Uckfield is a terminus now.
I am aware of that.
The discussion was about reinstating the section to Lewes.
Uckfield is a terminus now.
12 cars do run via Littlehampton 2ph on Saturdays 1 on Sundays but it takes an hour longer, I don't think via Uckfield will be any faster. In theory a non stop bus is quicker.
That was then, but this is now. We have a desperate need to reduce road congestion and pollution, and electric trains are the way to do it for regional and intra- and inter-conurbation traffic. I still cannot believe that there is such a prejudice against enhancing the rail network on any significant scale while road schemes go ahead all the time (apart from airline-on-wheels projects or investments in and around - or for the benefit of - Greater London.)The line was closed in 1966 because it was losing money hand over fist. Between Christ's Hospital and Shoreham it had six stations serving villages. At that time none had a large population and even today the total population served directly is pretty small. In the 1960s taxpayers were respected far more by politicians than they are today, and scrounging off the taxpayer was not considered a legitimate tactic.
Today, with mooted plans to build a line to Heathrow from the south, the means to run a service from Brighton via Guildford and Woking to our busiest airport seems very attractive, but in 1966 no-one had the necessary crystal ball.
It isn’t a current proposal. (Which might have been your meaning anyway.)
New lines such as Arundel Chord or proposed reinstatements such as BML2 don’t meet BCR requirements as diversionary routes. This is covered in the relevant route studies. They have to be permanently useful in their own right.
Every analysis of the Arundel Chord I’ve ever seen has said there is no capacity via Dorking. Some other service would have to be cancelled to make room. The current route study is very lukewarm on the idea.The Arundel Chord was a proposal in the 20 year Southern Franchise plan before that was pulled by the government of the time. The idea was that the West Coastway to Victoria services were reversed and went from Brighton to Victoria via the Arundel Curve and Dorking freeing up capacity on the Brighton main Line. It provided Dorking and Horsham with direct services to the Brighton conurbation. it would provide a far better BCR than Uckfield to Lewes because of its much lower capital costs. Uckfield to lewes is handicapped by the extra cost of replacing all the previous level crossings with bridges and the fact that under ORR rules it is not possible to electrify it on the dc system.
Regardless of whether the business case would stack up, on a practical level, could they not extent some of the existing services beyond Dorking and Horsham? This morning I noticed there were 4 trains from Dorking towards London. 9am, 9.07, 9.33 and 9.37. Three of them started at Dorking and the 9.37 started at Horsham.Every analysis of the Arundel Chord I’ve ever seen has said there is no capacity via Dorking. Some other service would have to be cancelled to make room. The current route study is very lukewarm on the idea.
None of which has much relevance to this year’s engineering works. It’s all pretty irrelevant to today’s issues.
Why would they need capacity via Dorking when the trains would run via Three Bridges?Every analysis of the Arundel Chord I’ve ever seen has said there is no capacity via Dorking. Some other service would have to be cancelled to make room.
Well I was only answering a previous post that suggested they should run via Dorking...Why would they need capacity via Dorking when the trains would run via Three Bridges?
That was then, but this is now. We have a desperate need to reduce road congestion and pollution, and electric trains are the way to do it for regional and intra- and inter-conurbation traffic. I still cannot believe that there is such a prejudice against enhancing the rail network on any significant scale while road schemes go ahead all the time (apart from airline-on-wheels projects or investments in and around - or for the benefit of - Greater London.)
Christ's Hospital to Shoreham looks like a good way to invest money, as most of the line seems unobstructed if you look at Google Earth. Lots of other things need doing too - but we may need be flexible in our thinking and box clever, maybe by developments such as putting in a people-mover from Anniesland to Possilpark to get conflicting moves off congested flat junctions.
The Arundel Chord was a proposal in the 20 year Southern Franchise plan before that was pulled by the government of the time. The idea was that the West Coastway to Victoria services were reversed and went from Brighton to Victoria via the Arundel Curve and Dorking freeing up capacity on the Brighton main Line. It provided Dorking and Horsham with direct services to the Brighton conurbation. it would provide a far better BCR than Uckfield to Lewes because of its much lower capital costs. Uckfield to lewes is handicapped by the extra cost of replacing all the previous level crossings with bridges and the fact that under ORR rules it is not possible to electrify it on the dc system.
Those trains northbound from Dorking or Horsham probably need to start empty and fill up on their way to Victoria. They also might be on their second or third trip of the morning - you can’t look at them in isolation from the rest of their existing diagrams.Regardless of whether the business case would stack up, on a practical level, could they not extent some of the existing services beyond Dorking and Horsham? This morning I noticed there were 4 trains from Dorking towards London. 9am, 9.07, 9.33 and 9.37. Three of them started at Dorking and the 9.37 started at Horsham.
Regardless of whether the business case would stack up, on a practical level, could they not extent some of the existing services beyond Dorking and Horsham? This morning I noticed there were 4 trains from Dorking towards London. 9am, 9.07, 9.33 and 9.37. Three of them started at Dorking and the 9.37 started at Horsham.
