LDECRexile
Established Member
I see there are quite a lot in the pictures from your guide.
Great!
I see there are quite a lot in the pictures from your guide.
I see there are quite a lot in the pictures from your guide.
Great!
Info for observers and photographers:
The Kirkham station footbridge will arrive on site and be lifted into place on 15th January.
So earth wires at Salwick then?
Do we think these are continuous from Fylde Jn?.
Almost certain to be a tamper.There’s a Path booked from Preston to Adlington shortly on RTT via Bolton 604U it’s an engineering one does anyone happen to know what it may be, it says diesel loco 715 tonnes Tamper prehaps
I love the pencils by the way - I assume they are to aid in the penetration of hard rock?
Wonderful links, thank you very much.
-------------------------------------------------------
Yesterday I had the pleasure and privilege of a guided tour of several worksites between Preston and Blackpool North, by kind courtesy of Network Rail.
I had a list of prepared questions which my host has agreed to answer with thought rather than off the top of his head, I'll publish his replies in due course.
On site he used my camera to take the shots linked below.
Throughout the afternoon he spoke with impressive knowledge and understanding of the project, plus good humour and tolerance of a lay numpty.
The $64000 question he had no difficulty with - "Are we 'on' for Blackpool South at the end of January and opening for electric trains in March?" Unequivocal "Yes". Problems of supply have been resolved, the cause basically being the sheer scale of NR's projects across the land; the other threat was, as always, the weather, but the Met. say it will be generally mild for the next three months.
Please note: being open for electric trains does NOT equal electric services WILL run then, it means they CAN run from then. Presumably there will have to be training, testing and goodness knows what before the timetable change in May, when sparks should fly.
The photos are in the Combined Volume here:
https://www.flickr.com/photos/127646831@N03/albums/72157661069863633
Warm thanks to NR and my fine, friendly and professional guide.
Dave does a huge amount of work so I do not want to pester him - but an updated - schematic - progressometer overview would be extremely useful please and thanks ifat all possible with family etc commitments .
I think the Progressometer as a document has had its day. I was pleased to develop and drive it in the early days covering Liverpool-Manchester when going out with A4 pad and pencil drawing five bar gates of bases and masts and wires from train windows was different, productive and fun. The fact that a handful appreciated it was a bonus. Things have moved on, or, more accurately, I have moved on. I have developed the photography side from small beginnings and quite honestly it's taken over, both in scale and interest and, from feedback, in value "out there". It does not preclude factual descriptions in any way, but it definitely precludes five bar gates, I've even tried it and find myself losing the plot because I'm wanting to examine a dead foot crossing or a particular missing base, all from a speeding train window.
The second reason the P is dead in the water is Preston-Blackpool, where updating it is literally impossible because no trains run.
I still tip my cap to P on each day's train tour, when I try to write a prose summary of things done and things to do. I realise this is inconsistent and difficult for others to contribute to because it isn't in a consistent structure.
The only way I can see Son of P working would be for someone to replicate P's underlying spreadsheet, which is only the stretches between stations, and set it out as a list for people to post notes in that format, eg Salford Crescent-Clifton "three new bases on southbound side north of Agecroft Bridge" (I wish!) This would probably need a bit of maintaining and management because people will likely send in stuff higgledy-piggledy, so the "manager" will need to be able to take the view that such things are usually better than nothing. DJH1971 would seem just the chap to continue to develop the role of demanding other people do lots of work.
Photo 9260i is an interesting example of art vs science, at impression level it says "Yo! masts galore, wow fab groovy." Close examination reveals one missing base, three missing masts and lots of missing danglies. Both the wow and the detail are valuable, I think Son of P should strive to balance both views and should put the missing items in perspective, which this thread tends to be good at. My summary of the data in 9260i is "A few details to finish off, but well ahead of the game for early January."
The other, unsung and unappreciated side of the task was the enormous effort it took to persuade Murphy's to move that damned great tower thing to line up right in the background.
If anyone is interested there is a lecture at Istem centre Preston College on the evening of February 7th by Ryan Duff the Senior Project Manager on the Preston Blackpool Electrification scheme.
When you say delay do you mean not ready for May timetable change. If so its unfortunate but no surprise to many. Also your news comes just as TP and Northern are starting to have timetables uploaded to OTT showing electric running on this line.
I do not want to be a party pooper -but I just heard from an insider (impeccable source) in London, expect a delay on the Manchester - Preston section of this project. His words were - they are well behind. Do not know if this will be officially announced and NR come clean, but expect a delay folks.
Also your news comes just as TP and Northern are starting to have timetables uploaded to OTT showing electric running on this line.
I would choose 1, provided there's the stock to cover it.ALERT - Speculation only on my part - if the Blackpool - Preston sparks project is running to time there are still options - not ideal but still options.
1)Run diesels throughout until Preston- Manchester is complete.
2) Electrics Preston - Blackpool - diesel to Manchester - creates horrendous platform problems at Preston.
3) FOCUS, FOCUS, FOCUS on Preston to Bolton and run electrics Blackpool - Bolton and diesel shuttle to Manchester stations.
4) Run via Electrics via Chat Moss and diesels Preston- Bolton
5) Some combination of above
There are options albeit not necessarily good ones
I would choose 1, provided there's the stock to cover it.
People might have to wait a little longer for newer trains but you avoid the issues with options 2-5.
6) Use Class 769's which should be available IF testing goes to planALERT - Speculation only on my part - if the Blackpool - Preston sparks project is running to time there are still options - not ideal but still options.
1)Run diesels throughout until Preston- Manchester is complete.
2) Electrics Preston - Blackpool - diesel to Manchester - creates horrendous platform problems at Preston.
3) FOCUS, FOCUS, FOCUS on Preston to Bolton and run electrics Blackpool - Bolton and diesel shuttle to Manchester stations.
4) Run via Electrics via Chat Moss and diesels Preston- Bolton
5) Some combination of above
There are options albeit not necessarily good ones
6) Use Class 769's which should be available IF testing goes to plan
6) Use Class 769's which should be available IF testing goes to plan