• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Cathdral Hill TCD

Status
Not open for further replies.

LucaZone

Member
Joined
24 Feb 2006
Messages
752
Location
West End, Surrey
Cathedral Hill - Multiple Unit Depot

Size: 8'x1' (plus 6" hidden fiddle yard)
Scale: N-Gauge
Power: DCC
Era: Post Privatisation and Sectorisation
Misc: Compatible with 4 Track N-Mod as used by N-Gauge Berkshire Area Group

Depot_logo.jpg


The originally proposed track layout. Not much has changed during construction except for more operational interest I have added crossovers between the two closest mainlines.
Module2_small.jpg


Construction Progress:
CH_001.jpg

CH_002.jpg


Part of my desire with this layout was that when in transit it could fit in my car without having to put the rear seats down to get it in.
CH_003.jpg


The end plates are used to box up the two main boards for transit, usually the layout will operate without them in place.
CH_004.JPG

CH_005.JPG


Finishing off the trackwork
CH_006.jpg

CH_007.jpg

CH_008.JPG

CH_009.JPG


being new to DCC, I setup some very basic wiring to test out how the whole thing works and get the track smooth for trains to run over.
CH_010.JPG

CH_011.JPG


This is the layout in transit form
CH_012.JPG
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LucaZone

Member
Joined
24 Feb 2006
Messages
752
Location
West End, Surrey
Hiya,

Latest on the woodwork side of things. Tonight the layout stood on its own two feet...well actually 6 of them. Things were concerning at first as in testing the legs hadnt proved that stable, but once the whole structure was up it was very sturdy indeed.

CH_013.JPG


With the main backscene boards also now installed, once the setup is broken down it boxes very neatly together. The extra 6" x 4' strip is the as yet unstarted fiddle yard that will hang off the back of the of the main boards.

CH_014.JPG


Finally an image of the wiring being completed. Replacing the test setup from before with better routing and cable ties.

CH_015.JPG
 
Last edited:

LucaZone

Member
Joined
24 Feb 2006
Messages
752
Location
West End, Surrey
Been a few months and progress hasnt been great, but here is a look at what ive done in the mean time.

Wiring of Switch Pilots
CH_017.jpg
CH_018.jpg


Footprint of the heavy maintenance shed
CH_021.jpg


Base area where the wash units will be installed, dead centre of the display, as well as the fiddle yaard access hole which will be behind the double stack porta-cabins used to control the washer units.
CH_022.jpg


Overview of the layout
CH_024.jpg
CH_023.jpg


Construction of the fiddle yard behind the backscene
CH_026.jpg

CH_025.jpg

CH_020.jpg
 
Status
Not open for further replies.

Top