When can we expect an announcement on the start of the real delivery phase?
Work is supposed to start in November this year
When can we expect an announcement on the start of the real delivery phase?
Work is supposed to start in November this year
I imagine the announcement will be hyped to the rafters with everybody and their granny claiming credit!
If there's something they need now it's a good news rail story.
It was definitely my idea, which I have been planning since 1968, aged 3.
Seriously, I think people in the Borders will only start to believe it when gangs of Irish gentlemen start to turn up with picks and shovels. They may be surprised that its not the same gangs that were here in 1847-49.

Followed no doubt by indignant reports in the Galashiels Bugle or whatever it's called, of shocking scenes of drunkeness and fighting on payday 1840s style![]()
We don’t want a repeat of the events at the opening of the Liverpool and Manchester however good the publicity boost might be. Some of them will do anything to get in the papers.
The promoters of the Bill were adamant that the service would be all stops to Tweedbank every 30 minutes ie an extension of the existing Newcraighall service. The dynamic loops identified in the Bill were/are intended to make this service pattern optimal. Despite frequent reassurances to the contrary there still is a certain amount of belief here in the borders that the railway will be cancelled or terminated at Gorebridge.
Looking again at Tweedbank, has there been a census of opinion taken from the workforce on the sizable industrial estate there, which would give a station passenger usage in total when combined with the travelling intentions of the resident population.
To make a real change to public transport within the Borders the line will need to be extended to Hawick with a bus interchange at St Boswells to serve Kelso and Jedburgh separately.
Yes, they were regulars on the line the 1960's.Did the Class 17 "Clayton" diesel locomotives ever operate in the Hawick area in their time ?
There is a lot of ignorance about the project, spread in no small part by the NIMBYism and misinformation of the Borders Party and their ilk that have been campaigning against the railway since rebuilding was first seriously considered.
Not sure what the point of this article is as there is absolutely nothing new in it.
http://www.heraldscotland.com/news/...y-could-be-next-capital-tram-debacle.19139123
As I recall in BR days the line speed was around 55 mph.
100mph according to Campaign for Borders Rail http://www.campaignforbordersrail.org/faqs.html
When did Transport Scotland actually make the official announcement of the 100mph limit ?
It says 50 minutes Edinburgh - Galashiels. Now that's 33½ miles, which makes an average of about 40mph.
Given the nature of the line I'd be surprised it it was built to more than 85mph. The campaigns 100mph figure is probably "aspirational"
Has anyone contacted Campaign for Borders Rail to ask where their authority to use the term "100mph" in their website material eminated from ?
Maybe you should ask them? If you have been given the authority to ask them of course...
If it's built with say, a planned use of 90mph, isn't there a factor built into the building quality? ie, it would be dreadful if a train were to hit 91mph and the infrastructure were to collapse...
Uh??? Really? On a railway that sees just 11 trains each way per day ? I don't doubt the new service was a success but surely that figure is a typo?