• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Changes at Bridlington

Status
Not open for further replies.

mike57

Established Member
Joined
13 Mar 2015
Messages
2,369
Location
East coast of Yorkshire
When passing through Bridlington Saturday lunchtime travelling northbound we used Platform 5. I know this was sorted out and made possible in the recent resignalling and rationalisation, but the use of Platform 5 now seems to be the norm, with Platform 4 only being used when services to and from Scarborough pass. (Platform 6 is still used by terminating trains)

I can see sense in it, step free access without using the barrow crossing, but RTT is still showing Platform 4. Is it a permanent thing or a trial to see how it works. Given the current reduced service I would imagine most services northbound to Scarborough can use Platform 5 as the services cross at or just north of Hunmanby at the other end of the long single track section if everything is running to time.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,922
Location
Airedale
When passing through Bridlington Saturday lunchtime travelling northbound we used Platform 5. I know this was sorted out and made possible in the recent resignalling and rationalisation, but the use of Platform 5 now seems to be the norm, with Platform 4 only being used when services to and from Scarborough pass. (Platform 6 is still used by terminating trains)

I can see sense in it, step free access without using the barrow crossing, but RTT is still showing Platform 4. Is it a permanent thing or a trial to see how it works. Given the current reduced service I would imagine most services northbound to Scarborough can use Platform 5 as the services cross at or just north of Hunmanby at the other end of the long single track section if everything is running to time.
That seems to be true in the full timetable (not checked the whole day!) and it is an obvious change to make.
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,806
There's very few booked to use $ now in the WTT, except when necessary, and even most of those I can see are due to crossing an RHTT, so when that isn't running the signaller might route it into 5 anyway.
 
Status
Not open for further replies.

Top