LucaZone
Member
Cathedral Hill - Multiple Unit Depot
Size: 8'x1' (plus 6" hidden fiddle yard)
Scale: N-Gauge
Power: DCC
Era: Post Privatisation and Sectorisation
Misc: Compatible with 4 Track N-Mod as used by N-Gauge Berkshire Area Group
The originally proposed track layout. Not much has changed during construction except for more operational interest I have added crossovers between the two closest mainlines.
Construction Progress:
Part of my desire with this layout was that when in transit it could fit in my car without having to put the rear seats down to get it in.
The end plates are used to box up the two main boards for transit, usually the layout will operate without them in place.
Finishing off the trackwork
being new to DCC, I setup some very basic wiring to test out how the whole thing works and get the track smooth for trains to run over.
This is the layout in transit form
Size: 8'x1' (plus 6" hidden fiddle yard)
Scale: N-Gauge
Power: DCC
Era: Post Privatisation and Sectorisation
Misc: Compatible with 4 Track N-Mod as used by N-Gauge Berkshire Area Group
The originally proposed track layout. Not much has changed during construction except for more operational interest I have added crossovers between the two closest mainlines.
Construction Progress:
Part of my desire with this layout was that when in transit it could fit in my car without having to put the rear seats down to get it in.
The end plates are used to box up the two main boards for transit, usually the layout will operate without them in place.
Finishing off the trackwork
being new to DCC, I setup some very basic wiring to test out how the whole thing works and get the track smooth for trains to run over.
This is the layout in transit form
Last edited: