Several points have been delivered to Blackpool North, residing opposite the carriage sidings on the down side.
Several points have been delivered to Blackpool North, residing opposite the carriage sidings on the down side.
I wonder how many lines will exist in Blackpool North Carriage Sidings once remodelling has been completed?Have you seen the weird looking set of points near where the platelayers hut used to be? Looks like 4 points in 1!
I wonder how many lines will exist in Blackpool North Carriage Sidings once remodelling has been completed?
Have you seen the weird looking set of points near where the platelayers hut used to be? Looks like 4 points in 1!
Photo required for positive ID, could be one two things ...
Are the resurfaced platforms at Bolton ever so slightly lower than they were, or is it just me?
ALX400 has kindly sent shots of Anderton Hall level crossing.
I've added them to his album here:
https://www.flickr.com/photos/127646831@N03/albums/72157651121057352
and to the Combined Volume here:
https://www.flickr.com/photos/127646831@N03/albums/72157661069863633
Thank you ALX.
Does the Right hand arrowed 75 Speed sign 8292k apply to the crossover in the distance?
Seems a bit short and sharp to be capable of 75 through the crossover.
Or is it just the camera giving the wrong impression?
To allow water to drain into the new slot drain, in turn required by the cutting back of the canopy which is allowing rain to hit the platform ?
in a separate but related issue, how are they going to wire P1 at Salford Crescent? There doesn't appear to be enough room for a base unless it's going on the platform itself..
I've wondered this, too, as have others such as LNW-GW. The only ways I can see are:
1 stretch some sort of mega gallows over the station from the east
2 attach something to the station structure
3 plant a mast or two just off railway land to the west, ie immediately beyond the fence.
Assuming a deal can be struck with the neighbour, 3 should be doable. For a precedent see masts on the south side of the Chat Moss route between St Helens Junction and Collins Green.
At this, point may I ask what the problem with putting the mast bases at the back edge of the platforms is? It seems to happen in other places.
stretch some sort of mega gallows over the station from the east
("Electrification? in the north? you're having a laugh").
In one of those long forgotten plans that showed the Crescent with four platforms there was a platform and a second line on platform 2 side which to me says that NR (might) already own a sizeable chunk of land. I am going to guess that they will put some piles into the embankment/wall and just place the OHLE stanchion into the slot, its not like they have a lot of choice!
Good find snowball!
So that shows for certain that NR own a least a thin bit of land for any structures to be placed. I am thinking a similar set up to how they have that signal just before Farnworth tunnel on the Manchester bound side with metal work all around it.
As I previously posted on another thread....I'd love to be shot down with evidence that all's well for kick-off at Xmas.....
The TPE provisional timetable information on the same website shows all the 350-operated Manchester Airport to Glasgow/Edinburgh services switching from the Chat Moss line to the Chorley line from Monday 12 Feb 2018. So maybe that is now the target for the wires to go live.
This is Crescent - not Central. In case you haven't been, its a very* narrow island platform with a back-to-back cantilever roof. I didn't design it but I'd image you would be into significant structural alterations to drop the masts in, and they won't be small for a back-to-back twin track cantilever - I bet all the M&E etc. runs close to centre as well.
*very, as in "ORR don't like it".
As I previously posted on another thread....