Is the south line currently working? Thought the whole lot had been cut off but after reading that I'm curious as to what's going on.. I believe there is a new signal at Blackpool South which seems odd considering its a single line with no passing points.

The original method of working was before a train left Blackpool South the train crew had to phone the signaller to check that the airport hadnt requested an emergency line blockage, the same applied before a train left St Annes for Blackpool South. Instigated after the aircrash in the early 1970s where the plane hit the track after failing to get airborne before ploughing into Pontins afaik
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

superkev

Established Member
Joined
1 Mar 2015
Messages
2,856
Location
west yorkshire
The original method of working was before a train left Blackpool South the train crew had to phone the signaller to check that the airport hadnt requested an emergency line blockage, the same applied before a train left St Annes for Blackpool South. Instigated after the aircrash in the early 1970s where the plane hit the track after failing to get airborne before ploughing into Pontins afaik
I thought Blackpool airport is just about closed.
I believe it was closed totally for a while before the council bought it back from Balfour Beaty was it.
K
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,556
I thought Blackpool airport is just about closed.
I believe it was closed totally for a while before the council bought it back from Balfour Beaty was it.
K

Even after commercial flights ended and Blackpool Airport was closed train crew were still required to phone for permission to pass the runway as it was a local instruction in the Sectional Appendix. If Kirkham
 

driver_m

Established Member
Joined
8 Nov 2011
Messages
2,248
You'd think there would be emergency signals like those at Valley on Angelsey. Broughton Airbus has a connection to Chester PSB I'm led to believe for a similar incident. I've also been stopped at Birmingham International for an emergency landing. Anyway, I digress. Nothing as yet on dates for extending the OLE showing in the notices yet around Blackpool in latest Weekly Notices.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,479
Location
Preston Lancs
Lots still to do, but also lots done since Graham and I toured on 29 Dec.

Smashing photos.

Indeed particularly in IMG 3978 considerable progress since our Jaunt on Dec 29th - only 8 days ago. For those of you that don’t know me, I am a “ glass is half full” person.
 

Railrover700

Member
Joined
23 Jan 2016
Messages
71
Indeed particularly in IMG 3978 considerable progress since our Jaunt on Dec 29th - only 8 days ago. For those of you that don’t know me, I am a “ glass is half full” person.
I agree that the OHLE looks to be moving on well, but I am wondering about what state the station will be in when the Blackpool South service resumes.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,479
Location
Preston Lancs
I agree that the OHLE looks to be moving on well, but I am wondering about what state the station will be in when the Blackpool South service resumes.

I assume that the platform will be open but allows them to continue work on the new platform, lifts etc. I also assume, it is not absolutely vital that all the wires are installed between Tom Benson Way and Kirkham. 2 trains per hour to Blackpool South should not really be disruptive so I am still not concerned at this moment.
 

Malay States

Member
Joined
24 Jan 2017
Messages
56
I agree that the OHLE looks to be moving on well, but I am wondering about what state the station will be in when the Blackpool South service resumes.
This is getting interesting. A random look at RTT (31 January) shows BPS line trains passing at Kirkham at xx17/xx19, inward at Platform 1 and outward with no platform showing. Man Vic trains arrive at xx29 and return at xx38, both platform 2, these being the times for the middle of the day. All this assumes that Kirkham is fully operational and that outward BPS trains will use the new platform, the ' no platform showing' meaning that RTT doesn't know about Platform 3.
My contact at Northern assures me that BPS services will start on the 29th, and a guard I was speaking to this week told we that the word among the staff was that Blackpool North was ahead of schedule. Kirkham looks far from nearing completion and as recent photos show, the shuttering for the concrete base for one of the lift towers is there but no concrete poured. Three weeks to go.
Regarding Salwick, the road closure sign on Station Road has reappeared at the Clifton end (but not at the other end) giving closure for 10 nights from 13th January - I think it was nights and not days; will check next time I go.
 

Malay States

Member
Joined
24 Jan 2017
Messages
56
To reply to my own post (5831), I've checked on the Lancashire CC website and found that Station Road, Salwick, is to close 22.00-06.00 13th to 26th January. It is indeed for parapet works.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Reg sent another photo he took earlier today, but had omitted in error, it breaks new ground, being our first from Gt Moor Street (not LNWR).

I've added it to his album, here:

https://www.flickr.com/photos/127646831@N03/albums/72157671732263863

Wrinkley has added to the fine crop he's taken in recent days by taking his camera on a trackside walk from Lostock to Moor Lane.

I've added the results to his album here:

https://www.flickr.com/photos/127646831@N03/albums/72157654034635234

I've added both their works to the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

Thank you both.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,571
Location
Lancashire
Correct the one furthest away is a signalling REB the larger nearer one is the new electrification TSS
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Lovely photos all. Great to see the progress.

Kirkham in days gone by. Certainly was a junction and a half

https://c1.staticflickr.com/6/5778/23319777933_d9a6b6d429_b.jpg

https://www.flickr.com/photos/ingythewingy/23319777933

Wonderful links, thank you very much.

-------------------------------------------------------

Yesterday I had the pleasure and privilege of a guided tour of several worksites between Preston and Blackpool North, by kind courtesy of Network Rail.

I had a list of prepared questions which my host has agreed to answer with thought rather than off the top of his head, I'll publish his replies in due course.

On site he used my camera to take the shots linked below.

Throughout the afternoon he spoke with impressive knowledge and understanding of the project, plus good humour and tolerance of a lay numpty.

The $64000 question he had no difficulty with - "Are we 'on' for Blackpool South at the end of January and opening for electric trains in March?" Unequivocal "Yes". Problems of supply have been resolved, the cause basically being the sheer scale of NR's projects across the land; the other threat was, as always, the weather, but the Met. say it will be generally mild for the next three months.

Please note: being open for electric trains does NOT equal electric services WILL run then, it means they CAN run from then. Presumably there will have to be training, testing and goodness knows what before the timetable change in May, when sparks should fly.

The photos are in the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

Warm thanks to NR and my fine, friendly and professional guide.
 

DJH1971

Established Member
Joined
10 Jun 2012
Messages
1,751
Location
St Helens, Merseyside
Wonderful links, thank you very much.

-------------------------------------------------------

Yesterday I had the pleasure and privilege of a guided tour of several worksites between Preston and Blackpool North, by kind courtesy of Network Rail.

I had a list of prepared questions which my host has agreed to answer with thought rather than off the top of his head, I'll publish his replies in due course.

On site he used my camera to take the shots linked below.

Throughout the afternoon he spoke with impressive knowledge and understanding of the project, plus good humour and tolerance of a lay numpty.

The $64000 question he had no difficulty with - "Are we 'on' for Blackpool South at the end of January and opening for electric trains in March?" Unequivocal "Yes". Problems of supply have been resolved, the cause basically being the sheer scale of NR's projects across the land; the other threat was, as always, the weather, but the Met. say it will be generally mild for the next three months.

Please note: being open for electric trains does NOT equal electric services WILL run then, it means they CAN run from then. Presumably there will have to be training, testing and goodness knows what before the timetable change in May, when sparks should fly.

The photos are in the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

Warm thanks to NR and my fine, friendly and professional guide.

Need more of an idea when Manchester to Preston will be ready.
 

Vtdriver

Member
Joined
27 Oct 2015
Messages
9
Apologies for not being infrastructure related but does anyone know what electric traction Northern are planning on running on this line?
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,479
Location
Preston Lancs
I assume 9272g + e are bases for a new bridge to replace Preese Hall Farm crossing?

9268g is what I call very serious deveging
 