I know it maybe a little too soon but recently I've read the Chiltern Main line is due for electrification in the early 2020s and that it could get a standardized fleet of bi-mode units if so please clarify.
I know it maybe a little too soon...
I know it maybe a little too soon but recently I've read the Chiltern Main line is due for electrification in the early 2020s and that it could get a standardized fleet of bi-mode units if so please clarify.
Given that the Northern franchise award has affirmed the continued use in front line service of class 150s of 1985 vintage until 2025 and inevitably into at least the first few years of the successor franchise, I don't think that we need even worry about the longevity of Chiltern's 1991 built class 165 stock.The 165s are growing a bit long in the tooth but the majority of the stock used by Chiltern, namely the 168s (just about) and the 172s are quite modern.
Bi Mode will be the interim when the rolling stock needs to be replaced which from be until the next Chiltern franchise. Think the end of 2021 the current franchise expires, if it doesn't get an extension.
The 165s are growing a bit long in the tooth but the majority of the stock used by Chiltern, namely the 168s (just about) and the 172s are quite modern. The mark 3s are fairly old but have been recently overhauled and refurbished so they might as well be considered modern. Likewise, London Midland's fleet of class 172s only date from 2011 and the oldest stock they use on their services on this route are the 153s and these aren't used on many Snow Hill services.
Given that the Northern franchise award has affirmed the continued use in front line service of class 150s of 1985 vintage until 2025 and inevitably into at least the first few years of the successor franchise, I don't think that we need even worry about the longevity of Chiltern's 1991 built class 165 stock.
If GWR replaces some of their (now bi-mode) 801s with 'pure' electric units once GWeP is finally completed, perhaps a bidder for the Chiltern franchise will secure a deal on some of these units?
Or is that complete wibble on my part?
The Chiltern franchisee could just order new fully electric AT300s, or whatever the next best EMU is by the time the line is electrified. Siemens Verve, anyone?
I know there are issues with 172s, the Met line and tripcocks but we put a man on the moon so I'm sure we could figure out how to attach a tripcock to a 172 if we really needed to.
Just an idea to make use of some units whose diesel capability will be going spare (eventually).
Just an idea to make use of some units whose diesel capability will be going spare (eventually).
Isn't it possible to remove the diesel engine from the bi-modes to make them fully electric? I thought that was one of the supposed benefits of the bi-mode trains in the first place.
The Chiltern franchisee could just order new fully electric AT300s, or whatever the next best EMU is by the time the line is electrified. Siemens Verve, anyone?
What's the point of buying 125/140mph-capable EMUs when you only need 100mph?
An East Anglia solution is more likely.
Anyway, it's at least 5 years too early for the debate.
Remember HS2 will have transformed the London-Birmingham market by 2026.
It's probably more important what happens to the XC operation on the route (plus E-W).
There will also probably be Marylebone-Milton Keynes services to consider.
I don't think Chiltern would have a need for bi-mode stock as much as say... Crosscountry.
Unless I missed it I'm surprised everyone is going on about bi-mode stock if electrification happens rather than mentioning dual-voltage stock! There is a chunk of the Chiltern network shared with the Met, so having something that can run on overhead and fourth rail will be a requirement there. I say fourth rail, but it could be third rail if LUL modify the fourth rail to work how it does on say the District between East Putney and Wimbledon (although that still requires dual-voltage stock AND LUL to modify their infrastructure).
Another option might be to cut the Metropolitan back to Watford via the slow lines only from Harrow to Moor Park. That would give total segregation between the Chiltern and the Met, so they could have their own electrification systems and avoid most of the earthing problems of dual electrification.
The suburbans are more likely to stay at Marylebone with some of the long distance going to OOC via Park Royal.
The MML is due to be electrified to Sheffield by 2022. This will free up the Meridians. From 2026 most if not all of WCML Voyagers will be freed up because of HS2. By 2026 there wil potentially be be 47 Merdians and Voyagers that could be cascaded to Chiltern, which would decrease journey times without needing any infrastructure upgrades. I would be surprised if Chiltern electrificatiom was started before 2030.