I sent a load of photos to Dave. Loads of orangemen at hole in the wall, engineeers train near Sidgreaves-Darkinson and orangemen at Salwick. Further progress without doubt
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,472
Location
Preston Lancs
The wife was cooking dinner ( I believe that is called tea in England) and she wanted me out of her kitchen. I went a run out and it is tremendous news mainly.
1) zero progress at Fylde Jct but huge deveg in progress.
2)At the hole in the wall on Fylde Road deveg and a piling machine
3) At the Blackpool Rd bridge piles in place
4) Along Tom Benson way - piling in progress and major deveg
5) At Salwick piling machines loaded with piles heading towards Tom Benson Way
6) Nothing at Carr Lane
7) Engineers train loaded with ballast at Kirkham

Photos on the way to Dave
 
Last edited:

Darren R

Established Member
Joined
26 Jan 2013
Messages
1,252
Location
Lancashire
Not forgetting the other end of the line, track work must be ongoing around the Kearsley area; twenty wagons full of shiny new ballast went through Darwen heading to Kearsley from Crewe a little while ago. (Taking the scenic route! :lol:)
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,472
Location
Preston Lancs

So just opposite Alert St on the B6241 is The Hole in the Wall

Just went past again this morning and along TB way as my wife drove me to railway station to head back to the USA. I went Preston to Manchester airport via Chorley. Virtually all piles/ bases in between Euxton and Bolton. There are some short missing stretches but deveg is going on there. In my opinion there is less base completion between Bolton and Manchester. Definitely progress since my last trip from my true hometown to the airport.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,472
Location
Preston Lancs
Thank you Graham, hope you have a good flight.

Thanks not home now until Spring Bank week so 3 months. The good news there should be progress and lots of it in that time. It does mean I won't be sending any updates so relying on the rest of you please.
 
Joined
8 Aug 2014
Messages
77
Thanks, so points still in place for now. Also interesting to see progress being made on the restoration of the Fleetwood branch. Perhaps in a couple of years Poulton will be a little like Keighley, providing an interchange between a modern electrified service and a popular heritage line.

I believe you are misunderstanding the work going on here at the Blackpool end of Poulton. As I understand it, once complete, the Fleetwood branch will be disconnected, the signal box demolished and the track slewed slightly to allow for an increased speed limits. I assume the vegetation clearance work is just getting "rubbish" out the way.
 

Whistler40145

Established Member
Joined
30 Apr 2010
Messages
6,149
Location
Lancashire
That is sure some heavy engineering resources.



Remodel Kirkham - big job

Remodel Poulton-L-F

Remodel Blackpool North - big job

Resignal the lot - including Blackpool South

Finish off the wires



wowsers



No doubt the majority of this work will take place during the 3 month blockade.
 

reg

Member
Joined
15 Mar 2015
Messages
70
Location
Bolton
Just back from Bolton station, plenty to see.

End of platform 5 (old parcels loading site)being demolished.

Counted at least 2 completed piles.

Carillion worksite full of men and equipment

other gangs of workers doing jobs around the station site.Pics to follow
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
141trackworker has extended his fascinating album, which can be accesses by going into the Combined Volume here:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

then clicking on the very first image

then going down the list of Comments associated with that image until you find his album

Click on the link in that comment.

You can do the same for the other people who have kindly given permission to link to their work.
 
Last edited:

ALX400

Member
Joined
7 Dec 2009
Messages
326
Location
Bolton
7 engineering paths booked for this weekend at Bolton, 4 Saturday 3 Sunday, all starting there, Trackwork ?
 

Railrover700

Member
Joined
23 Jan 2016
Messages
71
I believe you are misunderstanding the work going on here at the Blackpool end of Poulton. As I understand it, once complete, the Fleetwood branch will be disconnected, the signal box demolished and the track slewed slightly to allow for an increased speed limits. I assume the vegetation clearance work is just getting "rubbish" out the way.

Sorry if this was unclear, by interchange I meant the proposed pedestrian link between heritage and network rail platforms. My understanding, however, is that the new track layout will allow a rail link to be re-instated if required in the future.
 
Joined
8 Aug 2014
Messages
77
Sorry if this was unclear, by interchange I meant the proposed pedestrian link between heritage and network rail platforms. My understanding, however, is that the new track layout will allow a rail link to be re-instated if required in the future.

What the PWRS proposed is that NR built a new plaform, they would take over the Preston bound platform and Northern would use the Blackpool platform as the Preston bound platform and the new one as the Blackpool bound one. That's not going to happen and, to be realistic, neither is a "serious" preserved railway.
 
Status
Not open for further replies.

Top