A rough change interval of 2 years seems a bit strange.
Is that normal considering the current limit on tubes not boilers is approx 10 years?
The same site
states that 63737 had a fresh boiler fitted every 2-3 years from 1931 through 1958. Back in the day, when steam locos were around in large numbers, railways kept extra boilers about. When an engine came in for a service, it would have its boiler removed and replaced with a freshly inspected one, to get the engine back in service quicker. The boiler would then be inspected independently, and later fitted to another engine.
--- old post above --- --- new post below ---
Boilers were often lifted when the loco was overhauled, even if only a retube was required. The duty cycle of locos in those days mean't that tubes didn't last anywhere near ten years. Overhauls of steam engines were carried out at very frequent intervals too. 2 to 2.5 years would be about normal for a LNER heavy freight engine.
You got there before me...
But there is something wrong with that plate being associated with an 04 - a diagram 15 boiler worked at 180 lb psi.
I've just noticed the number on the brass plate could read 3425 or 3423.
Edit: I've found a Diagram 49A boiler #3423 fitted to two class B16s from 1943 to 1950,
here. Would that be a 225psi boiler design? LNER/Eastern region is out of my expertise.