Well the 31st came and went without any big announcement - apparently it's been put off until "week commencing 5th November".
Well the 31st came and went without any big announcement - apparently it's been put off until "week commencing 5th November".
How are Campaign for Borders Rail dealing with both the matter of the £50million project cost increase and this setback in their latest publicity...or do we still await their views to be made known ?
Edinburgh's trams on the Borders railway...?
the project will see trains return to the Borders for the first time in more than 40 years
Work starting on LothianBridge viaduct it seems.
Any plans to extend south and combine with the Steel rd preserved section project or is 2 lines over the border enough? I assume the time advantage for Carlisle Edinburgh over the Waverly is minimal over the present route
So enough of a chance for Mr S to get behind it then? It'd be a cross border line of course, so we'd have to pay.From what I have heard in the past, there is more chance of Fort William FC winning the Scottish Premiership, than to see the continuation of this line onwards in the direction that you state and reaching Carlisle..:roll:
The original project strategy was abandoned in September 2011 with Network Rail Scotland being asked by the Scottish Government to take the project forward under a new remit covering:-
A)....A total of 35 miles of new railway with seven new stations.
B)....The route to be mainly single track with three dynamic passing loops and on the line infrastructural side, a total of some 26 new bridges to be constructed and 88 of the existing line structures to be utilised.
What's the difference between a "Passing Loop" and a "Dynamic Passing Loop"?
Isn't a dynamic loop one where they are long enough to entail that neither train using it has to slow down to pass?
What's the difference between a "Passing Loop" and a "Dynamic Passing Loop"?
If a crossing loop is several times the length of the trains using it, and is suitably signalled, then trains proceeding in opposite directions can pass (cross) each other without having to stop or even slow down. This greatly reduces the time lost by the first train to arrive at the crossing loop for the opposing train to go by. This system is also referred to as a dynamic loop.
The excavation will allow a double track section of rail to pass under the A720, 200 metres east of Sheriffhall Roundabout
I'd always heard that the mining in the area meant there was no way of tackling the Sherrifhall bottle-neck on the Edinburgh by-pass. Interesting to know that this doesn't appear to be the case (?)
They'd have been working by now if they'd built it in sections. Hope we aren't seeing similar problems here.
From what I have heard in the past, there is more chance of Fort William FC winning the Scottish Premiership, than to see the continuation of this line onwards in the direction that you state and reaching Carlisle..:roll: