northwichcat
Veteran Member
Rail Journal said:BRITISH rolling stock leasing company Eversholt Rail has awarded Bombardier a two-year contract worth more than £30m to overhaul the fleet of 40 class 365 EMUs used by First Capital Connect.
The work will be carried out at Bombardier's Ilford depot in Essex and the first train is due to be completed early next year. Eversholt had originally placed the contract with Railcare, but the work was retendered after Railcare entered administration in July 2013.
The contract covers heavy maintenance of underfloor equipment, refreshed interiors, and upgrading of passenger information systems. Additional work will be carried out in spring 2014 to bring the trains in line with the latest accessibility standards, including the installation of two wheelchair bays and wheelchair-accessible toilets.
The dual-voltage four-car trains were built in 1994-1995 and are used on outer suburban services from London King's Cross to Peterborough, Cambridge, and King's Lynn.
http://www.railjournal.com/index.php/rolling-stock/bombardier-to-overhaul-british-emus.html
I imagine we'll see a number of similar stories over the next few years but it's good the refurbishments aren't all being left until 2017.
