Blackpool - Manchester Electrification

Status
Not open for further replies.

L+Y

Member
Joined
4 Jul 2011
Messages
502
A query on the Bolton remodelling works. I think I've read somewhere that the platform 5 reinstatement is to facilitate easier overtaking, and wondered, will this be coupled with electrifying and bringing all four tracks into regular use on the short four-track section between Bolton and Moses Gate?

As an aside, how frequently are all four tracks used? I used to commute between Preston and Manchester via Bolton, and only once do I recall seeing a train on either the outermost Up or Down line.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Moonshot

Established Member
Joined
10 Nov 2013
Messages
3,806
Im sure both loops at Bolton are currently showing OOU.

We do use these loops ( I work for Northern ) from time to time, in fact the other month I was on an empties which traversed both loops in one go for some sort of integrity test.

There have been numerous occassions over the last few years when a Northern service has found itself in one of these to allow a TPE to overtake.
 

Trackman

Established Member
Joined
28 Feb 2013
Messages
4,252
Location
Lewisham
We do use these loops ( I work for Northern ) from time to time, in fact the other month I was on an empties which traversed both loops in one go for some sort of integrity test.

There have been numerous occassions over the last few years when a Northern service has found itself in one of these to allow a TPE to overtake.

Freight layover too, depending on the timing.
In the early the 90's the Queen stopped on the down line for breakfast! (booked).
 

SodTheDrummer

Member
Joined
14 May 2015
Messages
201
Location
Bolton
Taking Ann for an appointment in Bury gave me the opportunity to induct her into the mysteries of scrapes and bases on our circumnavigatory return.

I managed to wangle a location not used before here, which coincidentally included the loops mentioned just upthread.

Good news here I reckon:

https://www.flickr.com/photos/127646831@N03/albums/72157661069863633

Great shots Dave - do you know if they're planning on renewing any of the track that's on old timber bearers? i.e the loops and the bit near Orlando St bridge?
 

fflint

Member
Joined
16 Apr 2012
Messages
121
Please can any of our on the spot reporters say how the availability of the 319,s is at present. I haven't seen anything about them since they started, when they had a few teething problems.
 

PDG1949

Member
Joined
21 May 2014
Messages
323
Location
St. Helens, Merseyside
Last edited:

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
This information is taken from Northern's consultation on the December 2017 timetable change as linked by ainsworth74 in this new thread in the Allocations, Diagrams and Timetables subforum:

Between November 2017 and March 2018 the route to Blackpool North is closed with replacement road transport provided. This is to undertake electrification works on the route.

The block is in two phases:

1. From 11/11/2017 to 26/01/2018 there will be no train services from either
Blackpool North or Blackpool South through to Preston.

2. From 27/01/2018 to 25/03/2018 a train service will operate from Blackpool
South to Preston. The line between Blackpool North and Kirkham and Wesham will remain blocked.

From 26/03/2018 the full route will be re-opened, but will only be available for
diesel services.

For the period between 11th November 2017 and 19th May 2018, through services to Manchester Airport will not operate.

From 20/05/2018 the route will be energised and will be served by electric trains, enabling the restoration of through services to Liverpool and Manchester.
 

thealexweb

Member
Joined
5 Jan 2014
Messages
1,106
It looks like we have our first official confirmation that the revised deadline of December 2017 will not be met. May 2018 is the date Northern are working too. Is this really realistic considering how much there is to do? See the below slide from a Northern consultation presentation.

http://www.eavb.co.uk/ARN1217.pdf
 

Attachments

  • Northern.png
    Northern.png
    180.1 KB · Views: 88
Last edited:

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
It looks like we have our first official confirmation that the revised deadline of December 2017 will not be met. May 2018 is the date Northern are working too. Is this really realistic considering how much there is to do? See the below slide from a Northern consultation presentation

But on the three previous pages they refer to electric trains between Manchester and Preston via Bolton from December 2017, and improvements elsewhere that presumably depend on DMUs cascaded from that route.
 
Last edited:

thealexweb

Member
Joined
5 Jan 2014
Messages
1,106
But on page 5 they refer to electric trains between Manchester and Preston via Bolton from December 2017.

I know I read that as well. While it does seem conflicting I don't think the May 2018 date will have been put there by mistake.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I know I read that as well. While it does seem conflicting I don't think the May 2018 date will have been put there by mistake.
I've now edited #3707 to reflect the fact that it's not just one page but three pages that say December.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
This information is taken from Northern's consultation on the December 2017 timetable change as linked by ainsworth74 in this new thread in the Allocations, Diagrams and Timetables subforum:

That's 19 weeks of no service from Blackpool North.
It seems a long period for what seems a relatively modest upgrade.
It would not seem very hard to remodel BPN in two halves, as has happened in much busier stations in the past.
Kirkham will be messy and needs a blockade but isn't all that complex.
If they were rebuilding the formation for higher speeds I could understand it, but just to operate the existing 75mph trundle?
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,479
Location
Preston Lancs
Kirkham will be messy and needs a blockade but isn't all that complex.

What was described to me an LDECRExile aka Dave between xmas and new year by Orangemen, was complete lift of tracks, redo layout, build new platforms, reballast, new track, remove signal boxes and new signaling - and that was Kirkham. Combine Blackpool North and I assume finish off piling, installing metal work, cantilever danglies, wires etc - I can see that taking a fair while.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,610
Location
Nottingham
According to Wikipedia the Nottingham blockade in 2013 was 10 weeks. Similar size station at 6-7 platforms but only one major length of platform to be re-built.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,479
Location
Preston Lancs
According to Wikipedia the Nottingham blockade in 2013 was 10 weeks. Similar size station at 6-7 platforms but only one major length of platform to be re-built.

Indeed

https://en.wikipedia.org/wiki/Nottingham_station


However Nottingham happened right in the middle of Summer. Blackpool/Kirkham/Blackpool South were not allowed then nor later because of Illuminations so they are doing it middle of winter so I am sure extra contingency has been factored in. Your workforce will also be split as Kirkham will be going along at the same time as Blackpool plus resignalling of south line and electrification - none of this happened in Nottingham.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,571
Location
Lancashire
There can't be much resignalling of the South line it doesn't have any except for the junction at Kirkham and Moss Side Level Crossing
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Thanks to all who have contributed evidence as well as opinion to this recent info.

I may be misreading one or two comments, but I can't see anything inconsistent between Manchester-Preston being electrified from December 2017 and Preston-Blackpool being closed for chunks of time in Spring 2018 and electrified from May 2018.
 

wrinkley

Member
Joined
6 Feb 2015
Messages
130
Thanks to all who have contributed evidence as well as opinion to this recent info.

I may be misreading one or two comments, but I can't see anything inconsistent between Manchester-Preston being electrified from December 2017 and Preston-Blackpool being closed for chunks of time in Spring 2018 and electrified from May 2018.

That's the way that I read it also Dave.
 
Joined
8 Aug 2014
Messages
77
Was happy, and somewhat surprised, to see during a trip yesterday that there are a whole load of what look like piles have been laid out beside the Up line between Salwick and Lea and a few more were at the Preston End of Tom Benson Way. The gate off Tulketh Brow seems to be being used as an access point for them as there were more there.
 