That would require finding a path across the running lines at Crewe, which I understand are pretty scarce.Perhaps TfW could be offered the ability to do this from the other direction i.e. via Crewe and the Styal line?
That would require finding a path across the running lines at Crewe, which I understand are pretty scarce.Perhaps TfW could be offered the ability to do this from the other direction i.e. via Crewe and the Styal line?
Or providing the long-thought-of platform(s) on the Independent Lines.That would require finding a path across the running lines at Crewe, which I understand are pretty scarce.
I was thinking of a service originating from the Chester direction, like the current service. (Though the Independent Lines approach would work from Shrewsbury.)Or providing the long-thought-of platform(s) on the Independent Lines.
I think passengers and politicians alike would find 4tph Leeds to Manchester unacceptable. You get crowding with 5 and the original aim was to increase to 6
I think passengers and politicians alike would find 4tph Leeds to Manchester unacceptable. You get crowding with 5 and the original aim was to increase to 6
The Calder Valley services are also busy. I would say Manchester- Bradford could sustain 3tph if not 4. I take the point about longer trains but still think 4 tph per hour via Huddersfield is insufficient
Would making every train heading to/from Manchester Airport an all-stations stopper from Piccadilly have any effect?
The Calder Valley services are also busy. I would say Manchester- Bradford could sustain 3tph if not 4. I take the point about longer trains but still think 4 tph per hour via Huddersfield is insufficient
Even with 8/10 coaches 3 per hour is not sufficient
4 trains per hour is plenty, the trains are just too short.
How about 3 per hour each using doubled up 802s and 10-coaches of mk5s, non stop Manchester-Leeds, with Huddersfield-Leeds served by quarter-hourly 3-6 coach shuttles and Manchester-Huddersfield a half hourly shuttle?
Really? I very much doubt it. I reckon that would be more than sufficient. 3 x 10 x 26m is a lot of train, particularly compared to the amount of capacity now. You're talking a capacity of around three thousand people per hour, and that's mostly seated.
If that is enough for London to Manchester, which I would expect to be the busiest IC flow in the UK[1], I suspect it is indeed enough for TPE.
[1] I don't count Reading, which might otherwise pip it, because that is a commuter flow that happens to be partly accommodated on IC trains.
I believe 4ph Leeds to Manchester via Huddersfield would be perfectly sufficient, if they were the right number of carriages. Remember even with 5 now, the times between them are not equal and they tend to turn up in each other’s paths anyway.
Ideally you’d have York to Manchester, via Leeds and Huddersfield, 2 calling at Dewsbury, 2 calling at Stalybridge, all 4 running to the same Manchester station, and running to a tidy every 15 minutes timetable.
I agree with the view that the only short to medium term of restoring some resilience to the timetable is culling 2 of the 11 through services through Castlefield.Before May 2018 there were 8 passenger services per hour between Oxford Road and Piccadilly; although far from perfect, the timetable worked passably well. IMO a reasonable near term objective would be to prune services back to that level, but by "quick and dirty" culling of services from the current 11tph timetable, with only local changes, rather than attempting to roll back the 2018 recast.
They run via the east coast main line. Cross country services ceased to go through 13 and 14 at some point between 2003 and 2007.Could not see any mention of the xc services from Penzance to Edinburgh via Birmingham new street. I am sure they use platforms 13 and 14 also.
Also you have some shorter ones starting from man picc through to Bristol temple meads as well, what would you do with these, axe them.
Before May 2018 there was the Southport to Manchester Airport service, so Southport commuters have some justification when they claim they have built their lives around a direct service to jobs in the Oxford Road/Piccadilly area.Southport to Alderley Edge: this seems a highly frivolous service just to pacify passengers in Southport for a direct link to Piccadilly to detriment of passenger south and immediately west of Manchester. Prior to May 2018 this formed part of a reliable Crewe to Manchester Piccadilly stopping service which was adequately serviced with 3/4 coach 319s/323s.
Before May 2018 there was the Southport to Manchester Airport service, so Southport commuters have some justification when they claim they have built their lives around a direct service to jobs in the Oxford Road/Piccadilly area.
The only Northern services through the corridor that are really additional since May 2018 are the Liverpool - Crewe and the Barrow/Windermere - Airport. The others are just changes to the southern terminus
(Southport) or to the route (Liverpool - Airport). The two Blackpool services are unchanged.
Before May 2018 there was the Southport to Manchester Airport service, so Southport commuters have some justification when they claim they have built their lives around a direct service to jobs in the Oxford Road/Piccadilly area.
The only Northern services through the corridor that are really additional since May 2018 are the Liverpool - Crewe and the Barrow/Windermere - Airport. The others are just changes to the southern terminus
(Southport) or to the route (Liverpool - Airport). The two Blackpool services are unchanged.
Be interested to hear others' thoughts about my idea above for merging the Southport-Alderley service into the Cumbria-Airport at Bolton, to free up a path through Castlefield?
Are there any obvious stumbling blocks for doing this?
Currently the two services are scheduled almost half an hour apart at Wigan in both directions, so a major timetable recast would be needed to pair them. This would take time to plan and implement, and even if paths could be found, it might be necessary to slow one or other service to get them to match.Be interested to hear others' thoughts about my idea above for merging the Southport-Alderley service into the Cumbria-Airport at Bolton, to free up a path through Castlefield?
Are there any obvious stumbling blocks for doing this?
2 tph Blackpool and all stations to Bolton, then non-stop to Salford Crescent, Oxford Road and Piccadilly, with 1 extending non-stop to the Airport and the other to Hazel Grove
The Chat Moss stopper is not really an equivalent service to the previous semi-fast, even though it runs on the same line. It is so slow that it is of little use for intercity journeys from Lime Street to Piccadilly/Airport. Therefore it is arguably less deserving of a path through the congested corridor. Diversion to Victoria would mainly inconvenience some of the users of the intermediate Chat Moss stations, while benefiting some others who want to go to that side of Manchester or to change to Leeds or Calder Valley services.Liverpool - Crewe isn't really additional, there was the Chat Moss Liverpool-Airport; with the new CLC Liverpool - Airport replacing Liverpool - Scarborough on that section. Basically a stopper was swapped to Piccadilly and a fast to Victoria. The additional services are the 2tph over the Ordsall Chord and the Barrow/Windermere services which don't do portion working anymore.
1. Cull the Crewe-Liverpool stopper: Crewe to terminate into Piccadilly. Chat Moss stopping service from Liverpool to revert back to Victoria. There is a great deal of risk associated with service with crew changeovers at Oxford Road and if it is running late (or TPE services are running late) then the faster trains behind to Manchester Airport are also delayed.
2. Southport to Alderley Edge: this seems a highly frivolous service just to pacify passengers in Southport for a direct link to Piccadilly to detriment of passenger south and immediately west of Manchester. Prior to May 2018 this formed part of a reliable Crewe to Manchester Piccadilly stopping service which was adequately serviced with 3/4 coach 319s/323s. However for the past 18 months for most of their journey they have been needlessly running as diesels under electric wires - although the 769s are due in service in March I have doubts about their reliability once in service as a retro-fitted bi-mode. Like many other once reliable routes it has been needlessly thrown into the gutter just to satisfy the demands of a small faction.