• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Blackpool - Manchester Electrification

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,486
Location
Over The Hill
The rules for the length of the over-run are a bit excessive, anyway, but the long over-run towards Westhoughton is only to get the end of the wire onto a straight-ish bit of track ,so that the Phase 7 neutral section can be built there (later).

Being somewhat familiar with the route your explanation makes perfect sense, thank you. I am going to extrapolate and suggest that the "excessive" over-run rules would also explain why it would appear a decent length of the Blackburn line is receiving attention at Bolton station.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,574
Location
Brighton
I'd always assumed, based on no experience or evidence, that if a crew was doing a piling session and they knew they only had time to get one partly in before having to hand possession back it would be better to do that and return later to finish off, rather than waste that bit of time.

This doesn't contradict your suggestion.

Alternatively, could be as simple as piling until something crops up that means a given pile will take more time than normal, then moving on with a view to getting as many piles complete as possible so the next team can come in ASAP to get started whilst the piling team go back and finish off the troublesome ones...
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
The WCML didn't wire any of its overrun connections around Earlestown/Newton le Willows, nor the Liverpool line at Springs Branch (nor the Bolton line at Euxton).
There is a short length of 1974 wiring towards Blackpool at Fylde Jn.
I suppose it depends on the neutral section strategy.
If you overran the east end of the platforms at Manchester Victoria you would be in trouble too.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Excellent news: 141trackworker has kindly given permission to link his growing collection of photos to the Combined Volume.

He is what his name suggests, someone out there dressed in orange come rain, snow or midnight gale. His photos show a side to the project most of us can only guess at.

As with other linked material, his growing collection can be accessed by going into the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

then clicking on the very first image and looking down the "Comments" until you find his material, clck on the link and off you go.

Warm welcome 141, thank you for taking such trouble.

Dave
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Gralistair has been spring cleaning and come across three shots he took back in 2013 of bridge works at Lea Road between Preston and Salwick.

I have put them into a temporary album here:

https://www.flickr.com/photos/127646831@N03/albums/72157678710119421

and into Graham's album here:

https://www.flickr.com/photos/127646831@N03/albums/72157651259517065

and into Volume 1 of the Manchester-Blackpool Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157648767927083

Forummers who have started viewing this thread over the last year or so may not know of the existence of Vol 1, which covers the period 1945-2015.

Thank you Graham
 

ALX400

Member
Joined
7 Dec 2009
Messages
326
Location
Bolton
A RTT check reveals most engineering paths this weekend are for the Blackpool line terminating at Kirkham during the early hours, it also looks like a measurement train is scheduled to go along the routes to be electrified as it ends up at Network Rail Derby RTC from Crewe once complete, could be something completely different though :D
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
Grabbed a few shots of Manchester's latest landmark this evening. Tremendous to see the arch in place at last and congratulations to all who have been involved. Shots of passing trains from the footbridge should be impressive later in the year.
https://www.flickr.com/photos/147280282@N07/albums/72157680620474805

Wrong thread, for many reasons.

Try http://www.railforums.co.uk/showthread.php?t=51840

Electrification Phases 3 and 4 (this thread) run from Blackpool North to Preston Fylde and from Euxton Junction to Deal Street Junction respectively.
 

Norb

Member
Joined
26 May 2014
Messages
68
I swear that I could hear pile driving going on last night around 1am in the Chorley area
(Either that or there was a maniac walking up and down the Leeds Liverpool Canal banging a big bass drum)
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
Apologies if this has been covered earlier, I only manage to dive into this thread every few days or so. In a rare daylight trip to Blackpool I counted the following;

Down Main between Preston and Salwick. Specifically between Preston Sports Centre and Lea. There were 13 piles in the ground, and on the Up line 26.

There were also several piles dropped in both cess between Preese Hall f/p crossing and Singleton.

Further, adjacent to the Up Fast at Euxton Jn are two piles in amongst existing stanchions. I'm assuming these are to facilitate the starting of the catenary for the Up Bolton line as it was just before the junction.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Alas, though such a creature would be entertaining and noteworthy, it is a base for a support for the footbridge-to-be.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,472
Location
Preston Lancs
I will be sending pics to Dave. Did a run from Fylde Jct to Lea Rd bridge which is just before Salwick. I could see no piles or scrapes Fylde Jct onwards but a worksite is set up.

I could not see anything at Lea Lane but loads of stuff at Darkinson-Sidgreaves
 

Dixie

Member
Joined
19 Feb 2012
Messages
160
Photo 6884m - the caption should read early 1970s electrification - this was, of course, a different phase from the 1960's, shown by the Mk3 catenary.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,472
Location
Preston Lancs
Just drove past the Hole in the wall on Fylde Rd. No photos sorry wife was with me and I want carnal knowledge of her tonight. Orangemen a plenty. Deveg already done . Then along Tom Benson Way. So maybe some progress to see come Monday morning.
 

ALX400

Member
Joined
7 Dec 2009
Messages
326
Location
Bolton
There must be a worksite along the line towards Horwich from Blackrod as there warning signs on the track and flashing yellow markers on the rails, the road rail equipment from the access point at Blackrod is also on the line somewhere
 
Status
Not open for further replies.

Top