the southern half is mostly a self contained railway (baring the Amersham issue).
 
Last edited:

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,440
Oxford-Banbury-Coventry if Oxford to Didcot gets wired for GWR. It would allow the introduction of dual volt intercity stock to run Manchester to Bournemouth and switch more freight to electric locos. I think it will not happen for a long time though.
 

B&I

Established Member
Joined
1 Dec 2017
Messages
2,484
I'd like to say from the Brum end, but is there much point to that if you don't electrify out the other way, from Snow Hill to Worcester?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,685
Electric spine is dead and will only happen via infill, FOCs won't buy electric loco's until its is worth their while. You would start where you get the biggest bang for buck, I would do Stourbridge to Leamington first and possibly from the other end to High Wycombe. Then you work to fill the middle in.
 

adrock1976

Established Member
Joined
10 Dec 2013
Messages
4,450
Location
What's it called? It's called Cumbernauld
I have voted for Marylebone northwards as my first preference.

This is because out of the Class 165s, 168s (original Clubman), 170s, and 172s, the Class 165s are the oldest (circa 1992) and will be coming to the end of their designed operational lifespan in the second half of the 2020s.

Alternatively, I am with The Planner regarding the suggestion above. Perhaps the 172s could be used to replace some of the Class 150 Sprinters on the Valley Lines network or for the former Midland/Great Central/Cheshire Lines Committee routes around Manchester?
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,256
Electric spine is dead and will only happen via infill, FOCs won't buy electric loco's until its is worth their while. You would start where you get the biggest bang for buck, I would do Stourbridge to Leamington first and possibly from the other end to High Wycombe. Then you work to fill the middle in.
Completely agree it also has the biggest impact on (urban) NOx levels and helping getting them below thresholds
 

aylesbury

Member
Joined
3 Feb 2012
Messages
622
Honestly cant see the wires going up in the next twenty years as it wont really benefit anyone ,the current diesel service is okay and new demus will appear as required .The big problem is who will run the lines in the next franchise the current operator is an excellent one and has revitalised our services and my dreaded happening is for one of the new crop of companies getting their hands on it,But the DFT seem to listen only to big money offers and new trains even if the current stock is fit for purpose plus it will probably be a seven year franchise all so as civil servants can look good.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,575
Location
Lancashire
I think electrification should start in 2 o3 locations to speed the scheme up. Start in London Northwards, Birmingham Southwards and say Banbury in both directions
 

Kettledrum

Member
Joined
13 Nov 2010
Messages
804
If it happens my guess is it will coincide with the introduction of bi-modes or tri-modes with the aim of getting diesel fumes out of London Marylebone and out of Birmingham.
 

gazthomas

Established Member
Joined
5 Jun 2011
Messages
3,466
Location
Llandudno
I think it should start at Marylebone going to High Wycombe first then Banbury and beyond. Optimistically Chiltern’s rolling stock is mid-life at best and bi-mode replacement may bridge the gap. The old franchises funded a series of improvements and maybe this approach can go some way to funding electrification
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
If it happens my guess is it will coincide with the introduction of bi-modes or tri-modes with the aim of getting diesel fumes out of London Marylebone and out of Birmingham.
I suppose that could be achieved by having part-battery part diesel. I just don't see any future even for deferred electrification, at the moment.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
for Harrow on the Hill to Amersham, how hard is converting the existing fourth rail system to that used on the Watford DC and Richmond branch, with the 3rd rail at 630V and the fourth at 0V and bonded to a running rail?
 

NickBucks

Member
Joined
17 May 2013
Messages
250
Doubt it ever will. Given that nothing is likely to happen until the new franchise is in place and the existing 165 units are life expired then surely by that time , late 2020's, technology advances will mean that either super efficient battery powered units or hydrogen powered units will be available.
 

Kneedown

Established Member
Joined
29 Dec 2007
Messages
1,837
Location
Nottinghamshire
I've voted "Other". I can't see any electrification of the Chiltern route in the near future.
I'd like to see it wired along with the full MML instead of HS2, but don't think it will happen.
 

MatthewRead

On Moderation
Joined
21 Nov 2014
Messages
1,643
Location
West london
I think it will happen during the next control period engineers seem to be confident but I have mentioned this before and no one rally knows certainly it won't be happening until after the current franchise expires.
 