A curve at Arundel Junction would be straightforward, but the real issue is the small number of platforms at Brighton for trains this way, and them being effectively separated from the main part of the station. ...
... When I was diverted this way, quite apart from the Littlehampton double run we ran to Preston Park, and then back into the main station, which added a further 20 minutes to things. I did notice on alighting that all three platforms facing west had trains in them.
They do say in the Sussex route study that there’s only one 12 car platform available from the west coastway.AFAIK Platforms 1 and 2 can both handle 12-car - plus with the main line shut you'll also have plat 3 for up to 4-car to/from the West - (the locals are no more than 4-car)
Out of interest, does anyone have a link to the BCR input figures and calcs and for Arundel chord?
The Route Study linked to above specifically states that not only is it so, but the key reason for the concept failing its BCR in the first place is the inability of Brighton west-facing platforms to handle the additional services.Is that really the case?
Out of interest, does anyone have a link to the BCR input figures and calcs and for Arundel chord?
They do say in the Sussex route study that there’s only one 12 car platform available from the west coastway.
There’s a load of supporting figures in Appendix A of the Route Study, starting page 146. Don’t know if that helps at all.
https://cdn.networkrail.co.uk/wp-co...-East-Route-Sussex-Area-Route-Study-FINAL.pdf
The Route Study linked to above specifically states that not only is it so, but the key reason for the concept failing its BCR in the first place is the inability of Brighton west-facing platforms to handle the additional services.
Page 15 :
"Diversionary Routes for the BML
• The study sets out a costed option to build a short stretch of
new line near Arundel to provide diversionary access to the
BML. The business case calculated is low, primarily due to the
small number of services that can be diverted at times of
disruption due to the permanently limited number of west
facing platforms at Brighton."
They do say in the Sussex route study that there’s only one 12 car platform available from the west coastway.
There’s a load of supporting figures in Appendix A of the Route Study, starting page 146. Don’t know if that helps at all.
https://cdn.networkrail.co.uk/wp-co...-East-Route-Sussex-Area-Route-Study-FINAL.pdf
I would prefer HS2 to run through west London (Heathrow?) to Brighton now. Maybe add HS1 in too later. A high speed network connected into our classic network would replace airport expansion.Dorking - Horsham was peak only going all day around privatisation, SWT tried an hourly fast that evidently didn't generate much traffic.
My ultimate plan for the Brighton line would be to extend HS1 to Gatwick and eventually Brighton.
I don’t think, given the similar distances involved, that has any advantage over the usual diversion with reversal at Littlehampton for passengers going all the way to Brighton. I’d agree with ensuring other Arun Valley services are all full length, some passengers could change at Barnham as well as those going via Littlehampton.I'm just wondering if just running a shuttle between Barnham eastwards to Brighton more frequently (and lengthening it), would do, when the BML south of Three Bridges is closed, and at the same time lengthening the services to Pompey and Southampton? Pax change at Barnham.
Sorry, we’ll ask NR to close it on Monday instead, when everyone’s trying to get to work. How’s that?
I'm just wondering if just running a shuttle between Barnham eastwards to Brighton more frequently (and lengthening it), would do, when the BML south of Three Bridges is closed, and at the same time lengthening the services to Pompey and Southampton? Pax change at Barnham.
It doesn't matter: if it is a worthwhile answer to a problem then give them the training... oh, I forgot, the DafT have only allowed for the minimum possible number of traincrew in the franchise bids, and the binding contracts already signed would prevent it anyway.would the great majority of drivers sign the various routes to the coast (west of Brighton) and the coast route itself, thus allowing a short term timetable of diversions, extra shuttles and strengthening?
Really? This (and the whole franchise shambles) reminds me of this:Doesn't prevent it at all, someone stumps up the cash then I suspect they will gladly do it, the reason they don't in the meantime is because they were not asked to bid for it in the ITT.
There was an important job to be done. Everybody was sure that Somebody would do it. Anybody could have done it, but Nobody did it. Somebody got angry about that, because it was Everybody’s job. Everybody thought Anybody could do it, but Nobody realized that Everybody wouldn’t do it. It ended up that Everybody blamed Somebody when Nobody did what Anybody could have done.
The story may be confusing but the message is clear: no one took responsibility so nothing got accomplished.
Realising I am writing from ignorance, (I forgot the SOU -VIC don't run on Sundays) would the great majority of drivers sign the various routes to the coast (west of Brighton) and the coast route itself, thus allowing a short term timetable of diversions, extra shuttles and strengthening?
Pretty sure that all Southern drivers that work to Brighton and west sign all routes except via Dorking, diversions are made in response to problems. Don't know if 700's are cleared for Horsham - Arundel Jct and Hove - Brighton P1 & 2. The only depot west of Brighton is Barnham incorporating Littlehampton and Bognor, does anyone know if drivers can sign on remotely as that's where the trains are.