Well the 31st came and went without any big announcement - apparently it's been put off until "week commencing 5th November".
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,389
Location
A typical commuter-belt part of north-west England
Well the 31st came and went without any big announcement - apparently it's been put off until "week commencing 5th November".

How are Campaign for Borders Rail dealing with both the matter of the £50million project cost increase and this setback in their latest publicity...or do we still await their views to be made known ?
 

kylemore

Member
Joined
28 Aug 2010
Messages
1,047
How are Campaign for Borders Rail dealing with both the matter of the £50million project cost increase and this setback in their latest publicity...or do we still await their views to be made known ?

I got the news of the slight delay from their website.

As for the £50m increase - well so what to be honest?

The cost of the Aberdeen bypass motorway has doubled in the last 3/4 years we've just been told.

That's how things are done in the UK ie. not very efficiently!

I really don't think ordinary people care about these things any more - it's just numbers over which they have no control or say (the situation never changes no matter which political label or combination thereof is voted in).
 

marks87

Established Member
Joined
23 Jun 2010
Messages
1,658
Location
Dundee
Anyone fancy opening a book on what will run first - Edinburgh's trams on or the Borders railway...?
 
Last edited:

kylemore

Member
Joined
28 Aug 2010
Messages
1,047
Also it looks like Loco hauled Charters and Specials will be accomodated by extending the platform at Tweedbank (todays Evening News) - Good news!
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
the project will see trains return to the Borders for the first time in more than 40 years

Trains have been running in the Borders all this time, just not stopping there. Or did Berwickshire declare independance?
 

fsmr

Member
Joined
11 Feb 2009
Messages
659
Any plans to extend south and combine with the Steel rd preserved section project or is 2 lines over the border enough? I assume the time advantage for Carlisle Edinburgh over the Waverly is minimal over the present route
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,389
Location
A typical commuter-belt part of north-west England
Any plans to extend south and combine with the Steel rd preserved section project or is 2 lines over the border enough? I assume the time advantage for Carlisle Edinburgh over the Waverly is minimal over the present route

From what I have heard in the past, there is more chance of Fort William FC winning the Scottish Premiership, than to see the continuation of this line onwards in the direction that you state and reaching Carlisle..:roll:
 

JohnB57

Member
Joined
26 Jun 2008
Messages
721
Location
Holmfirth, West Yorkshire
From what I have heard in the past, there is more chance of Fort William FC winning the Scottish Premiership, than to see the continuation of this line onwards in the direction that you state and reaching Carlisle..:roll:
So enough of a chance for Mr S to get behind it then? It'd be a cross border line of course, so we'd have to pay.
 

L&Y Robert

Member
Joined
22 Apr 2012
Messages
585
Location
Banbury 3m South
The original project strategy was abandoned in September 2011 with Network Rail Scotland being asked by the Scottish Government to take the project forward under a new remit covering:-

A)....A total of 35 miles of new railway with seven new stations.

B)....The route to be mainly single track with three dynamic passing loops and on the line infrastructural side, a total of some 26 new bridges to be constructed and 88 of the existing line structures to be utilised.

What's the difference between a "Passing Loop" and a "Dynamic Passing Loop"?
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Isn't a dynamic loop one where they are long enough to entail that neither train using it has to slow down to pass?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
Isn't a dynamic loop one where they are long enough to entail that neither train using it has to slow down to pass?

That seems to be the idea. Axminster doubling was always described as a dynamic loop for that reason. Obviously only works if both trains are running very near to the timetable.
 

JohnB57

Member
Joined
26 Jun 2008
Messages
721
Location
Holmfirth, West Yorkshire
What's the difference between a "Passing Loop" and a "Dynamic Passing Loop"?

The Wikipedia article on the subject has this: -

If a crossing loop is several times the length of the trains using it, and is suitably signalled, then trains proceeding in opposite directions can pass (cross) each other without having to stop or even slow down. This greatly reduces the time lost by the first train to arrive at the crossing loop for the opposing train to go by. This system is also referred to as a dynamic loop.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre

The excavation will allow a double track section of rail to pass under the A720, 200 metres east of Sheriffhall Roundabout

I'd always heard that the mining in the area meant there was no way of tackling the Sherrifhall bottle-neck on the Edinburgh by-pass. Interesting to know that this doesn't appear to be the case (?)

Personally I'd rather that they focussed on building the line to Gorebridge first (and dealt with the Galashiels end once it was up and running through Midlothian) as I think that the northern end of the line should be busier.

The "doing it all at once" approach is one of the reasons why the Edinburgh Trams aren't yet running - they'd have been working by now if they'd built it in sections. Hope we aren't seeing similar problems here.
 

michael769

Established Member
Joined
9 Oct 2005
Messages
2,007
I'd always heard that the mining in the area meant there was no way of tackling the Sherrifhall bottle-neck on the Edinburgh by-pass. Interesting to know that this doesn't appear to be the case (?)

The road sits on an East-West alignment there wheras the railway will be on a North-South(ish) alignment so it is not necessarily the case that geological factors affecting the road would also affect the railway.
 

PhilipW

Member
Joined
6 Feb 2008
Messages
761
Location
Fareham, Hants
Although, as previously stated, the line will be mainly single track with 3 dynamic loops, is it being constructed so that it all can be easily converted to double track if need be in the future ?

I presume also that all structures/bridges are designed so that they will be OHLE compatible perchance (even if unlikely) the line is electrified in the future.
 

ian1944

Member
Joined
13 Dec 2012
Messages
691
Location
North Berwick
Deeply unsurprising, the fact that houses in Midlothian will cost more is seen as a good thing. Of course, such articles are always written by members of the property-owning advantaged class.
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
They'd have been working by now if they'd built it in sections. Hope we aren't seeing similar problems here.

If only they had...

A direct tram service from Edinburgh Park Station, through Edinburgh Park, the Gyle and onto the Airport would have been busily generating a contribution for years.
 

lancastrian

Member
Joined
2 Jan 2010
Messages
537
Location
Bolton, Lancashire
From what I have heard in the past, there is more chance of Fort William FC winning the Scottish Premiership, than to see the continuation of this line onwards in the direction that you state and reaching Carlisle..:roll:

That comment about Fort William FC winning the Scottish Premiership really made me laugh. I would be surprised if they could ever win the Highland League.