NamelessPoster
Member
A solution such as management offering to take all stock out of service for a month with the staff NOT being paid in this time is hardly the way to avert strike action nor is trying to offer sweeteners such as a bonus payment and London waiting getting paid to staff if the strike was called off.
--- old post above --- --- new post below ---
So do you have an explanation as to why the same stock used by FIRST is now being used by SERCO and the service is chaotic by comparison with services woefully short-formed, lounge cars withdrawn etc etc. This did not happen with First. Why?
--- old post above --- --- new post below ---
None of that is evidence! They haven't been used yet! Those articles were written before any 73/9 had even been completed and the only part that says anything I didn't say is the man from ASLEF making idiot claims about the 73's service history.
The main problems that there have been with locos have been the Class 92s (GBRf) taking over from the Class 90s (previously hired from DBS). Class 92 are newer than Class 90 and much, much more powerful. Lower top speed, but still a top speed well above normal operating speed. They have however had issues with the power supply problems.
So do you have an explanation as to why the same stock used by FIRST is now being used by SERCO and the service is chaotic by comparison with services woefully short-formed, lounge cars withdrawn etc etc. This did not happen with First. Why?
Last edited: