Well I have repeatedly read reports that are nearly seven hundred million tonnes of slate waste rock scattered around various quarries in the vicinity of Blaenau Festiniog.
I have also repeatedly read that this rock would be useful in the Severn Estuary for barrage/dyke construction in connection with tidal power or simply poldering as much of the Estuary as possible.
The question in that case becomes, assuming such a project is undertaken, how does one move that much rock across Wales?
It is too far for a conveyer system and attempting to ship around the coast via Barge looks to be fraught with difficulties, so the only option really is rail transport, presumably to a new terminal constructed somewhere near Llanwit Major or Barry (depending on what project is actually being built).
Is there sufficient rail capacity to cope with what would probably have to be several long, heavy trains a day? (Double Class 70 heavy even? if you attempt the tidal lagoon concept instead of a simple barrage). Especially since reopening a direct North-South Wales link line to carry the traffic is rendered untenable by the line to Bala from the Vale of Conwy being under a reservoir now.
So anyone got anything?
I have also repeatedly read that this rock would be useful in the Severn Estuary for barrage/dyke construction in connection with tidal power or simply poldering as much of the Estuary as possible.
The question in that case becomes, assuming such a project is undertaken, how does one move that much rock across Wales?
It is too far for a conveyer system and attempting to ship around the coast via Barge looks to be fraught with difficulties, so the only option really is rail transport, presumably to a new terminal constructed somewhere near Llanwit Major or Barry (depending on what project is actually being built).
Is there sufficient rail capacity to cope with what would probably have to be several long, heavy trains a day? (Double Class 70 heavy even? if you attempt the tidal lagoon concept instead of a simple barrage). Especially since reopening a direct North-South Wales link line to carry the traffic is rendered untenable by the line to Bala from the Vale of Conwy being under a reservoir now.
So anyone got anything?