A query on the Bolton remodelling works. I think I've read somewhere that the platform 5 reinstatement is to facilitate easier overtaking, and wondered, will this be coupled with electrifying and bringing all four tracks into regular use on the short four-track section between Bolton and Moses Gate?
As an aside, how frequently are all four tracks used? I used to commute between Preston and Manchester via Bolton, and only once do I recall seeing a train on either the outermost Up or Down line.
As an aside, how frequently are all four tracks used? I used to commute between Preston and Manchester via Bolton, and only once do I recall seeing a train on either the outermost Up or Down line.