Hi All,

Blyton Road just north of Gainsborough is closed at the railway bridge where local gen says a truck carrying a forklift hit it a few weeks ago.

I haven’t seen anything about the railway being closed but the road is apparently closed for more weeks if not months.

Seems strange that the road is closed for so long.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DelW

Established Member
Joined
15 Jan 2015
Messages
5,961
If I've got the right location, I read about this recently but I can't now track down where.

IIRC temporary heavy duty props have been put in place below the bridge deck, allowing the line to stay open but blocking the road. The timescale for a permanent repair is indeed several weeks.

(Edit: found it in New Civil Engineer. Limited extract below as it's presumably copyright)
Engineers began emergency work to repair a damaged railway bridge on Saturday, 9 March, which has caused the A159 between Morton and Blyton, near Gainsborough, to close.

The road has been closed since mid-February following the underside of the bridge being struck by a vehicle, causing structural damage.

Network Rail teams installed temporary heavy-duty props which allowed the railway line above to remain open. It was being used as a major freight diversion due to planned work in the Keadby area.

Plans have been agreed to repair the damage to the bridge, however work can only be carried out when no trains are running. The repairs were carried out on Saturday 9 and Sunday 10 March, with some follow up work carried out throughout the remainder of this week.

The road is scheduled to reopen on Saturday 16 March.
It was dated a week ago so I don't know whether that reopening date was met. If so it was a relatively quick repair.
 
Last edited:
Joined
14 Mar 2021
Messages
211
Location
Glasgow
If I've got the right location, I read about this recently but I can't now track down where.

IIRC temporary heavy duty props have been put in place below the bridge deck, allowing the line to stay open but blocking the road. The timescale for a permanent repair is indeed several weeks.

(Edit: found it in New Civil Engineer. Limited extract below as it's presumably copyright)

It was dated a week ago so I don't know whether that date was met. If so it was a relatively quick repair.
See the Network Rail Media Centre article Network Rail to carry out emergency work to railway bridge to allow Gainsborough road to reopen
 

ricoblade

Member
Joined
28 Sep 2015
Messages
540
If I've got the right location, I read about this recently but I can't now track down where.

IIRC temporary heavy duty props have been put in place below the bridge deck, allowing the line to stay open but blocking the road. The timescale for a permanent repair is indeed several weeks.

(Edit: found it in New Civil Engineer. Limited extract below as it's presumably copyright)

It was dated a week ago so I don't know whether that reopening date was met. If so it was a relatively quick repair.
No - I heard it was now June (through local social media so no idea if that’s right). It was still closed on Saturday.
 