Blackpool - Manchester Electrification

Status
Not open for further replies.

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,567
Location
Lancashire
Bradkirk footbridge being erected
 

Attachments

  • FE8670A5-D15A-486B-8AEB-ECAA96DE7D39.jpeg
    FE8670A5-D15A-486B-8AEB-ECAA96DE7D39.jpeg
    965.3 KB · Views: 79
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Elecman has earned his bonus point by sending his fine shot for publication with our other material.

I've created an album for him here:

https://www.flickr.com/photos/127646831@N03/albums/72157692235184161

and added it to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

The bridge is a few hundred yards beyond the bridge visible in the very first photo in the Combined Volume.

Thank you Elecman, this shot is as welcome as your written contributions to this thread over the last months.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,567
Location
Lancashire
Not actually my photo but lifted from the NR Project just sent it in to show it’s progress
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Not actually my photo but lifted from the NR Project just sent it in to show it’s progress

Oh. Does that put me in a spot? I go to some trouble to respect copyright, can you please get the OK to use this image? Otherwise I must withdraw it.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK

ALX400

Member
Joined
7 Dec 2009
Messages
326
Location
Bolton
The excavations for that "gravity pad" at Blackrod are massive.
Just for a single cantilever (probably).

Al keep mi eye on that, I was talking to an Orangeman last week and they are on with mast bases on the station plus bonding everything to earth
 

a_c_skinner

Established Member
Joined
21 Jun 2013
Messages
1,699
With apologies as I suspect this question is either stupid, answered already, public domain or simply imponderable.

How does all this pan out as regards a date for electric trains between Preston and Manchester? Does anyone have any idea?

Apologies again.

Andrew
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
With apologies as I suspect this question is either stupid, answered already, public domain or simply imponderable.

How does all this pan out as regards a date for electric trains between Preston and Manchester? Does anyone have any idea?

Apologies again.

Andrew

Latest rumours say mid-July according to post #6357, not rubbished in subsequent discussion.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
The various Scottish Twitter threads have wonderful pictures of icicles in Winchburgh (now open) Bishopton and Dalreoch tunnels, hence the delay in reopening these routes. Pantographs and icicles don't mix.
 

themiller

Established Member
Joined
4 Dec 2011
Messages
1,380
Location
Cumbria, UK
With apologies as I suspect this question is either stupid, answered already, public domain or simply imponderable.

How does all this pan out as regards a date for electric trains between Preston and Manchester? Does anyone have any idea?

Apologies again.

Andrew
At an IET lecture at Preston on 07th February given by the senior engineer on the Preston - Blackpool project, it was stated that it would be August 2018! It's at the May 2018 timetable change for Preston to Blackpool
 

a_c_skinner

Established Member
Joined
21 Jun 2013
Messages
1,699
That seems plausible. Perhaps we should go for the December timetable change for tidiness?

The really sad thing is we are about to wind down electrification so all these hard learned lessons will have been forgotten when we re-start.
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,609
That seems plausible. Perhaps we should go for the December timetable change for tidiness?

The really sad thing is we are about to wind down electrification so all these hard learned lessons will have been forgotten when we re-start.

We can but keep our fingers crossed for the Transpennine Route Upgrade announcement!
 