Lots of local objections but the biggest was the landowner, the National Trust. However, Network Rail backed off because when looked at in detail the amount of embankment and cutting needed was greater than first envisaged.The Hope Valley Capacity Project certainly is value for money, but it is not sufficient for the long term and there is little scope for further enhancement works within the National Park. Network Rail had to move the new loop further west from the site originally proposed at Grindleford to the site now approved at Bamford because of local objections. This has made it less effective for freight regulation.
It's true that a lot of stone moves out of the Peak District by road. How much could be transferred to rail is unknown, but many of the single truck loads would not be deliverable in train loads to dedicated sidings. The big loop north to Guide Bridge to bring stone south is an issue that could be eased. New potential speculative thread warning! Build a chord in Reddish Vale between Brinnington and Reddish South. That would not go down well locally I'm sure.Despite much stone to the south moving by rail, there is at least an equal amount moving in the same direction by road, as the residents of Ashbourne can testify. Reducing the length and time of the rail journey, which currently heads north, then east or west before finally heading south, will reduce the cost to existing trains and encourage modal shift.
However, we're worrying over much about stone and cement traffic capacity. Dore West Junction is the critical point at the eastern end of the Hope Valley. Yesterday was a fairly typical busy day. I've left out the passenger services from this RTT list of services for the full 24 hours. The number of paths looks higher than it really is because many are 2 or 3 way options for starting or finishing points. Several are to take empty wagons to or from Toton or Barrow Hill because there's not enough space for them to be held at the quarries. Others are for light engines going for servicing, refuelling or redeployment. However, there's room to run more services in from the east.
Contrast that with the number that ran out or in yesterday to the west through Chinley. One light engine, so there's no shortage of available paths from that side.
I share concerns about the usefulness of the Bamford loop. It's not designed primarily for looping passenger services, but it could be. Release an eastbound stone or cement train immediately behind the stopper at Chinley or Earles. Loop the stopper after Bamford to allow the freight a clear run to Dore West and beyond. Once the freight's rolling the stopper shouldn't catch it up.
Of course if they'd planned another effective loop at Dore station by making it bi-directional (the option was there but dropped) trains could be overtaken in either direction, and it's downhill from there into Sheffield.
Then there's electrification. The long tunnels at Totley and Cowburn are probably in the too hard category. Class 93 type bi-mode freight haulage changes that outlook. Electrification in the open air sections would allow them to operate on diesel or battery in freight yards and on non-electrified mainlines they'd be able to speed up timing considerably.
Install a new crossover west of Earles and more traffic could enter more easily from the Chinley end without having to reverse across both tracks.
Before lashing out millions (be that tens or hundreds of) on reopening plans for a long disused line with an unproven market, surely it's better to invest in a neglected but living railway that cries out for further development?