NSEFAN

Established Member
Joined
17 Jun 2007
Messages
3,518
Location
Southampton
I reckon that Chiltern electrification will be considered to be a self-contained project. Given that the London-end is where the wires are most needed then this will happen first, with wires extending as far as Oxford and Banbury. Trains will be either bi-mode (diesel + OHLE) or tri-mode (diesel + OHLE + 4th rail) to allow running on the Metropolitan route and beyond Banbury.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,685
I think it will happen during the next control period engineers seem to be confident but I have mentioned this before and no one rally knows certainly it won't be happening until after the current franchise expires.
No chance, it was never going to be before CP7 regardless, more likely CP8.
 

Doctor Fegg

Established Member
Joined
9 Nov 2010
Messages
2,135
Location
Charlbury
I’d expect Aylesbury to happen before the main line - it’s unusual as an unelectrified pure London commuter route.
 

BantamMenace

Member
Joined
2 Dec 2013
Messages
573
I’m no engineer but I can’t imagine there are too many structures between Leamington and Oxford/Bicester that would cause too much of an issue to electrification. Could be a cheap per route mile electrification relevant to some current projects.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,574
Location
Brighton
IMHO:
0) Oxford => Leamington
1) OOC => High Wycombe
2) Oxford => High Wycombe
3) Bletchley => Princes Risborough
4) Birmingham => Leamington
5) Bicester => Banbury
6) Marylebone => Aylesbury via HotH
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,685
IMHO:
0) Oxford => Leamington
1) OOC => High Wycombe
2) Oxford => High Wycombe
3) Bletchley => Princes Risborough
4) Birmingham => Leamington
5) Bicester => Banbury
6) Marylebone => Aylesbury via HotH

Oxford to Leamington wouldn't deliver anything, it doesn't allow anything to transfer to electric traction. There is also no point just doing Birmingham to Leamington, you would do it to Stourbridge as you capture the Snow Hill locals. You have also forgotten the Claydon to Bicester bit of East West if you do it with your suggestion. You would also do Leamington to Coventry, probably at the same time as you did Stourbridge to Leamington.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
My guess would be, at least in part for political reasons so as to not be seen as only investing in London, would be to wire up around Birmingham out to Banbury (with a link to Oxford).

This would then allow quite a few services to be changed to EMU (or at least electric running) through Birmingham. This could include XC services (possibly EMU services between Manchester and the south coast).

Given that electrification will almost certainly be post HS2 and so their services would primarily be for local trains and so it's more likely that the electrification of services out of London would potentially be focused on the services to Oxford rather than Birmingham.

With the potential to use 22x's as the Birmingham services (reformed to be single units the same length as the existing loco sets, which would give an increase in capacity) until circa 2035-2040 that would be my target goal for all Chiltern services to be wired up.

However, that still leaves about 20 years and so there's plenty of scope to wire up other parts of the network as well in that timeframe.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,574
Location
Brighton
Oxford to Leamington wouldn't deliver anything, it doesn't allow anything to transfer to electric traction. There is also no point just doing Birmingham to Leamington, you would do it to Stourbridge as you capture the Snow Hill locals. You have also forgotten the Claydon to Bicester bit of East West if you do it with your suggestion. You would also do Leamington to Coventry, probably at the same time as you did Stourbridge to Leamington.

Ah yes, I was still subconsciously factoring in the electric spine, which would have delivered Oxford to Nuneaton. As for Stourbridge, "Birmingham" was just a generalised location rather than a specific point. Probably should have put "Birmingham suburban services" or some such instead. That said, isn't there a Leamington to Moor Street service? Don't know the frequency of that one. I would tend to agree that Stourbridge Junction to Leamington Spa would probably be required to give a viable amount of usage to justify the project though.
 

centraltrains

Member
Joined
3 Jan 2015
Messages
521
Location
West Midlands
Do you think the rest of the Snow Hill Lines would likely get electrified along with any future potential Chiltern electrification? (Mainly Startford - Tyseley via Shirley)
 

ajs1981

Member
Joined
10 Sep 2017
Messages
32
That said, isn't there a Leamington to Moor Street service? Don't know the frequency of that one

Yes there is. I think it's a single or double unit that shuttles between the two. Journey time is probably around 40 minutes, I think Leamington turnaround is about 10 minutes, Moor Street I don't know
 