Blackpool - Manchester Electrification

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
OCR wiring train is booked for end of next month

That’s fantastic news. Hopefully a final push on the missing masts in the next few weeks.

It *seems* like they are nearly ready for wiring. But then again, when you look at the entire line I thought they’d need a blockade, and this is what’s been announced to catch up.
 

ALX400

Member
Joined
7 Dec 2009
Messages
326
Location
Bolton
My eyes have indeed deceived me whilst driving past, the mast on the platform at Blackrod hasn’t yet got its top half it’s the one behind it I caught glimpse of, will keep aclook out this weekend though
 

wrinkley

Member
Joined
6 Feb 2015
Messages
130
Things are moving on again at Lostock, the crossbar is up and another one has been assembled ready to go on the last portal. Orangemen are putting up four runs of HV cable duct between the substation and the station platform. Photos sent to Dave.
Mr Locke and others, I have sent a photo of a vent below P3 at Bolton, is this part of the subway, it seems to line up with the wooden sleepers on P1.
 

nw-sparks

Member
Joined
10 Oct 2013
Messages
271
Location
Liverpool
I've lost track of what's been announced so maybe everyone here already knows this, but the Future Engineering Works notice on National Rail now shows weekend closures at Salford Crescent until 4 November.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Presumably closing Salford Crescent every weekend also closes the Atherton line, which does not have any other work going on? Are they actually working at Salford Crescent every weekend?
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,461
Location
Preston Lancs
Presumably closing Salford Crescent every weekend also closes the Atherton line, which does not have any other work going on? Are they actually working at Salford Crescent every weekend?
It seems crazy - surely the line and overrun at Salford Crescent should have been wired up first so that at least Atherton line trains could run. I suppose there must be a method to the seemingly apparent madness.
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
The downpipes fastened onto the footbridge at Buckshaw Parkway have now sprouted registration arms, currently cable tied to the underneath of the bridge.

Earth wire now runs from Buckshaw Parkway to the beginning of the cutting for the Flying Arches. There is also an AT cable for most of that distance too, this is on the Down Bolton.

After Chorley tunnel again is a short section of earth cable and AT cable, stopping just short of the Rylands footbridge.
 

John Boy

Member
Joined
23 Jan 2016
Messages
22
Wow, thought my eyes where deceiving me when I first saw this. I took a 30 sec video so I didn't miss the brother of all bases. On Tuesday it was shuttered and steel in but no concrete.

Today it's been concreted and the shuttering has been removed. Yes removed.

The video is too large to load so I took a couple of screen shots.
 

Attachments

  • Big Brother.jpg
    Big Brother.jpg
    437.9 KB · Views: 87
  • Brother.jpg
    Brother.jpg
    374.6 KB · Views: 83

Inox

Member
Joined
2 Jan 2011
Messages
137
yeah, isn't it to do with the reaction of the chemicals in the concrete what means it's exothermic and you need water to chill it while it's curing?
saw something on the Hoover Dam where they used liquid/chilled CO2 to make sure it went off right.
 

themiller

Established Member
Joined
4 Dec 2011
Messages
1,380
Location
Cumbria, UK
The civils on projects at my place of work when laying a concrete road in hot weather would lay sacking on it before finishing for the night and hose it with cold water to stop it from drying too quickly.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,461
Location
Preston Lancs
The civils on projects at my place of work when laying a concrete road in hot weather would lay sacking on it before finishing for the night and hose it with cold water to stop it from drying too quickly.

Correct or add retarder or even a chemical cure to the surface. This basically forms a thin film to stop the water evaporating. Water cement is an exothermic reaction so the last thing it needs is even more heat as per Hoover Dam
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Bill Morton has kindly sent a shot of foundations in place at Red Moss crossing/footbridge-to-be. As the caption says, it is due to be craned in this weekend.... I hope someone can get lens on, I definitely can't...

I've added Bill's shot to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157650900509369

As he mentioned above, Wrinkley has sent shots of encouraging development at severl sites.

I've added them to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157654034635234

With these Wrinkley has passed the 1300 images mark.

I've added both sets to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

Thanks to both of you.
 

Ploughman

Established Member
Joined
15 Jan 2010
Messages
3,097
Location
Near where the 3 ridings meet

lancastrian

Member
Joined
2 Jan 2010
Messages
537
Location
Bolton, Lancashire
Things are moving on again at Lostock, the crossbar is up and another one has been assembled ready to go on the last portal. Orangemen are putting up four runs of HV cable duct between the substation and the station platform. Photos sent to Dave.
Mr Locke and others, I have sent a photo of a vent below P3 at Bolton, is this part of the subway, it seems to line up with the wooden sleepers on P1.

Yes that is where the old subway was. Sometimes the only light you had in daytime was through those vents.
 

42626

Member
Joined
9 May 2011
Messages
130
Location
Horwich
Crane at Blackrod this morning. Chatting to a couple of orangemen and it is for offloading Red Moss footbridge onto the rail for transport down to Red Moss. Stairs should be in this afternoon and span tonight.
 

42626

Member
Joined
9 May 2011
Messages
130
Location
Horwich
Red Moss Footbridge staircase passing through Blackrod Station today after being offloaded just north of Blackrod Station
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
With the warm weather in UK there i now a threat of hose pipe bans in parts of the NW looming (in addition to those declared in Northern Ireland). In terms of using concrete etc and water being needed what effect, if any, does this have in construction timescales of the OLE foundations and anything else requiring water?
 

The_Engineer

Member
Joined
24 Mar 2018
Messages
524
With the warm weather in UK there i now a threat of hose pipe bans in parts of the NW looming (in addition to those declared in Northern Ireland). In terms of using concrete etc and water being needed what effect, if any, does this have in construction timescales of the OLE foundations and anything else requiring water?
I understand that hosepipe bans are usually for domestic user only, at least initially. Industrial uses should not suffer.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,461
Location
Preston Lancs
With the warm weather in UK there i now a threat of hose pipe bans in parts of the NW looming (in addition to those declared in Northern Ireland). In terms of using concrete etc and water being needed what effect, if any, does this have in construction timescales of the OLE foundations and anything else requiring water?
I understand that hosepipe bans are usually for domestic user only, at least initially. Industrial uses should not suffer.

Is my understanding too. Also, there were from the last official report only 3 bases to do anyway on the scheme. Quite a few masts left to do though.
 

01jg

New Member
Joined
20 Aug 2017
Messages
4
Orange army erected Another mast up at chorley station today ! There could be more .. but the second one was up at 2, as I was driving past
 