mike57
Established Member
When passing through Bridlington Saturday lunchtime travelling northbound we used Platform 5. I know this was sorted out and made possible in the recent resignalling and rationalisation, but the use of Platform 5 now seems to be the norm, with Platform 4 only being used when services to and from Scarborough pass. (Platform 6 is still used by terminating trains)
I can see sense in it, step free access without using the barrow crossing, but RTT is still showing Platform 4. Is it a permanent thing or a trial to see how it works. Given the current reduced service I would imagine most services northbound to Scarborough can use Platform 5 as the services cross at or just north of Hunmanby at the other end of the long single track section if everything is running to time.
I can see sense in it, step free access without using the barrow crossing, but RTT is still showing Platform 4. Is it a permanent thing or a trial to see how it works. Given the current reduced service I would imagine most services northbound to Scarborough can use Platform 5 as the services cross at or just north of Hunmanby at the other end of the long single track section if everything is running to time.