Overhead Conditional Renewals apparently
OCR is a leading UK awarding body. We provide qualifications which engage people of all ages and abilities at school, college, in work or through part-time learning programmes.
OCR wiring train is booked for end of next month
Nearly - Overhead Condition Renewals. Formerly the West Coast Route Modernisation OLE Alliance Wiring Train team, but now expanded somewhat and Network Railified.Overhead Conditional Renewals apparently
It seems crazy - surely the line and overrun at Salford Crescent should have been wired up first so that at least Atherton line trains could run. I suppose there must be a method to the seemingly apparent madness.Presumably closing Salford Crescent every weekend also closes the Atherton line, which does not have any other work going on? Are they actually working at Salford Crescent every weekend?
With current weather, no problem on the curing
And that's a magnificent lump of concrete!Not so much "cured", as "baked"...….And that's a magnificent lump of concrete!
The civils on projects at my place of work when laying a concrete road in hot weather would lay sacking on it before finishing for the night and hose it with cold water to stop it from drying too quickly.
https://www.bbc.co.uk/news/uk-england-manchester-44601022A water taxi service - or Waxis - for tourists and shoppers in Manchester has sunk after two years.
The temporary closure of the canal, caused by work on the Ordsall Chord rail link, meant the loss of a £1m grant to build access ramps, landings and pontoons.
—, Wrinkley has sent shots of encouraging development at several sites. I've added them to his album here:
https://www.flickr.com/photos/127646831@N03/albums/72157654034635234
With these Wrinkley has passed the 1300 images mark.
Things are moving on again at Lostock, the crossbar is up and another one has been assembled ready to go on the last portal. Orangemen are putting up four runs of HV cable duct between the substation and the station platform. Photos sent to Dave.
Mr Locke and others, I have sent a photo of a vent below P3 at Bolton, is this part of the subway, it seems to line up with the wooden sleepers on P1.
I understand that hosepipe bans are usually for domestic user only, at least initially. Industrial uses should not suffer.With the warm weather in UK there i now a threat of hose pipe bans in parts of the NW looming (in addition to those declared in Northern Ireland). In terms of using concrete etc and water being needed what effect, if any, does this have in construction timescales of the OLE foundations and anything else requiring water?
With the warm weather in UK there i now a threat of hose pipe bans in parts of the NW looming (in addition to those declared in Northern Ireland). In terms of using concrete etc and water being needed what effect, if any, does this have in construction timescales of the OLE foundations and anything else requiring water?
I understand that hosepipe bans are usually for domestic user only, at least initially. Industrial uses should not suffer.