I had a quick whizz down to the Salfords today, via Bolton.
I couldn't see any wiring changes since Monday, but:
1. The buffet at Bolton was open and doing business
2. Work was in progress on the unfamiliar structures near Squeeze Belly and Balustraded bridges
3. The lift to the westbound platform at Salford Central was back in action after a long closure
I reckon Salford Central looks wire-ready.
Handful of photos added to the Combined Volume here:
https://www.flickr.com/photos/127646831@N03/albums/72157661069863633
We're away again from tomorrow morning to Sunday pm. Please send images as usual. I should be able to process any received before 21:00 today today and owt after than on Sunday evening.