Peter Sarf
Established Member
As an indication as to how much the 197s are stretched I observed the following at Crewe yesterday (Thursday 08/10/2026/).
The late running 16:29 from Milford Haven to Manchester came into platform 6 as 4car 197. Then detached the rear two cars (197014). I watched as everyone (some belatedly and panicking) struggled to get on the front two coaches.
This (197014) then reversed out of platform 6 to make way for other services and I guessed it would become the 17:10 from Manchester to Cardiff (starting from Crewe). So I realised a two car 197 covering for a 67 + Mk4s and nothing from Manchester to Crewe.
I was going to use this to get to Nantwich but switched to the 17:19 stopper to Shrewsbury which I belatedly spotted on the screens !.
I watched from the 17:19 in platform 8 (?) as platform 6 filled up with a lot of passengers and then minutes after 197014 had reversed back into platform 6 (now late) there must have been an announcement and I watched lots of prospective passengers moving along the platform towards 197014. I could not see properly but i guess some might have been left behind.
My 17:19 left with very few passengers in the front coach by comparison. Either no one for Crewe to Shrewesbury was made aware of this alternative OR it indicates most standing passengers on the 17:10 were going beyond Shrewsbury. Not a nice "first class with catering" offering there then.
I remember seeing similar happening the last time I spent time at Crewe station. Bank Holiday Monday two 67+Mk5s were de-trained at platform 6 !.
One case replaced by a 2car 197 and the other case I think nothing.
It really indicates to me how dire the situation is if there are theoretically spare 197s (while Cambrian is not yet using 197s) but cannot cover a 5 or 6 coach South Wales / Manchester service. I can see that TfW can only safely manage a partial switch over on Cambrian any time soon so a shuttle between Pwllheli to Machynlleth seems the most we can hope for any time soon (say for 12 months).
The late running 16:29 from Milford Haven to Manchester came into platform 6 as 4car 197. Then detached the rear two cars (197014). I watched as everyone (some belatedly and panicking) struggled to get on the front two coaches.
This (197014) then reversed out of platform 6 to make way for other services and I guessed it would become the 17:10 from Manchester to Cardiff (starting from Crewe). So I realised a two car 197 covering for a 67 + Mk4s and nothing from Manchester to Crewe.
I was going to use this to get to Nantwich but switched to the 17:19 stopper to Shrewsbury which I belatedly spotted on the screens !.
I watched from the 17:19 in platform 8 (?) as platform 6 filled up with a lot of passengers and then minutes after 197014 had reversed back into platform 6 (now late) there must have been an announcement and I watched lots of prospective passengers moving along the platform towards 197014. I could not see properly but i guess some might have been left behind.
My 17:19 left with very few passengers in the front coach by comparison. Either no one for Crewe to Shrewesbury was made aware of this alternative OR it indicates most standing passengers on the 17:10 were going beyond Shrewsbury. Not a nice "first class with catering" offering there then.
I remember seeing similar happening the last time I spent time at Crewe station. Bank Holiday Monday two 67+Mk5s were de-trained at platform 6 !.
One case replaced by a 2car 197 and the other case I think nothing.
It really indicates to me how dire the situation is if there are theoretically spare 197s (while Cambrian is not yet using 197s) but cannot cover a 5 or 6 coach South Wales / Manchester service. I can see that TfW can only safely manage a partial switch over on Cambrian any time soon so a shuttle between Pwllheli to Machynlleth seems the most we can hope for any time soon (say for 12 months).