As someone who's regularly traveled over this junction, on the Lewisham avoiding lines and used by passenger and empty stock changing from the relief to the main lines or vice-versa, the 15mph speed to crossover I think is too slow, especially on the high traffic line that it is which would increase hold-ups compared to faster crossovers (such as the 40mph reverse crossover just down the line towards Hither Green).

While I haven't seen any plans, would remodeling the junction by making it longer and smoother be possible? If it could be raised to 30-40mph trains would clear it faster, reducing journey times slightly for those that use it and, while not totally solving a hold-up issue, would reduce the number of such incidences, especially in peak periods.
Another reason it could be done is the recent re-modelling of the crossovers at Chislehurst station to run at 40 instead of 20, plus remove the 60mph restriction for 70 all the way through is evidence junction improving is in Network Rail's agenda to some good extent. 
Having seen the area many times if it could be done it wouldn't be easy, given a possession would be required, which despite having been done many times here (and Lewisham allowing some trains through), would be annoying given the many times the line has been closed giving all the London Bridge stuff and more. Also space is tight with the super-elevated curve before St Johns and the Hayes line link spur at the other end, but I think there would be enough room if signals were re-positioned.
Does anyone though if work for this has been considered?
While I haven't seen any plans, would remodeling the junction by making it longer and smoother be possible? If it could be raised to 30-40mph trains would clear it faster, reducing journey times slightly for those that use it and, while not totally solving a hold-up issue, would reduce the number of such incidences, especially in peak periods.

Having seen the area many times if it could be done it wouldn't be easy, given a possession would be required, which despite having been done many times here (and Lewisham allowing some trains through), would be annoying given the many times the line has been closed giving all the London Bridge stuff and more. Also space is tight with the super-elevated curve before St Johns and the Hayes line link spur at the other end, but I think there would be enough room if signals were re-positioned.
Does anyone though if work for this has been considered?
Last edited: